← Back
BuildNYC
Public elementary, junior or senior high
P.S. 165 Ida Posner
519 AMBOY STREET · Brownsville · BIN 3082726
💬 Discuss this project
1930Year Built
5Stories
W1Building Class
R6Zoning
—Gross Floor Area
1Units
6 Active Violations 0 unresolved · 6 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC Department of Education · 1.64 FAR built · Flood zone X
Locations of Work
No floor-level scope or filed-document coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority4103/21/2026
NYC Department of Education903/22/2026
Nynex103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A & S ElectricElectrical503/21/2026
M.B.S. ElectricElectrical103/21/2026
Building Lifecycle
All (89)Violation (76)
08/17/2026
Boiler inspection report filed
Initial · defects found · Accepted
05/28/2026
Reissue#35717331K date of issue:05.02.2025 failure to maintain building in code compliant manner.at the time of inspection observed and noted at…
ECB violation · open
05/28/2026
Failure to maintain building in code-compliant manner.at the time of inspection observed and noted fpsc doors at 4TH floor stairway g one exit door…
ECB violation · open
05/28/2026
Reissue#35717332M date of issue:05.02.2025 failure to maintain building in code-compliant manner.illumination for exits,exit discharges and public…
ECB violation · open
11/24/2025
ADM-02-03: Failed to produce approval from the Department of Buildings for design and installation of material, device, equipment, system,…
FDNY_ORDER violation · closed
11/04/2025
Boiler inspection report filed
Initial · no defects · Accepted
11/04/2025
Boiler inspection report filed
Initial · defects found · Accepted
11/18/2024
Boiler inspection report filed
Initial · defects found · Accepted
11/18/2024
ADM-02-01: Failed to provide a Certificate of Occupancy or other authorization or approval issued by the Department of Building or other agency…
FDNY_ORDER violation · closed
05/22/2024
Reissue #35674679N. Failure to maintain building in code-compliant manner. At time of my inspection i observed at roof level the paper have a…
ECB violation · open
05/22/2024
Reissue #35672381M. Failure to maintain building in code-compliant manner. At time of my inspection i observed at the 4TH floor at(room 402)science…
ECB violation · open
10/03/2023
Boiler inspection report filed
Initial · no defects · Accepted
04/14/2023
Failure to maintain building in code-compliant manner.noted:observed during inspection of roof level paper bubbling/rising,detaching from substrate…
ECB violation · open
04/14/2023
Failure to maintain building in code-compliant manner.noted:observed during inspection of 4TH floor(rm 402)science lab office.floor is in…
ECB violation · closed
04/14/2023
Failure to maintain building in code-compliant manner.noted:observed during inspection of exterior stair by exit 5,mason spalling/missing all…
ECB violation · closed
06/16/2022
Boiler inspection report filed
Initial · no defects · Accepted
04/28/2022
Reissued#35561010L failure to maintain building in code compliant manner.illumination for exit,exit corridors discharge.noted:observed emergency…
ECB violation · closed
04/28/2022
Failure to maintain building in code-compliant manner.noted:observed during inspection of roof level the fan/blower cover is completely detached…
ECB violation · closed
08/05/2021
Boiler inspection report filed
Initial · no defects · Accepted
04/26/2021
Failure to maintain bldg in codecompliant manner noted:@1FL from auditorium passageway/EXIT4 blocked/obstructed by excessive amt of various items…
ECB violation · closed
04/26/2021
Exit door not selfclosing noted:@4FL stairf&g door checks in disrepair/nonoperational when tested.repair/replace door.
ECB violation · closed
04/26/2021
Failure to maintain bldg in codecompliant manner illumination for exits,exit discharges&public corridors per BC1006.1/27-381 noted:@1FL gym…
ECB violation · closed
04/26/2021
Failure to maintain bldg in codecompliant manner noted:@4FL stairf&g 1FL auditorium,EXITS3&5 doors in disrepair/racked.repair &/or replace.
