← Back
All parking garages
517 EAST 73 STREET
💬 Discuss this project
1920Year Built
1Stories
G1Building Class
M1-4Zoning
7,663 sfGross Floor Area
1Units
All parking garages · 7,663 sf lot · 1 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Roof38p · 3 filings · 20 docs
Floor 28p · 1 filing · 19 docs
Floor 153p · 4 filings · 20 docs
Site & exterior3p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HOSPITAL FOR SPECIAL SURGERY2107/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AMA CONSULTING ENGINEERS, PC807/30/2024
FROM ARCHITECTURE DPC311/18/2022
CUONO ENGINEERING PLLC303/04/2022
AME SERVICES INC107/14/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL EXPEDITING2803/21/2026
AME SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
UGL CORPGeneral Contractor607/08/2026
J. CAIAZZO PLBG & HTG CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FUTURE TECH CONSULTANTS O5891407/30/2024
Building Lifecycle
All (65)Filed (14)Permit Issued (5)Signed Off (5)Inspection (3)Objection (8)Special Inspection (30)
02/26/2025
Signed off — Alteration
Installnew ductwork, piping and a rooftop unit to accommodate the storage warehouse as per plans filedherewith. No change to zoning , use, egess, occupancy.
M00541851-I1
02/26/2025
Signed off — Alteration
Install new piping for domestic water system, new fixtures; new gas lines for roof top mechanical unit.
M00541865-I1
02/26/2025
Signed off — Alteration
Alterations to the existing garage including new partitions and finishes on 1st floor; patch and repair roof and stucco facade. All work as per plans. No change to zoning, use, egress, occupancy.
M00537645-I1
02/26/2025
Signed off — Alteration
Structural work to accommodate renovations to the garage including new footings and SMU pier for a new door, and new framing for removal of skylights and mechanical equipment. No change to zoning, egress, occupancy.
M00537592-I1
08/02/2024
Special inspection requirement — Post-installed Anchors
Stephen Marchese
08/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Marchese
07/30/2024
Filed — Alteration
Install new piping for domestic water system, new fixtures; new gas lines for roof top mechanical unit.
M00541865-P4
07/11/2024
Special inspection requirement — Post-installed Anchors
Stephen Marchese
07/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Marchese
12/14/2023
Special inspection requirement — Final
Stephen Marchese
12/14/2023
Special inspection requirement — Mechanical Systems
Stephen Marchese
12/01/2023
Objection resolved — Addressed
08/29/2023
Signed off — Alteration
Filing for installation of sidewalk shed on behalf of contractor
M00555874-I1
03/08/2023
Objection raised — Accessibility
03/03/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Stephen Marchese
03/03/2023
Special inspection requirement — Structural Steel - Details
Stephen Marchese
03/03/2023
Special inspection requirement — Structural Steel - Welding
Stephen Marchese
03/03/2023
Special inspection requirement — Structural Steel - High Strength Bolting
Stephen Marchese
03/03/2023
Special inspection requirement — Subgrade Inspections
Stephen Marchese
03/03/2023
Special inspection requirement — Final
Young Suh
03/03/2023
Special inspection requirement — Footing and Foundation
Stephen Marchese
03/03/2023
Special inspection requirement — Concrete - Cast-In-Place
Stephen Marchese
03/03/2023
Special inspection requirement — Masonry
Stephen Marchese
02/22/2023
Filed — Alteration
Install new piping for domestic water system, new fixtures; new gas lines for roof top mechanical unit.
M00541865-P3
02/22/2023
Filed — Alteration
Installnew ductwork, piping and a rooftop unit to accommodate the storage warehouse as per plans filedherewith. No change to zoning , use, egess, occupancy.
M00541851-P2
02/03/2023
Special inspection requirement — Post-installed Anchors
Stephen Marchese
02/03/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Marchese
02/03/2023
Special inspection requirement — Mechanical Systems
Stephen Marchese
02/03/2023
Special inspection requirement — Final
Stephen Marchese
01/25/2023
Special inspection requirement — Sprayed fire-resistant materials
Stephen Marchese
01/25/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Marchese
01/25/2023
Special inspection requirement — Energy Code Compliance Inspections
Stephen Marchese
01/25/2023
Special inspection requirement — Fire-Resistance Rated Construction
Stephen Marchese
01/25/2023
Special inspection requirement — Final
matteo fraticelli
01/25/2023
Special inspection requirement — Exterior lighting power
Stephen Marchese
01/25/2023
Special inspection requirement — Interior lighting power
Stephen Marchese
01/25/2023
Special inspection requirement — Lighting controls
Stephen Marchese
12/27/2022
Objection resolved — Addressed
11/30/2022
Objection raised — Other
11/18/2022
Filed — Alteration
Alterations to the existing garage including new partitions and finishes on 1st floor; patch and repair roof and stucco facade. All work as per plans. No change to zoning, use, egress, occupancy.
