Three families
519 2ND STREET
BROOKLYN · Park Slope · BIN 3025223
💬 Discuss this project
1898Year Built
3Stories
C0Building Class
R6BZoning
3,600 sfGross Floor Area
3Units
Rent Stabilized2 Active Violations 1 unresolved · 1 paperwork only ▸FDNY Report ↗
Three families · Owner of record: Finesource · 2,000 sf lot · 1.8 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofFront patio ADA access and paver replacementUnder Construction3p · 1 filing · 17 docs
BulkheadFront patio ADA access and paver replacementUnder Construction2p · 2 filings · 17 docs
Floor 3Plumbing fixtures and piping installationsUnder Construction17p · 3 filings · 20 docs
Floor 2Plumbing fixtures and piping installationsUnder Construction18p · 3 filings · 20 docs
Floor 1Plumbing fixtures and piping installationsUnder Construction18p · 3 filings · 20 docs
CellarPlumbing fixtures and piping installationsUnder Construction18p · 4 filings · 20 docs
BasementFront patio ADA access and paver replacementUnder Construction13p · 1 filing · 17 docs
Sub-BasementPlumbing fixtures and piping installations4p · 2 filings · 9 docs
Filed — no permit issuedErect construction fence1p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Chartered Properties2410/04/2026
Finesource103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
James Design Consultant310/01/2026
TSL Architect207/27/2022
HCN Design106/08/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MJB Consultants803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Standard EnvironmentalGeneral Contractor707/29/2026
Winson ConstructionGeneral Contractor203/21/2026
Crown PlumbingPlumbing107/08/2026
New York Standard Mechanical CoFire Protection107/08/2026
Rigid Plumbing ContPlumbing108/07/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IP Concrete Testing and I6252208/18/2022
AA Building & Inspection1519110/24/2021
Building Lifecycle
All (59)Filed (6)Permit Issued (8)Violation (17)Inspection (1)Objection (1)Special Inspection (26)
10/01/2026
Filed — Alteration
INSTALL PLUMBING FIXTURES AND ASSOCIATED PIPINGS AS PER PLANS IN CELLAR,BASEMENT,1St,2nd &3rd FLOORS.
B00794646-S1
09/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/15/2026
Special inspection requirement — Final
09/15/2026
Special inspection requirement — Mechanical Systems
09/15/2026
Special inspection requirement — Seismic Resistance of Plumbing, Mechanical, Fuel Gas, and Electrical Components
09/15/2026
Special inspection requirement — Post-installed Anchors
09/15/2026
Special inspection requirement — Heating Systems
08/06/2026
Permit issued — Plumbing
B00794646-I1-PL
07/28/2026
Permit issued — General Construction
B00514490-I1-GC-CX
04/30/2026
Violation issued (HPD, closed)
A
01/09/2026
Permit issued — Mechanical Systems
B00514490-I1-GC-CX
12/06/2024
Violation issued (ECB, closed)
Construction
06/28/2024
Violation issued (ECB, open)
Cranes and Derricks
04/08/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/21/2023
Permit issued — General Construction
B00514490-I1-GC-CX
03/17/2023
Violation issued (HPD, closed)
A
11/09/2022
Violation issued (HPD, closed)
I
10/14/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/03/2022
Permit issued — Plumbing
B00794646-I1-PL
09/16/2022
Permit issued — Sprinklers
B00622282-I1-EW-SP
08/18/2022
Filed — Alteration
INSTALL PLUMBING FIXTURES AND ASSOCIATED PIPINGS AS PER PLANS IN CELLAR,BASEMENT,1St,2nd &3rd FLOORS.
B00794646-I1
08/17/2022
Special inspection requirement — Energy Code Compliance Inspections
INDARDEO PARBHUNATH
08/17/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
08/02/2022
Objection raised — Admin
07/29/2022
Filed — Alteration
B00622282-I1
07/27/2022
Filed — Alteration
INSTALL MECHANICAL SYSTEM AS PER PLAN
B00655223-I1
06/16/2022
Permit issued — General Construction
B00514490-I1-GC-CX
06/08/2022
Filed — Alteration
TO ERECT CONSTRUCTION FENCE AS PER PLANS
B00741941-I1
02/18/2022
Violation issued (HPD, closed)
I
02/18/2022
Violation issued (HPD, closed)
A
01/16/2022
Permit issued — Structural
B00514490-I1-GC-CX
10/24/2021
Filed — Alteration CO
B00514490-I1
10/23/2021
Special inspection requirement — Structural Steel - Details
Younes Abouyaala
10/23/2021
Special inspection requirement — Air barrier - visual inspection
TAI LAWAL
10/23/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
TAI LAWAL
10/23/2021
Special inspection requirement — Fenestration areas
TAI LAWAL
10/23/2021
Special inspection requirement — Insulation placement and R values
TAI LAWAL
10/23/2021
Special inspection requirement — Air barrier — testing
TAI LAWAL
10/23/2021
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
TAI LAWAL
10/23/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
10/23/2021
Special inspection requirement — Fenestration air leakage
TAI LAWAL
10/23/2021
Special inspection requirement — Masonry
Younes Abouyaala
10/23/2021
Special inspection requirement — Structural Steel - Welding
Younes Abouyaala
10/23/2021
Special inspection requirement — Sprayed fire-resistant materials
Younes Abouyaala
10/23/2021
Special inspection requirement — Structural Cold-Formed Steel
Younes Abouyaala
05/02/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
05/02/2021
Special inspection requirement — Final
TAI LAWAL
05/02/2021
Special inspection requirement — Structural Wood Frame
