← Back
BuildNYC
Miscellaneous indoor public assembly
518 50TH STREET
BROOKLYN · BIN 3013308
💬 Discuss this project
1931Year Built
1Stories
P9Building Class
R6BZoning
3,650 sfGross Floor Area
0Units
0 Active ViolationsFDNY Report ↗
Miscellaneous indoor public assembly · 5,008 sf lot · 0.73 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1The Salvation Army6p · 3 filings · 14 docs
Site & exteriorRepair damaged brick wall and parapet1p · 2 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
The Salvation Army1210/13/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Baalbaki & Associates Engineering208/05/2026
Rampulla Associates Architects103/17/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rampulla Associates Architects103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Adam B. ConttractingGeneral Contractor209/01/2026
Power Surge ElectricElectrical103/22/2026
Demar PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Baalbaki & Associates Engineering1858208/05/2026
Building Lifecycle
All (22)Filed (3)Permit Issued (3)Signed Off (3)Violation (7)Special Inspection (6)
09/16/2026
Signed off — Alteration
REPAIR DAMAGED BRICK WALL AND PARAPET
B01439773-I1
08/31/2026
Permit issued — General Construction
B01439773-I1-GC-CX
08/07/2026
Signed off — Alteration
TEMPORARY SHORING COMPLETED UNDER EMERGENCY ORDER SUPERVISED BY FEU
B01439703-I1
08/06/2026
Permit issued — General Construction
B01439703-I1-GC
08/05/2026
Filed — Alteration
REPAIR DAMAGED BRICK WALL AND PARAPET
B01439773-I1
08/05/2026
Filed — Alteration
TEMPORARY SHORING COMPLETED UNDER EMERGENCY ORDER SUPERVISED BY FEU
B01439703-I1
08/02/2026
Special inspection requirement — Masonry
08/02/2026
Special inspection requirement — Structural Steel - Details
08/02/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
08/02/2026
Special inspection requirement — Final
08/01/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mohammad Baalbaki
08/01/2026
Special inspection requirement — Final
Mohammad Baalbaki
07/16/2026
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/16/2026
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/16/2026
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/18/2021
Signed off — Alteration
B00326370-I1
07/10/2020
Permit issued — Plumbing
B00326370-I1-PL
03/17/2020
Filed — Alteration
B00326370-I1
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/06/2006
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
01/31/2005
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
02/13/2004
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offAdam B. Conttracting08/31/2026
DOB NOWGeneral ConstructionSigned-offAdam B. Conttracting08/06/2026
DOB NOWPlumbingSigned-offDemar Plumbing07/10/2020
BISOTISSUEDEuda Construction07/16/2020
BISOTISSUEDEuda Construction08/09/2019
BISPLISSUEDEmpire Plumbing05/23/2013
BISOTISSUEDBuilding Concepts01/30/2013
BISMHISSUEDMaster Fire Prevent Systems I08/21/2012
2 projects · most recent 08/21/2020
General Wiring Lighting
FiledStatusContractorScope
08/21/2020CompletePower Surge ElectricGeneral Wiring
08/28/2018Permit IssuedApollo ElectricLighting
1 project · most recent 08/05/2026
Steel Masonry
FiledStatusContractorScope
08/05/2026Signed-offAdam B. ConttractingSteel, Masonry
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
08/02/2026Masonry—special
08/02/2026Structural Steel - Details—special
08/02/2026Structural Stability – Alterations of existing buildings—special
08/02/2026Final—progress
08/01/2026Structural Stability – Alterations of existing buildingsMohammad Baalbakispecial
08/01/2026FinalMohammad Baalbakiprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
The Salvation ArmyCommunity FacilityFloor 1
Project B00326370 Alteration · LOC Issued · 03/17/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 75 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch2
08/16/2026B01439703-I1Request digital key ↗
08/16/2026B01439773-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/02/2026B00326370-I1Request digital key ↗
▸Applications & Permits16
▸BISWORK PERMIT APPLICATION7
08/16/2019321719253Open ↗
08/12/2019321719253Open ↗
08/12/2019321719253Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION7
02/27/2020321719253Open ↗
04/02/2018321719253Open ↗
04/02/2018321719253Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
02/03/2020321719253Open ↗
04/19/2019321719253Open ↗
▸Seals & Professional Certifications17
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
05/06/2019321719253Open ↗
03/19/2018321719253Open ↗
11/16/2013320608641Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/16/2026B01439773-I1Open ↗
08/16/2026B01439703-I1Open ↗
08/13/2026B00326370-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
04/02/2018321719253Open ↗
03/19/2018321719253Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
03/19/2018321719253Open ↗
08/28/2012320608641Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
08/28/2012320608641Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/02/2026B01439703-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/02/2026B01439703-I1Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING3
10/05/2012320291028Open ↗
06/22/2012320291028Open ↗
04/05/2011320291028Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
03/19/2018321719253Open ↗
▸BISSIGN OFF OF PLUMBING DOB NOW APPLICATIONFOR INSTALLATION OF NEW SPRINKLER HEADS1
06/21/2021321719253Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/16/2026B01439773-I1Open ↗
08/16/2026B01439703-I1Open ↗
08/13/2026B00326370-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
04/05/2011320291028Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
08/28/2012320608641Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/19/2018321719253Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
06/21/2021321719253Open ↗
06/21/2021321719253Open ↗
06/21/2021321719253Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
05/06/2019321719253Open ↗
03/19/2018321719253Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/21/2021321719253Open ↗
▸Approvals, Objections & Sign-offs7
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
08/16/2026B01439773-I1Open ↗
08/16/2026B01439703-I1Open ↗
08/13/2026B00326370-I1Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
06/23/2021321719253Open ↗
11/16/2013320608641Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
08/17/2012320608641Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
11/16/2013320608641Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
06/23/2021321719253Open ↗
04/02/2018321719253Open ↗
03/19/2018321719253Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms9
▸BISADDITIONAL INFORMATION5
02/27/2020321719253Open ↗
05/06/2019321719253Open ↗
12/08/2014320291028Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET3
04/02/2018321719253Open ↗
03/16/2018321719253Open ↗
04/05/2011320291028Open ↗
▸BISeFiling Job Application Cover Sheet1
08/28/2012320608641Open ↗