ECB violation · closed
09/25/2020
Boiler inspection report filed
Initial · defects found · Accepted
09/25/2020
Boiler inspection report filed
Subsequent · no defects · Accepted
09/25/2020
Boiler inspection report filed
Subsequent · defects found · Accepted
12/21/2019
Boiler inspection report filed
Initial · defects found · Accepted
06/14/2018
Boiler inspection report filed
Initial · no defects · Accepted
10/13/2017
Boiler inspection report filed
Initial · no defects · Accepted
10/06/2016
Failure to maintain bldg in code-compliant manner.noted:@ 4TH flr in the corridor next to room 403 wall,chunk of plaster has…
ECB violation · closed
10/06/2016
Failure to maintain bldg in code-compliant manner.noted:spalling plaster @room 401,402 due to roof leack.rem:make necessary repairs.
ECB violation · closed
09/21/2015
Exit door not self-closing.at the time of inspection observed auditorium exit doors not self-colsing,doors dragging/sagging on the floors. Remedy:…
ECB violation · closed
09/21/2015
Reissue #35111968L.failure to maintain building in a code compliant manner.at the time of inspection observed cracked and uneven floor tilesat the…
ECB violation · closed
07/17/2014
Re-issue # 35019279Y. Cracked & uneven floor tiles at cafeteria & other 1ST floor locations. Potential trip hazard. Remedy: repair &/or replace.
ECB violation · closed
07/17/2014
Spalling plaster on walls and/or ceiling rooms 401,402,411.
ECB violation · closed
07/17/2014
Water penetration from roof and/or facade rooms 401,402,404,411. Rmdy: maintain building.
ECB violation · closed
04/30/2013
Handrail at exit stairs 6&f broken and loose from 2ND to 3RD flrs. Remedy: repair defects.
ECB violation · closed
04/30/2013
Reissue previous nov 34941178N tripping hazard. Cracked & uneven floor tiles located at cafeteria. Remedy: repair and/or replace.
ECB violation · closed
04/30/2013
Reissue: previous nov. 34941177L. Spalling/water damaged plaster ceil-ings at 1ST story kitchen above wash sink & vestibule ceiling at EXIT2REMEDY:…
ECB violation · closed
02/15/2012
Reissue # 34927634R. Water damaged plaster walls/ceilings at: 5TH story rooms designated 401,402. Remedy: repair defects noted.
ECB violation · closed
02/15/2012
Tripping hazard/cracked flooring at: 1ST story cafeteria various locations floor/floor tile cracked/raised creating trip hazards. Remedy:…
ECB violation · closed
02/15/2012
Spalling/water damaged plaster ceilings at: 1ST story kitchen above wash sink & vestibule ceiling exit 2. Remedy: repair defects noted.
ECB violation · closed
02/15/2012
Doors not closing at: 1ST story stair g & i, 2ND story stair h, 3RD story stair f,g & h, 4TH story stair g & h, 5TH story stair g & h. Remedy:…
ECB violation · closed
10/31/2011
Vc 11: failed to provide general maintenance
FDNY_NOV violation · closed
10/04/2011
Water penetration into rooms 402, 401 also throughout eastside of bldgremedy: seal penetration
ECB violation · closed
08/04/2010
Re-issue: 34777491H. Failure to maintain. Noted: horizontal cracks noted in cafeteria. Remedy: repair cracks
ECB violation · closed
05/22/2009
Use of prohibited door/hardware at first flr gym and caf exit doors tomain lobby installed closers and overhead stop to existing f.p.s.c door that…
ECB violation · closed
05/22/2009
Failure to maintain missing 2 x 2 wire glass 1 flr stair f 3FLR stair h. Remedy: install glass/maintain rating of stairs.
ECB violation · closed
05/22/2009
Reissue: 34711940M spalling/cracked plaster ceiling stair e caf several locations 4 flr. Remedy: repair ceiling.
