← Back
Hospital staff facility
516 1 AVENUE
MANHATTAN · Murray Hill-Kips Bay · BIN 1022053
💬 Discuss this project
1960Year Built
6Stories
I4Building Class
R8Zoning
85,590 sfGross Floor Area
3Units
LL97 Covered15 Open Violations 11 unresolved · 4 paperwork only ▸FISP: UNSAFE
Hospital staff facility · 17,775 sf lot · 4.82 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalFire Protection
Roof1p · 1 filing · 20 docs
Cellar2p · 1 filing · 20 docs
Basement3p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC OCME 816103/22/2026
NYU HOSPITAL103/22/2026
N Y C DEPT OF CAS 856103/22/2026
CARLITOS CONTRACTING103/22/2026
INTERSYSTEMS403/21/2026
DEPT OF CITYWIDE ADM.SERVICES303/21/2026
DEPT OF CITYWIDE ADM SERVICES503/21/2026
NYC DEPT OF GENERAL SERVICES703/21/2026
INSPECO103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HANSEN ENGINEERING, PC407/28/2025
MG NEW YORK ARCHITECTS,PLLC102/14/2025
PATUXENT ENGINEERING LLC211/15/2023
IKRA CONSULTING LLC111/08/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONVERSANO ASSOCIATES, INC.1003/21/2026
PATUXENT ENGINEERING403/21/2026
AK CONSULTING SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MED RAY CORPGeneral Contractor507/08/2026
CARLITOS CONTRACTING CORPGeneral Contractor507/08/2026
EDUARDO ALIAGAElectrical103/21/2026
EDWARD PEREZElectrical103/21/2026
IRVING BAPTISTEElectrical103/21/2026
JANKUC, JONELElectrical103/21/2026
MARTY ALLEN ELEC'L CO.,INElectrical103/21/2026
NUNEZ, JOSEElectrical103/21/2026
OLIVER CHRISTOPHERElectrical103/21/2026
RICHARD NEUElectrical103/22/2026
RULLO, ANTHONYElectrical103/21/2026
ALLSTATE SPRINKLER LLCFire Protection107/08/2026
CARUSO, VElectrical103/21/2026
RENNON CONSTRUCTION CORPGeneral Contractor107/08/2026
DUARTE, LUIGIElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HANSEN ENGINEERING PC8174407/28/2025
MG NEW YORK ARCHITECTS, P3444102/14/2025
Building Lifecycle
All (118)Filed (8)Permit Issued (8)Signed Off (5)Facade (FISP) (12)Violation (60)Inspection (2)Special Inspection (23)
02/03/2026
Signed off — Alteration
Filing herewith for the installation of new sprinkler heads at basement loading dock modular room .
M01174010-I1
11/10/2025
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
10/29/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/04/2025
Signed off — Alteration
Filing herewith for the installation of new sprinkler heads at basement loading dock modular room .
M01174010-S1
08/04/2025
Signed off — Alteration
Filing herewith for the installation of new sprinkler heads at basement loading dock modular room .
M01174010-S3
07/29/2025
Special inspection requirement — HVAC-R and service water heating equipment
Ryan Hansen
07/29/2025
Special inspection requirement — Final
Ryan Hansen
07/29/2025
Special inspection requirement — Mechanical Systems
Ryan Hansen
07/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
07/29/2025
Special inspection requirement — Maintenance information
Ryan Hansen
07/29/2025
Special inspection requirement — HVAC-R and service water heating system controls
Ryan Hansen
07/29/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Ryan Hansen
07/28/2025
Filed — Alteration
Filing herewith for the installation of new sprinkler heads at basement loading dock modular room .
