← Back
BuildNYC
Two family brick
517 BRADFORD STREET
BROOKLYN · BIN 3084777
💬 Discuss this project
1910Year Built
2Stories
B1Building Class
R6Zoning
2,328 sfGross Floor Area
2Units
Rent Stabilized2 Active Violations ▸FDNY Report ↗
Two family brick · Owner of record: 517 Bradford · 2,833 sf lot · 0.82 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof40p · 1 filing · 20 docs
Floor 239p · 1 filing · 20 docs
Floor 138p · 1 filing · 20 docs
Basement37p · 1 filing · 20 docs
Site & exterior3p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
517 Bradford103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/08/2025$715K—Private party → 517 BRADFORD LLC$307/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AG Engineering702/18/2026
Vasilios Artemiou PE104/09/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Xpdite Group LLC (104)803/21/2026
Xpdite Group LLC 104203/21/2026
Xpdite Group LLC 105203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Revamp NYCGeneral Contractor404/09/2026
AG Power ElectricElectrical103/22/2026
Revamp NYCScaffold104/09/2026
AmokFire Protection107/08/2026
AmokPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Shahrish Shuvo Engineering8524702/18/2026
Building Lifecycle
09/04/2026
Signed off — Alteration CO
MECHANICAL APPLICATION FILED HEREWITH IN CONJUNCTION TO ALT-CO APPLICATION B01203132-I1
B01203132-I1
06/12/2026
Work does not conform to approved drawings: at the time of inspection, observed at basement level 3 legal class a apartments with residential…
ECB violation · closed
03/03/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Shahrish Shuvo
03/03/2026
Special inspection requirement — Interior lighting power
Shahrish Shuvo
03/03/2026
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
73 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offRevamp NYC12/15/2025
DOB NOWMechanical SystemsSigned-offRevamp NYC10/01/2025
DOB NOWSprinklersSigned-offAmok09/26/2025
DOB NOWPlumbingSigned-offAmok09/26/2025
DOB NOWGeneral ConstructionPermit IssuedRevamp NYC09/16/2025
1 project · most recent 02/18/2026
Heating and Air Conditioning Systems
FiledStatusContractorScope
02/18/2026Signed-offRevamp NYCHeating and Air Conditioning Systems
1 project · most recent 02/18/2026
Sprinkler System
FiledStatusContractorScope
02/18/2026Signed-offAmokSprinkler System
1 project · most recent 02/18/2026
Water/Sanitary
FiledStatusContractorScope
02/18/2026Signed-offAmokWater/Sanitary
2 projects · most recent 04/28/2026
General Wiring
FiledStatusContractorScope
04/28/2026CompleteAG Power ElectricGeneral Wiring
01/26/2026CompleteAG Power Electric—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
12/11/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/08/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/05/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/03/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/05/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/03/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 63
DateRequirementInspectorRole
03/03/2026Structural Stability – Alterations of existing buildingsShahrish Shuvospecial
03/03/2026Fenestration air leakageShahrish Shuvoenergy_progress
03/03/2026Permanent certificateShahrish Shuvoenergy_progress
03/03/2026Air barrier - visual inspectionShahrish Shuvoenergy_progress
03/03/2026Fenestration areasShahrish Shuvoenergy_progress
03/03/2026MeteringShahrish Shuvoenergy_progress
03/03/2026Interior lighting powerShahrish Shuvoenergy_progress
03/03/2026Fire-Resistant Penetrations and JointsShahrish Shuvospecial
03/03/2026Fenestration and door U-factor and product ratingsShahrish Shuvoenergy_progress
03/03/2026Fire-Resistance Rated ConstructionShahrish Shuvoprogress
03/03/2026Energy Code Compliance InspectionsShahrish Shuvoprogress
03/03/2026Maintenance informationShahrish Shuvoenergy_progress
02/02/2026Fenestration air leakageShahrish Shuvoenergy_progress
02/02/2026Fenestration areasShahrish Shuvoenergy_progress
02/02/2026Permanent certificateShahrish Shuvoenergy_progress
02/02/2026Fenestration and door U-factor and product ratingsShahrish Shuvoenergy_progress
02/02/2026MeteringShahrish Shuvoenergy_progress
02/02/2026Maintenance informationShahrish Shuvoenergy_progress
02/02/2026Interior lighting powerShahrish Shuvoenergy_progress
02/02/2026Air barrier - visual inspectionShahrish Shuvoenergy_progress
02/02/2026Fire-Resistance Rated ConstructionShahrish Shuvoprogress
02/02/2026Energy Code Compliance InspectionsShahrish Shuvoprogress
02/02/2026Structural Stability – Alterations of existing buildingsShahrish Shuvospecial
02/02/2026Fire-Resistant Penetrations and JointsShahrish Shuvospecial
12/31/2025Air barrier - visual inspectionShahrish Shuvoenergy_progress
Latest 25 of 63.
46 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account