M00537645-P2
11/10/2022
Special inspection requirement — Interior lighting power
Stephen Marchese
11/10/2022
Special inspection requirement — Sprayed fire-resistant materials
Stephen Marchese
11/10/2022
Special inspection requirement — Energy Code Compliance Inspections
Stephen Marchese
08/03/2022
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
07/29/2022
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
06/18/2022
Permit issued — General Construction
M00537645-I1-GC
06/08/2022
Filed — Alteration
Install new piping for domestic water system, new fixtures; new gas lines for roof top mechanical unit.
M00541865-P2
03/21/2022
Filed — Alteration
Install new piping for domestic water system, new fixtures; new gas lines for roof top mechanical unit.
M00541865-P1
03/21/2022
Filed — Alteration
Installnew ductwork, piping and a rooftop unit to accommodate the storage warehouse as per plans filedherewith. No change to zoning , use, egess, occupancy.
M00541851-P1
03/08/2022
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
03/04/2022
Filed — Alteration
Structural work to accommodate renovations to the garage including new footings and SMU pier for a new door, and new framing for removal of skylights and mechanical equipment. No change to zoning, egress, occupancy.
M00537592-P1
10/06/2021
Filed — Alteration
Alterations to the existing garage including new partitions and finishes on 1st floor; patch and repair roof and stucco facade. All work as per plans. No change to zoning, use, egress, occupancy.
M00537645-P1
09/15/2021
Permit issued — Mechanical Systems
M00541851-I1-MS
09/14/2021
Permit issued — General Construction
M00537592-I1-GC-CX
09/02/2021
Permit issued — Plumbing
M00541865-I1-PL
08/03/2021
Permit issued — General Construction
M00537645-I1-GC
07/26/2021
Objection raised — Mechanical
07/26/2021
Objection resolved — Addressed
07/22/2021
Objection raised — 2014-AN AC 28-104.7.1-Administ
07/22/2021
Objection resolved — Addressed
Latest 60 of 65 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offUGL CORP06/18/2022
DOB NOWMechanical SystemsSigned-offUGL CORP09/15/2021
DOB NOWGeneral ConstructionSigned-offUGL CORP09/14/2021
DOB NOWPlumbingSigned-offJ. CAIAZZO PLBG & HTG COR09/02/2021
DOB NOWGeneral ConstructionSigned-offUGL CORP08/03/2021
2 projects · most recent 07/22/2021
General Wiring
FiledStatusContractorScope
07/22/2021CompleteT.M.T ELECTRIC INC—
06/17/2021CompleteT.M.T ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
08/03/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
07/29/2022No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
03/08/2022Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 57
DateRequirementInspectorRole
08/02/2024Post-installed AnchorsStephen Marchesespecial
08/02/2024Fire-Resistant Penetrations and JointsStephen Marchesespecial
07/11/2024Post-installed AnchorsStephen Marchesespecial
07/11/2024Fire-Resistant Penetrations and JointsStephen Marchesespecial
12/14/2023FinalStephen Marcheseprogress
12/14/2023Mechanical SystemsStephen Marchesespecial
03/03/2023Structural Stability – Alterations of existing buildingsStephen Marchesespecial
03/03/2023Structural Steel - DetailsStephen Marchesespecial
03/03/2023Structural Steel - WeldingStephen Marchesespecial
03/03/2023Structural Steel - High Strength BoltingStephen Marchesespecial
03/03/2023Subgrade InspectionsStephen Marchesespecial
03/03/2023FinalYoung Suhprogress
03/03/2023Footing and FoundationStephen Marcheseprogress
03/03/2023Concrete - Cast-In-PlaceStephen Marchesespecial
03/03/2023MasonryStephen Marchesespecial
02/03/2023Post-installed AnchorsStephen Marchesespecial
02/03/2023Fire-Resistant Penetrations and JointsStephen Marchesespecial
02/03/2023Mechanical SystemsStephen Marchesespecial
02/03/2023FinalStephen Marcheseprogress
01/25/2023Sprayed fire-resistant materialsStephen Marchesespecial
01/25/2023Fire-Resistant Penetrations and JointsStephen Marchesespecial
01/25/2023Energy Code Compliance InspectionsStephen Marcheseprogress
01/25/2023Fire-Resistance Rated ConstructionStephen Marcheseprogress
01/25/2023Finalmatteo fraticelliprogress
01/25/2023Exterior lighting powerStephen Marcheseenergy_progress
Latest 25 of 57.
▾Documents — 74 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
09/03/2026M00537645-P1Request digital key ↗
09/03/2026M00537645-I1Request digital key ↗
09/03/2026M00541851-P1Request digital key ↗
Showing 3 of 15 on file for this type
▸Seals & Professional Certifications43
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/03/2026M00537645-I1Open ↗
09/03/2026M00537645-P1Open ↗
09/03/2026M00537645-P2Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/01/2026M00541851-P2Open ↗
09/01/2026M00537592-P1Open ↗
09/01/2026M00537592-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/06/2026M00541865-I1Open ↗
09/02/2026M00541865-P2Open ↗
09/01/2026M00541851-P2Open ↗
Showing 3 of 14 on file for this type
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
09/03/2026M00537645-I1Open ↗
09/03/2026M00537645-P1Open ↗
09/03/2026M00541851-P1Open ↗
Showing 3 of 14 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
09/03/2026M00537645-I1Open ↗
08/14/2026M00541851-I1Open ↗