517 WEST 157TH STREET
MANHATTAN · BIN 1062739
💬 Discuss this project
1900Year Built
3Stories
C3Building Class
R7-2Zoning
—Gross Floor Area
4Units
1 Active Violation ▸
Four families · 2.52 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofBulger / Luacaw1 filing · 10 docs
Floor 3Bulger / Luacaw1 filing · 10 docs
Floor 2Bulger / Luacaw1 filing · 10 docs
Floor 1Bulger / Luacaw1 filing · 10 docs
CellarBulger / Luacaw1 filing · 10 docs
Sub-BasementBulger / Luacaw1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC Department of Housing Preservation and Development503/21/2026
Luacaw Brownstones403/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Emtg Consultants309/10/2026
Urban Quotient107/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
City-Wide Testing416209/10/2026
Building Lifecycle
All (71)Filed (4)Violation (49)Special Inspection (18)
09/10/2026
Filed — Alteration
PLUMBING WORK AS PER PLANS. EXISTING UTILITY SERVICES (GAS, WATER,AND SEWER) SHALL REMAIN. EXISTING SANITARY, STORM, DOMESTIC WATER, VENT, AND NATURAL, AND GAS PIPING RISERS SHALL REMAIN. REPLACEMENT OF EXISTING PLUMBING FIXTURES AND SANITARY ROUGH IN.
M01419276-S3
09/08/2026
Filed — Alteration
PLUMBING WORK AS PER PLANS. EXISTING UTILITY SERVICES (GAS, WATER,AND SEWER) SHALL REMAIN. EXISTING SANITARY, STORM, DOMESTIC WATER, VENT, AND NATURAL, AND GAS PIPING RISERS SHALL REMAIN. REPLACEMENT OF EXISTING PLUMBING FIXTURES AND SANITARY ROUGH IN.
M01419276-S2
08/28/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
ELIAS RASABI
08/28/2026
Special inspection requirement — HVAC-R and service water heating system controls
ELIAS RASABI
08/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELIAS RASABI
08/28/2026
Special inspection requirement — Post-installed Anchors
ELIAS RASABI
08/28/2026
Special inspection requirement — Tenant Protection Plan Compliance
ELIAS RASABI
08/28/2026
Special inspection requirement — Energy Code Compliance Inspections
ELIAS RASABI
08/28/2026
Special inspection requirement — HVAC-R and service water heating equipment
ELIAS RASABI
08/13/2026
Filed — Alteration
PLUMBING WORK AS PER PLANS. EXISTING UTILITY SERVICES (GAS, WATER,AND SEWER) SHALL REMAIN. EXISTING SANITARY, STORM, DOMESTIC WATER, VENT, AND NATURAL, AND GAS PIPING RISERS SHALL REMAIN. REPLACEMENT OF EXISTING PLUMBING FIXTURES AND SANITARY ROUGH IN.
M01419276-S1
08/05/2026
Special inspection requirement — Heating Systems
08/05/2026
Special inspection requirement — HVAC-R and service water heating equipment
08/05/2026
Special inspection requirement — Shutoff dampers
08/05/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/05/2026
Special inspection requirement — Energy Code Compliance Inspections
08/05/2026
Special inspection requirement — Maintenance information
08/05/2026
Special inspection requirement — HVAC-R and service water heating system controls
08/05/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
08/05/2026
Special inspection requirement — Permanent certificate
07/28/2026
Filed — Alteration
PLUMBING WORK AS PER PLANS. EXISTING UTILITY SERVICES (GAS, WATER,AND SEWER) SHALL REMAIN. EXISTING SANITARY, STORM, DOMESTIC WATER, VENT, AND NATURAL, AND GAS PIPING RISERS SHALL REMAIN. REPLACEMENT OF EXISTING PLUMBING FIXTURES AND SANITARY ROUGH IN.
