← Back
Two family brick
519 3 STREET
BROOKLYN · BIN 3025335
💬 Discuss this project
1889Year Built
3Stories
B1Building Class
R6BZoning
3,496 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family brick · 1,853 sf lot · 1.89 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbing
Roof4p · 2 filings · 20 docs
Floor 37p · 1 filing · 20 docs
Floor 27p · 1 filing · 20 docs
Floor 16p · 1 filing · 20 docs
Cellar6p · 1 filing · 20 docs
Basement6p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
A & D GENERAL CONTRACTORS INC503/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/10/2022$4.4M—Private party → Private party$1,259/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BOSCHEN DESIGN, ARCHITECTURE1103/21/2026
BROOKLYN SOLARWORKS203/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BLACK SQUARE BUILDERS CORPGeneral Contractor407/08/2026
A & D GENERAL CONTR INCGeneral Contractor303/21/2026
BROOKLYN SOLARWORKS LLCGeneral Contractor203/21/2026
TRI STATE PLBG & HTG INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AK CONSULTING SERVICES, I6198507/28/2026
NKM ENGINEERING PLLC6244208/07/2025
BOSCHEN DESIGN, ARCHITECT2477312/22/2022
PONDOSA DESIGN INC.5126112/22/2022
Building Lifecycle
All (127)Filed (11)Permit Issued (7)Signed Off (5)Violation (1)Inspection (11)Objection (62)Special Inspection (30)
08/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAHFUZAR RAHMAN
08/12/2026
Special inspection requirement — Fire-Resistance Rated Construction
MAHFUZAR RAHMAN
08/12/2026
Special inspection requirement — Masonry
MAHFUZAR RAHMAN
08/12/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
MAHFUZAR RAHMAN
07/28/2026
Filed — Alteration CO
Interior renovations at Basement, 1st Floor, 2nd Floor & 3rd Floor; Partial demolition at Basement and 1st Floor. No changes in use, occupancy or floor area.
B00697154-P2
07/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAHFUZAR RAHMAN
07/27/2026
Special inspection requirement — Fire-Resistance Rated Construction
MAHFUZAR RAHMAN
07/27/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
MAHFUZAR RAHMAN
07/27/2026
Special inspection requirement — Masonry
MAHFUZAR RAHMAN
03/16/2026
Objection resolved — Addressed
03/16/2026
Objection resolved — Addressed
03/12/2026
Objection raised — Cost
03/12/2026
Objection raised — Scope
03/02/2026
Filed — Alteration CO
Interior renovations at Basement, 1st Floor, 2nd Floor & 3rd Floor; Partial demolition at Basement and 1st Floor. No changes in use, occupancy or floor area.
B00697154-P1
02/25/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
MAHFUZAR RAHMAN
02/25/2026
Special inspection requirement — Fire-Resistance Rated Construction
MAHFUZAR RAHMAN
02/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAHFUZAR RAHMAN
02/25/2026
Special inspection requirement — Masonry
MAHFUZAR RAHMAN
11/18/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/08/2025
Signed off — Alteration
INSTALL SOLAR PV ON EXISTING BUILDING ROOFTOP. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
B01223028-I1
08/07/2025
Filed — Alteration
INSTALL SOLAR PV ON EXISTING BUILDING ROOFTOP. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
B01223028-P1
08/07/2025
Special inspection requirement — Final
NARESH MAHANGU
08/07/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
08/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
08/07/2025
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
08/07/2025
Special inspection requirement — Final
NARESH MAHANGU
08/07/2025
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
08/07/2025
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
08/07/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
08/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
08/07/2025
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
06/09/2025
Permit issued — Solar
B01223028-I1-SL
06/04/2025
Filed — Alteration
INSTALL SOLAR PV ON EXISTING BUILDING ROOFTOP. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
B01223028-I1
11/26/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/28/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
06/21/2024
Signed off — Alteration
New HP Heating/Cooling systems for Bsmt, 1st, 2nd & 3rd Floors. No change in use, egress, occupancy or floor area.
B00775867-I1
05/14/2024
Signed off — Alteration
Modification to existing plumbing & gas system. New laundry sink and floor drain at Cellar; relocated Bathroom & Kitchen at Bsmt; New Kitchen and Powder rm at 1st Fl; relocated Bathroom at 2nd Fl; #2 New Bathrooms at 3rd Fl.
B00697632-I1
04/18/2024
Permit issued — Plumbing
B00697632-I1-PL
10/24/2023
Signed off — Alteration
Temporary shoring of rear wall. Removal of portion of rear wall at basement and 1st floor levels as noted on plans. Installation of new steel frame in 1st floor opening. Installation of new rear deck including #2 supporting posts with concrete footings.