TAI LAWAL
05/02/2021
Special inspection requirement — Preliminary
TAI LAWAL
05/02/2021
Special inspection requirement — Mechanical Systems
Younes Abouyaala
04/05/2021
Violation issued (HPD, closed)
A
04/05/2021
Violation issued (HPD, closed)
I
10/28/2019
Violation issued (HPD, closed)
I
10/12/2018
Violation issued (HPD, closed)
I
11/15/2017
Violation issued (HPD, closed)
I
11/01/2016
Violation issued (HPD, closed)
I
10/06/2015
Violation issued (HPD, closed)
I
02/05/2015
Violation issued (HPD, closed)
I
12/03/1997
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedRigid Plumbing Cont08/06/2026
DOB NOWGeneral ConstructionPermit IssuedStandard Environmental07/28/2026
DOB NOWMechanical SystemsPermit IssuedStandard Environmental01/09/2026
DOB NOWGeneral ConstructionPermit IssuedStandard Environmental12/21/2023
DOB NOWPlumbingPermit IssuedCrown Plumbing10/03/2022
DOB NOWSprinklersPermit IssuedNew York Standard Mechanical Co09/16/2022
DOB NOWGeneral ConstructionPermit IssuedWinson Construction06/16/2022
DOB NOWStructuralPermit IssuedStandard Environmental01/16/2022
2 projects · most recent 10/01/2026
Heating and Air Conditioning Systems Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
10/01/2026——Heating and Air Conditioning Systems
Heat / Cool
Samsung Samsung Model # AM036FCMDCG 38,000 BTU · Heat Pump Outdoor ×3
Samsung Condensing unit AM060FCMDCG 60,000 BTU · Heat Pump Outdoor ×1
07/27/2022——Air Conditioning Systems, Heating Systems
Cooling
Heating
Noritz ×3
2 projects · most recent 07/06/2026
General Wiring
FiledStatusContractorScope
07/06/2026Permit IssuedDennison ElectricGeneral Wiring
06/29/2022Permit IssuedA Electrical Main ServiceGeneral Wiring
1 project · most recent 06/08/2022
Fence
FiledStatusContractorScope
06/08/2022——Fence
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
10/14/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
09/15/2026Fire-Resistant Penetrations and Joints—special
09/15/2026Final—progress
09/15/2026Mechanical Systems—special
09/15/2026Seismic Resistance of Plumbing, Mechanical, Fuel Gas, and Electrical Components—special
09/15/2026Post-installed Anchors—special
09/15/2026Heating Systems—special
08/17/2022Energy Code Compliance InspectionsINDARDEO PARBHUNATHprogress
08/17/2022Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
10/23/2021Structural Steel - DetailsYounes Abouyaalaspecial
10/23/2021Air barrier - visual inspectionTAI LAWALenergy_progress
10/23/2021Fenestration and door U-factor and product ratingsTAI LAWALenergy_progress
10/23/2021Fenestration areasTAI LAWALenergy_progress
10/23/2021Insulation placement and R valuesTAI LAWALenergy_progress
10/23/2021Air barrier — testing TAI LAWALenergy_progress
10/23/2021Exterior Insulation and Finish Systems (EIFS)TAI LAWALspecial
10/23/2021Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
10/23/2021Fenestration air leakageTAI LAWALenergy_progress
10/23/2021MasonryYounes Abouyaalaspecial
10/23/2021Structural Steel - WeldingYounes Abouyaalaspecial
10/23/2021Sprayed fire-resistant materialsYounes Abouyaalaspecial
10/23/2021Structural Cold-Formed SteelYounes Abouyaalaspecial
05/02/2021Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
05/02/2021FinalTAI LAWALprogress
05/02/2021Structural Wood FrameTAI LAWALprogress
05/02/2021PreliminaryTAI LAWALprogress
Latest 25 of 26.
▾Documents — 46 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/31/2026B00514490-I1Request digital key ↗
08/29/2026B00741941-I1Request digital key ↗
08/28/2026B00794646-I1Request digital key ↗
▸Applications & Permits6
▸DOB NOWLPC Approval/Permit4
10/05/2026B00794646-S1Open ↗
08/13/2026B00514490-I1Open ↗
08/13/2026B00794646-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
12/05/2016321487690Open ↗
08/23/2016321062096Open ↗
▸Seals & Professional Certifications19
▸DOB NOWProgress Inspector Seal & Signature10
09/02/2026B00794646-I1Open ↗
09/02/2026B00514490-I1Open ↗
09/02/2026B00514490-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
10/05/2026B00794646-S1Open ↗
08/29/2026B00741941-I1Open ↗
08/13/2026B00514490-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/02/2026B00794646-I1Open ↗
09/02/2026B00514490-I1Open ↗
09/02/2026B00514490-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
12/05/2016321487690Open ↗
08/23/2016321062096Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
12/05/2016321487690Open ↗
08/23/2016321062096Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes1
12/05/2016321487690Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026B00514490-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00514490-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
10/05/2026B00794646-S1Open ↗
08/13/2026B00794646-I1Open ↗
08/13/2026B00514490-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/23/2016321062096Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
12/05/2016321487690Open ↗
08/23/2016321062096Open ↗
▸Approvals, Objections & Sign-offs1
▸BISSCHEDULE A - OCCUPANCY / USE1
12/05/2016321487690Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
12/05/2016321487690Open ↗
08/23/2016321062096Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET3
12/05/2016321487690Open ↗
11/30/2016321487725Open ↗
08/23/2016321062096Open ↗
▸Other Documents1
▸BISPLOT DIAGRAM1
12/05/2016321487690Open ↗