ECB violation · closed
11/13/2008
Reissue 34563073L water penetration @ exit e, b 1ST fl cafeteria and rm 460 rem: seal penetration
ECB violation · closed
02/14/2007
Water damage at cafeteria roof. Remedy: repair the roof
ECB violation · closed
02/28/2006
Reissue: 34474437Z failure to install door know at bulkhead at roof level. Remedy: install hardware at bulkhead roof level.
ECB violation · closed
03/18/2005
Missing hardware, door knob,not installed at bulkhead roof door. Remedy: provide hardware for bulkhead roof door
ECB violation · closed
03/18/2005
Water penetration through foundation walls into basement at s/w cornerremedy: stop water penetration make all necessary repairs.
ECB violation · closed
03/18/2005
Water penetration through roof into auditorium. Remedy: repair roof
ECB violation · closed
02/19/2003
" reissue " failure to maintain defect is water penetrating through south side brick wall in celalr water heater room remedy : repair wall
ECB violation · closed
02/19/2003
Failure to maintain defect is loose and haning ceiling plaster in cafeteria room remedy : repair ceiling
ECB violation · closed
02/19/2003
" reissue " failure to maintain defets are missing broken and defective wood seats at various locations in auditorium remedy : replace seats
ECB violation · closed
04/24/2002
Re - issued failure to maintian building exterior - defets are : metal plates over drain in school yard are damaged, creating possible trip hazard.…
ECB violation · closed
04/24/2002
Re - issued failure to maintian building : defects are : large cracks on wall @ 4TH fl level in stair way # 4, rm 406, and stairs 5 @ 4TH fl.…
ECB violation · closed
Latest 60 of 89 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BIS—Adam's European Contracting—
BIS—Volmar Construction—
BIS—Volmar Construction—
BIS—Adam's European Contracting—
BIS—Adam's European Contracting—
BIS—VMC Plumbing & Heating—
BIS—Volmar Construction—
BIS—Volmar Construction—
BIS—Adam's European Contracting—
BIS—Volmar Construction—
BIS—Volmar Construction—
BIS—Superior Plumbing & Heating—
BIS—Adam's European Contracting—
BIS—Adam's European Contracting—
BIS—Volmar Construction—
BIS—Volmar Construction—
BIS—Volmar Construction—
BIS—Adam's European Contracting—
BIS—Adam's European Contracting—
BIS—Adam's European Contracting—
BIS—Adam's European Contracting—
BIS—H Vak Mechanical—
BIS—Kanta Electric—
BIS—Par Plumbing Co—
BIS—Dewaters PBG & Htgllc—
BIS—Chapman & Evans Contracting—
BIS—N.J.D. Wiring & Electric I—
BIS—N.J.D. Wiring & Electric I—
BIS—D.hs Mechanical—
BIS—Chapman & Evans Contracting—
BIS—Vardaris Tech—
BIS—Vardaris Tech—
BIS—Dewaters PBG & Htgllc—
BIS—N.J.D. Wiring & Electric I—
BIS—Vardaris Tech—
BIS—Dewaters PBG & Htgllc—
BIS—Vardaris Tech—
BIS—Metropolitan Enterprises—
BIS—Metropolitan Enterprises—
BIS—N.J.D. Wiring & Electric I—
+ 10 more permits on file
Nothing on file for this building.
Nothing on file for this building.
▾Documents — 14 on file (BIS + DOB NOW)
▸Applications & Permits2
▸BISWORK PERMIT APPLICATION1
03/07/2011320276946Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
03/07/2011320276946Open ↗
▸Seals & Professional Certifications4
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
06/09/2011320276946Open ↗
03/07/2011320276946Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/07/2011320276946Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
03/07/2011320276946Open ↗
▸Trade Schedules & Equipment2
▸BISSELF-CERT PLUMBING NOTICE1
05/31/2011320276946Open ↗
▸BISSCHEDULE B - PLUMBING1
03/07/2011320276946Open ↗
▸Environmental & Asbestos1
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
03/07/2011320276946Open ↗
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
06/09/2011320276946Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
03/07/2011320276946Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
06/09/2011320276946Open ↗
03/07/2011320276946Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
03/07/2011320276946Open ↗