B00698543-I1
10/24/2023
Permit issued — Mechanical Systems
B00775867-I1-MS
10/24/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/24/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/16/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/09/2023
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
03/24/2023
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE, NO CHANGESS IN USE IN EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00752346-I1
03/21/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/09/2023
Objection raised — Other
02/09/2023
Objection resolved — Addressed
01/31/2023
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
01/06/2023
Objection raised — Other
01/06/2023
Objection resolved — Addressed
01/06/2023
Objection raised — Other
01/06/2023
Objection resolved — Addressed
01/06/2023
Objection raised — Other
01/06/2023
Objection resolved — Addressed
01/06/2023
Objection raised — Other
01/06/2023
Objection resolved — Addressed
01/06/2023
Objection raised — Other
01/06/2023
Objection resolved — Addressed
01/06/2023
Objection raised — Other
Latest 60 of 127 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offBROOKLYN SOLARWORKS LLC06/09/2025
DOB NOWPlumbingSigned-offDW PLUMBING INC04/18/2024
DOB NOWMechanical SystemsSigned-offBLACK SQUARE BUILDERS COR10/24/2023
DOB NOWStructuralSigned-offBLACK SQUARE BUILDERS COR08/01/2022
DOB NOWPlumbingSigned-offDW PLUMBING INC07/13/2022
DOB NOWGeneral ConstructionPermit IssuedBLACK SQUARE BUILDERS COR06/15/2022
DOB NOWSupported ScaffoldSigned-offA & D GENERAL CONTR INC06/08/2022
2 projects · most recent 05/09/2025
General Wiring
FiledStatusContractorScope
05/09/2025CompleteBROOKYLN SOLARWORKS, LLC—
11/18/2022CompleteGLENDALE ELECTL CONTNG INGeneral Wiring
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
11/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/26/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/28/2024Fail-Final CND-Occupancy InspectionFailView ↗
10/24/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/24/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/16/2023Pass-Final CND-Occupancy InspectionPassView ↗
05/09/2023Fail-Final CND-Occupancy InspectionFailView ↗
03/21/2023Pass-Final CND-Occupancy InspectionPassView ↗
01/31/2023Fail-Final CND-Occupancy InspectionFailView ↗
11/14/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/14/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
08/12/2026Fire-Resistant Penetrations and JointsMAHFUZAR RAHMANspecial
08/12/2026Fire-Resistance Rated ConstructionMAHFUZAR RAHMANprogress
08/12/2026MasonryMAHFUZAR RAHMANspecial
08/12/2026Structural Stability – Alterations of existing buildingsMAHFUZAR RAHMANspecial
07/27/2026Fire-Resistant Penetrations and JointsMAHFUZAR RAHMANspecial
07/27/2026Fire-Resistance Rated ConstructionMAHFUZAR RAHMANprogress
07/27/2026Structural Stability – Alterations of existing buildingsMAHFUZAR RAHMANspecial
07/27/2026MasonryMAHFUZAR RAHMANspecial
02/25/2026Structural Stability – Alterations of existing buildingsMAHFUZAR RAHMANspecial
02/25/2026Fire-Resistance Rated ConstructionMAHFUZAR RAHMANprogress
02/25/2026Fire-Resistant Penetrations and JointsMAHFUZAR RAHMANspecial
02/25/2026MasonryMAHFUZAR RAHMANspecial
08/07/2025FinalNARESH MAHANGUprogress
08/07/2025Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
08/07/2025Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
08/07/2025Energy Code Compliance InspectionsNARESH MAHANGUprogress
08/07/2025FinalNARESH MAHANGUprogress
08/07/2025Air barrier - visual inspectionNARESH MAHANGUenergy_progress
08/07/2025Energy Code Compliance InspectionsNARESH MAHANGUprogress
08/07/2025Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
08/07/2025Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
08/07/2025Air barrier - visual inspectionNARESH MAHANGUenergy_progress
12/22/2022Fire-Resistant Penetrations and JointsRichard Boschenspecial
10/17/2022Fire-Resistant Penetrations and JointsRichard Boschenspecial
07/29/2022FinalMAHFUZAR RAHMANprogress
Latest 25 of 42.
▾Documents — 94 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/29/2026B00752346-I1Request digital key ↗
08/21/2026B01223028-P1Request digital key ↗
08/21/2026B01223028-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits10
▸DOB NOWLPC Approval/Permit10
08/18/2026B00697154-P2Open ↗
08/13/2026B00697154-I1Open ↗
08/13/2026B01223028-I1Open ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications49
▸DOB NOWSpecial Inspector Seal & Signature28
09/02/2026B01223028-I1Open ↗
09/02/2026B01223028-P1Open ↗
09/01/2026B00775867-I1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/28/2026B00697632-I1Open ↗
08/28/2026B00697632-P1Open ↗
08/28/2026B00775867-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/02/2026B01223028-I1Open ↗
09/02/2026B01223028-I1Open ↗
09/02/2026B01223028-P1Open ↗
Showing 3 of 10 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/18/2026B00697154-P2Open ↗
08/13/2026B00697154-P1Open ↗
08/13/2026B00697154-I1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/21/2026B01223028-P1Open ↗
08/21/2026B01223028-I1Open ↗
08/18/2026B00697154-P1Open ↗
Showing 3 of 10 on file for this type
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01223028-I1Open ↗
▸Other Documents10
▸DOB NOWProof of Historic Building6
08/18/2026B00697154-P2Open ↗
08/13/2026B00697154-I1Open ↗
08/13/2026B00775867-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProperty Ownership Certification3
08/18/2026B00697154-P1Open ↗
08/18/2026B00697154-I1Open ↗
08/18/2026B00697154-P2Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00697154-I1Open ↗