M01174010-P1
06/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
06/18/2025
Special inspection requirement — Mechanical Systems
Ryan Hansen
06/18/2025
Special inspection requirement — Final
Ryan Hansen
06/18/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Ryan Hansen
06/18/2025
Special inspection requirement — HVAC-R and service water heating equipment
Ryan Hansen
06/18/2025
Special inspection requirement — Maintenance information
Ryan Hansen
06/18/2025
Special inspection requirement — HVAC-R and service water heating system controls
Ryan Hansen
03/18/2025
Permit issued — Sprinklers
M01174010-S2-EW-SP
03/05/2025
Permit issued — Structural
M01174010-S3-ST
03/04/2025
Permit issued — Mechanical Systems
M01174010-S1-MS
03/04/2025
Permit issued — General Construction
M01174010-I1-GC
02/18/2025
Filed — Alteration
Filing herewith for the installation of new sprinkler heads at basement loading dock modular room .
M01174010-S3
02/18/2025
Filed — Alteration
Filing herewith for the installation of new sprinkler heads at basement loading dock modular room .
M01174010-S2
02/17/2025
Filed — Alteration
Filing herewith for the installation of new sprinkler heads at basement loading dock modular room .
M01174010-S1
02/14/2025
Filed — Alteration
Filing herewith for the installation of new sprinkler heads at basement loading dock modular room .
M01174010-I1
02/14/2025
Special inspection requirement — Structural Steel - Welding
Ryan Hansen
02/14/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Ryan Hansen
02/14/2025
Special inspection requirement — Post-installed Anchors
Ryan Hansen
02/14/2025
Special inspection requirement — Concrete - Cast-In-Place
Ryan Hansen
02/14/2025
Special inspection requirement — Structural Steel - High Strength Bolting
Ryan Hansen
02/14/2025
Special inspection requirement — Structural Steel - Details
Ryan Hansen
02/13/2025
Special inspection requirement — Final
Ryan Hansen
02/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
02/10/2025
Special inspection requirement — Sprinkler Systems
Ryan Hansen
08/30/2024
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED FOR PEDESTRIAN SAFETY DURING CONSTRUCTION. SIDEWALK SHED SHALL COMPLY WITH NYCC 2014 CHAPTER 33 . NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
M00767916-I1
07/12/2024
Cycle 9 facade report submitted
06/19/2024
Cycle 9 facade report signed — UNSAFE
06/12/2024
Cycle 9 facade inspection completed
04/03/2024
Permit issued — Sidewalk Shed
M00767916-I1-SH
02/22/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/07/2024
Signed off — Alteration
M00625166-I1
11/15/2023
Filed — Alteration
INSTALLATION OF SIDEWALK SHED FOR PEDESTRIAN SAFETY DURING CONSTRUCTION. SIDEWALK SHED SHALL COMPLY WITH NYCC 2014 CHAPTER 33 . NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
M00767916-P1
03/27/2023
Permit issued — Sidewalk Shed
M00767916-I1-SH
09/24/2022
Permit issued — Sidewalk Shed
M00767916-I1-SH
09/23/2022
Filed — Alteration
INSTALLATION OF SIDEWALK SHED FOR PEDESTRIAN SAFETY DURING CONSTRUCTION. SIDEWALK SHED SHALL COMPLY WITH NYCC 2014 CHAPTER 33 . NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
M00767916-I1
11/09/2021
Permit issued — Sidewalk Shed
M00625166-I1-SH
11/08/2021
Filed — Alteration
M00625166-I1
09/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/04/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/01/2018
Violation issued (ECB, open)
Local Law
08/31/2017
Cycle 8 facade report submitted
08/31/2017
Violation issued (ECB, open)
Construction
08/31/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/16/2017
Cycle 8 facade report signed — UNSAFE
07/10/2017