M01419276-I1
07/21/2026
Special inspection requirement — Final
07/21/2026
Special inspection requirement — Mechanical Systems
05/08/2025
Violation issued (HPD, closed)
C
11/18/2024
Violation issued (HPD, closed)
C
11/18/2024
Violation issued (HPD, closed)
C
11/18/2024
Violation issued (HPD, closed)
C
11/18/2024
Violation issued (HPD, closed)
C
08/02/2024
Violation issued (HPD, closed)
B
08/02/2024
Violation issued (HPD, closed)
B
08/02/2024
Violation issued (HPD, closed)
B
08/02/2024
Violation issued (HPD, closed)
B
08/02/2024
Violation issued (HPD, closed)
B
08/02/2024
Violation issued (HPD, closed)
B
08/02/2024
Violation issued (HPD, closed)
B
08/02/2024
Violation issued (HPD, closed)
B
08/02/2024
Violation issued (HPD, closed)
B
08/02/2024
Violation issued (HPD, closed)
B
08/02/2024
Violation issued (HPD, closed)
B
02/14/2023
Violation issued (HPD, closed)
A
02/14/2023
Violation issued (HPD, closed)
B
02/14/2023
Violation issued (HPD, closed)
B
01/31/2023
Violation issued (HPD, closed)
B
01/31/2023
Violation issued (HPD, closed)
B
01/31/2023
Violation issued (HPD, closed)
C
07/03/2022
Violation issued (HPD, closed)
C
07/03/2022
Violation issued (HPD, closed)
B
02/16/2022
Violation issued (HPD, closed)
A
11/03/2021
Violation issued (HPD, open)
B
11/03/2021
Violation issued (HPD, closed)
A
11/03/2021
Violation issued (HPD, closed)
B
11/03/2021
Violation issued (HPD, closed)
B
07/13/2021
Violation issued (HPD, closed)
A
07/13/2021
Violation issued (HPD, closed)
B
07/13/2021
Violation issued (HPD, closed)
B
07/13/2021
Violation issued (HPD, closed)
B
07/13/2021
Violation issued (HPD, closed)
B
04/02/2021
Violation issued (HPD, closed)
A
10/02/2015
Violation issued (HPD, closed)
A
03/29/2009
Violation issued (HPD, closed)
B
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 71 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISPLISSUEDS & L Plumbing02/13/2008
BISEQISSUEDSigma Contracting12/29/2006
BISPLISSUEDS & L Plumbing09/15/2006
BISEQISSUEDSigma Contracting06/23/2006
BIS—ISSUEDSigma Contracting06/01/2006
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
08/28/2026HVAC-R and service water piping design and insulationELIAS RASABIenergy_progress
08/28/2026HVAC-R and service water heating system controlsELIAS RASABIenergy_progress
08/28/2026Fire-Resistant Penetrations and JointsELIAS RASABIspecial
08/28/2026Post-installed AnchorsELIAS RASABIspecial
08/28/2026Tenant Protection Plan ComplianceELIAS RASABIspecial
08/28/2026Energy Code Compliance InspectionsELIAS RASABIprogress
08/28/2026HVAC-R and service water heating equipmentELIAS RASABIenergy_progress
08/05/2026Heating Systems—special
08/05/2026HVAC-R and service water heating equipment—energy_progress
08/05/2026Shutoff dampers—energy_progress
08/05/2026Tenant Protection Plan Compliance—special
08/05/2026Energy Code Compliance Inspections—progress
08/05/2026Maintenance information—energy_progress
08/05/2026HVAC-R and service water heating system controls—energy_progress
08/05/2026HVAC-R and service water piping design and insulation—energy_progress
08/05/2026Permanent certificate—energy_progress
07/21/2026Final—progress
07/21/2026Mechanical Systems—special
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/16/2026M01419276-S1Request digital key ↗
08/16/2026M01419276-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature4
10/03/2026M01419276-S2Open ↗
10/03/2026M01419276-S3Open ↗
08/16/2026M01419276-S1Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs4
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
10/03/2026M01419276-S2Open ↗
10/03/2026M01419276-S3Open ↗
08/16/2026M01419276-S1Open ↗
Showing 3 of 4 on file for this type