Cycle 8 facade inspection completed
06/20/2017
Violation issued (ECB, closed)
Unknown
06/20/2017
Violation issued (ECB, closed)
Unknown
Latest 60 of 118 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offALLSTATE SPRINKLER LLC03/18/2025
DOB NOWStructuralSigned-offMED RAY CORP03/05/2025
DOB NOWMechanical SystemsSigned-offMED RAY CORP03/04/2025
DOB NOWGeneral ConstructionSigned-offMED RAY CORP03/04/2025
DOB NOWSidewalk ShedSigned-offCARLITOS CONTRACTING CORP04/03/2024
DOB NOWSidewalk ShedSigned-offCARLITOS CONTRACTING CORP03/27/2023
DOB NOWSidewalk ShedSigned-offCARLITOS CONTRACTING CORP09/24/2022
DOB NOWSidewalk ShedSigned-offRENNON CONSTRUCTION CORP11/09/2021
BISEQISSUEDRENNON CONSTRUCTION CORP09/23/2016
BISEQISSUEDNAVTECH CONSTRUCTION CORP09/16/2015
BISEQISSUEDNAVTECH CONSTRUCTION CORP09/04/2015
BISEQISSUEDNAVTECH CONSTRUCTION CORP09/17/2014
BISEQISSUEDNAVTECH CONSTRUCTION CORP03/25/2014
BISEQISSUEDLHOTSE CORP08/20/2013
BISEQISSUEDLHOTSE CORP08/20/2013
BISEQISSUEDNAVTECH CONSTRUCTION CORP05/06/2013
BISEQISSUEDNAVTECH CONSTRUCTION CORP05/15/2012
BISEQISSUEDNAVTECH CONSTRUCTION CORP03/22/2011
BISEQISSUEDNAVTECH CONSTRUCTION CORP03/26/2010
BISEQISSUEDNAVTECH CONSTRUCTION CORP05/21/2009
BISOTISSUEDL-C CONSTRUCTION CONSULTING08/16/2007
BISEQISSUEDCSC OF NEW YORK INC12/15/2006
BISOTISSUEDL-C CONSTRUCTION CONSULTING08/11/2006
BISEQISSUEDCSC OF NEW YORK INC12/20/2005
BISEQISSUEDCSC OF NEW YORK INC01/12/2005
BISEQISSUEDCSC OF NY INC.01/11/2005
BISEQISSUEDCSC OF NEW YORK INC08/05/2004
BISSPISSUEDCAPITOL FIRE SPKL CO,INC08/03/2004
BISOTISSUEDVAN TAG CONSTRUCTION COMPANY12/12/2003
BISEQISSUEDLILLY CONSTRUCTION CORP08/23/2002
BISEQISSUEDLILLY CONSTRUCTION CO.,INC.08/24/2001
BISPLISSUEDTUFARO PLUMBING & HEATING01/27/2000
BISOTISSUEDMA ANGELIADES INC11/19/1999
BISOTISSUEDMA ANGELIADES INC11/19/1999
BISOTISSUEDTHREE GENERATIONS CONTRACTING08/18/1999
BISMHISSUEDGRAND MECH. CORP.06/25/1999
BISPLISSUEDCARDOZA WINER CORP06/17/1999
BISOTISSUEDSAME AS ABOVE06/15/1999
BISSPISSUEDSIRINA FIRE PROTECTION CORP06/04/1999
BISMHISSUEDBAY WELDING INC06/02/1999
+ 15 more permits on file
1 project · most recent 07/28/2025
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/28/2025Signed-offMED RAY CORPAir Conditioning Systems
Cooling
Sea Breeze HMZ36H424ZMO 36,000 BTU · Condensing Unit ×1
1 project · most recent 07/28/2025
FiledStatusContractorScope
07/28/2025Signed-offALLSTATE SPRINKLER LLC5 heads
5 projects · most recent 10/08/2025
General Wiring
FiledStatusContractorScope
10/08/2025Permit IssuedTHREETECH ELECTRIC, INC—
06/13/2025Permit IssuedINTERSTATE ELECTRIC, LLCGeneral Wiring
10/24/2023Permit IssuedOMD ELECTRICAL CORP1 meters, 1 new_meters
06/26/2023Permit IssuedP & M ELECT'L CONTR. CORPGeneral Wiring
09/29/2022CompleteRICHARD NEU—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
11/10/2025Pass-Final SP - Up to 9 Requested FloorsPassView ↗
10/29/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
07/29/2025HVAC-R and service water heating equipmentRyan Hansenenergy_progress
07/29/2025FinalRyan Hansenprogress
07/29/2025Mechanical SystemsRyan Hansenspecial
07/29/2025Fire-Resistant Penetrations and JointsRyan Hansenspecial
07/29/2025Maintenance informationRyan Hansenenergy_progress
07/29/2025HVAC-R and service water heating system controlsRyan Hansenenergy_progress
07/29/2025HVAC-R and service water piping design and insulationRyan Hansenenergy_progress
06/18/2025Fire-Resistant Penetrations and JointsRyan Hansenspecial
06/18/2025Mechanical SystemsRyan Hansenspecial
06/18/2025FinalRyan Hansenprogress
06/18/2025HVAC-R and service water piping design and insulationRyan Hansenenergy_progress
06/18/2025HVAC-R and service water heating equipmentRyan Hansenenergy_progress
06/18/2025Maintenance informationRyan Hansenenergy_progress
06/18/2025HVAC-R and service water heating system controlsRyan Hansenenergy_progress
02/14/2025Structural Steel - WeldingRyan Hansenspecial
02/14/2025Structural Stability – Alterations of existing buildingsRyan Hansenspecial
02/14/2025Post-installed AnchorsRyan Hansenspecial
02/14/2025Concrete - Cast-In-PlaceRyan Hansenspecial
02/14/2025Structural Steel - High Strength BoltingRyan Hansenspecial
02/14/2025Structural Steel - DetailsRyan Hansenspecial
02/13/2025FinalRyan Hansenprogress
02/12/2025Fire-Resistant Penetrations and JointsRyan Hansenspecial
02/10/2025Sprinkler SystemsRyan Hansenspecial
▾Documents — 92 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
09/03/2026M00625166-I1Request digital key ↗
08/28/2026M00767916-I1Request digital key ↗
08/28/2026M00767916-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits17
▸BISWORK PERMIT APPLICATION11
09/27/2016122461219Open ↗
09/29/2015121959988Open ↗
09/22/2015122461219Open ↗
Showing 3 of 11 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION6
09/17/2015122461219Open ↗
04/01/2014121959988Open ↗
08/16/2013140106418Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications32
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/28/2026M00767916-I1Open ↗
08/24/2026M01174010-P1Open ↗
08/24/2026M01174010-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/29/2026M01174010-S3Open ↗
08/24/2026M01174010-P1Open ↗
08/24/2026M01174010-P1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
09/17/2015122461219Open ↗
04/01/2014121959988Open ↗
08/16/2013140106418Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
09/17/2015122461219Open ↗
04/01/2014121959988Open ↗
05/16/2012121053778Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/29/2026M01174010-S3Open ↗
08/24/2026M01174010-P1Open ↗
08/23/2026M01174010-S2Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
05/16/2012121053778Open ↗
05/21/2009120044683Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
08/16/2013140106418Open ↗
08/16/2013140106463Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
08/16/2013140106418Open ↗
08/16/2013140106463Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
09/17/2015122461219Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/24/2026M01174010-P1Open ↗
08/24/2026M01174010-S1Open ↗
08/24/2026M01174010-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
08/16/2013140106418Open ↗
08/16/2013140106463Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
05/21/2009120044683Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
08/16/2013140106418Open ↗
08/16/2013140106463Open ↗
▸Approvals, Objections & Sign-offs14
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
08/28/2026M00767916-I1Open ↗
08/24/2026M01174010-P1Open ↗
08/24/2026M01174010-S2Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
09/26/2014121959988Open ↗
05/10/2013121053778Open ↗
03/24/2011120044683Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
05/16/2012121053778Open ↗
05/21/2009120044683Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/13/2026M00625166-I1Open ↗
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET4
09/17/2015122461219Open ↗
04/01/2014121959988Open ↗
05/16/2012121053778Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
08/16/2013140106418Open ↗
08/16/2013140106463Open ↗
▸Other Documents5
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION4
08/16/2013140106418Open ↗
08/16/2013140106418Open ↗
08/16/2013140106463Open ↗
Showing 3 of 4 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
05/08/2010120044683Open ↗