← Back
BROOKLYN
519 EAST 85TH STREET
BROOKLYN · Canarsie · BIN 3222833
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Open ViolationsFDNY Report ↗
Flood zone X
Locations of Work
MechanicalPlumbing
Floor 26p · 2 filings · 20 docs
Floor 16p · 2 filings · 20 docs
Cellar6p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1404 PITKIN AVE LLC703/22/2026
519 EAST 85TH ST407/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NY BUILDING ASSOCIATES INC310/21/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AM EXPEDITING DRAFTING DESIGN603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PJB CONSTRUCTION LLCGeneral Contractor107/08/2026
PRIME PIPING & HEATING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MARCH CHADWICK, ARCHITECT2253210/21/2021
AR-TECH ENGINEERING, P.C.6659112/11/2020
Building Lifecycle
All (50)Filed (3)Permit Issued (2)Signed Off (2)Violation (3)Inspection (5)Objection (18)Special Inspection (17)
01/06/2022
Signed off — Alteration
APPLICATION FILED HEREWITH TO PROPOSED NEW MECHANICAL DUCTS AND SYSTEMS AS PER PLANS. NO CHANGE IN EGRESS, OCCUPANCY AND USE.
B00439225-I1
12/22/2021
Signed off — Alteration
PLUMBING WORK COMBINED WITH INTERIOR RENOVATION APPLICATION TO RESOLVE VIOLATION #39034095K REPLACEMENT AND REPAIRS OF EXISTING GAS PIPING AND REMOVAL AND REPLACEMENT OF EXISTING PLUMBING FIXTURES (ONLY FIXTURES) NO CHNAGE IN USE, EGRESS OR OCCUPANCY
B00471384-I1
12/15/2021
Permit issued — Mechanical Systems
B00439225-I1-MS
11/24/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/22/2021
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/19/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/29/2021
Special inspection requirement — Energy Code Compliance
MARCH CHADWICK
10/29/2021
Special inspection requirement — Maintenance information
MARCH CHADWICK
10/29/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARCH CHADWICK
10/21/2021
Filed — Alteration
PLUMBING WORK COMBINED WITH INTERIOR RENOVATION APPLICATION TO RESOLVE VIOLATION #39034095K REPLACEMENT AND REPAIRS OF EXISTING GAS PIPING AND REMOVAL AND REPLACEMENT OF EXISTING PLUMBING FIXTURES (ONLY FIXTURES) NO CHNAGE IN USE, EGRESS OR OCCUPANCY
B00471384-P1
10/02/2021
Special inspection requirement — Maintenance information
MARCH CHADWICK
10/02/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARCH CHADWICK
10/02/2021
Special inspection requirement — Energy Code Compliance
MARCH CHADWICK
09/22/2021
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/13/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/11/2021
Permit issued — Plumbing
B00471384-I1-PL
04/05/2021
Violation issued (ECB, closed)
Construction
03/31/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/08/2021
Objection raised — Scope
03/08/2021
Objection resolved — Addressed
03/08/2021
Objection raised — Admin
03/08/2021
Objection resolved — Addressed
03/08/2021
Objection raised — Inspections
03/08/2021
Objection resolved — Addressed
03/03/2021
Filed — Alteration
PLUMBING WORK COMBINED WITH INTERIOR RENOVATION APPLICATION TO RESOLVE VIOLATION #39034095K REPLACEMENT AND REPAIRS OF EXISTING GAS PIPING AND REMOVAL AND REPLACEMENT OF EXISTING PLUMBING FIXTURES (ONLY FIXTURES) NO CHNAGE IN USE, EGRESS OR OCCUPANCY
B00471384-I1
12/30/2020
Violation issued (ECB, closed)
Construction
12/15/2020
Objection raised — Scope
12/15/2020
Objection resolved — Addressed
12/15/2020
Objection raised — Scope
12/15/2020
Objection resolved — Addressed
12/15/2020
Objection raised — Scope
12/15/2020
Objection resolved — Addressed
12/15/2020
Objection raised — Mechanical
12/15/2020
Objection resolved — Addressed
12/15/2020
Objection raised — Fire_Protection
12/15/2020
Objection resolved — Addressed
12/15/2020
Objection raised — Inspections
12/15/2020
Objection resolved — Addressed
12/11/2020
Filed — Alteration
APPLICATION FILED HEREWITH TO PROPOSED NEW MECHANICAL DUCTS AND SYSTEMS AS PER PLANS. NO CHANGE IN EGRESS, OCCUPANCY AND USE.
B00439225-I1
12/11/2020
Special inspection requirement — Fire-Resistance Rated Construction
MARCH CHADWICK
12/11/2020
Special inspection requirement — Energy Code Compliance Inspections
MARCH CHADWICK
12/10/2020
Special inspection requirement — Shutoff dampers
MARCH CHADWICK
12/10/2020
Special inspection requirement — Duct leakage testing
MARCH CHADWICK
12/10/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALBERTO ROMAN
12/10/2020
Special inspection requirement — Final
MARCH CHADWICK
12/10/2020
Special inspection requirement — HVAC insulation and sealing
MARCH CHADWICK
12/10/2020
Special inspection requirement — HVAC and service water heating system controls
MARCH CHADWICK
12/10/2020
Special inspection requirement — HVAC and service water heating equipment
MARCH CHADWICK
12/10/2020
Special inspection requirement — Mechanical Systems
ALBERTO ROMAN
12/10/2020
Special inspection requirement — Maintenance information
MARCH CHADWICK
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offPJB CONSTRUCTION LLC12/15/2021
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN08/11/2021
BISOTISSUEDPJB CONSTRUCTION LLC12/01/2021
1 project · most recent 11/17/2021
General Wiring
FiledStatusContractorScope
11/17/2021CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
11/24/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/22/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/19/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/22/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/13/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
10/29/2021Energy Code ComplianceMARCH CHADWICKprogress
10/29/2021Maintenance informationMARCH CHADWICKenergy_progress
10/29/2021Fire-Resistant Penetrations and JointsMARCH CHADWICKspecial
10/02/2021Maintenance informationMARCH CHADWICKenergy_progress
10/02/2021Fire-Resistant Penetrations and JointsMARCH CHADWICKspecial
10/02/2021Energy Code ComplianceMARCH CHADWICKprogress
12/11/2020Fire-Resistance Rated ConstructionMARCH CHADWICKprogress
12/11/2020Energy Code Compliance InspectionsMARCH CHADWICKprogress
12/10/2020Shutoff dampersMARCH CHADWICKenergy_progress
12/10/2020Duct leakage testing MARCH CHADWICKenergy_progress
12/10/2020Fire-Resistant Penetrations and JointsALBERTO ROMANspecial
12/10/2020FinalMARCH CHADWICKprogress
12/10/2020HVAC insulation and sealing MARCH CHADWICKenergy_progress
12/10/2020HVAC and service water heating system controls MARCH CHADWICKenergy_progress
12/10/2020HVAC and service water heating equipment MARCH CHADWICKenergy_progress
12/10/2020Mechanical SystemsALBERTO ROMANspecial
12/10/2020Maintenance informationMARCH CHADWICKenergy_progress
▾Documents — 61 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch - Plumbing2
09/01/2026B00471384-P1Request digital key ↗
08/15/2026B00471384-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/15/2026B00439225-I1Request digital key ↗
▸Applications & Permits5
▸BISWORK PERMIT APPLICATION4
12/04/2021340802572Open ↗
12/03/2021340802572Open ↗
11/26/2021340802572Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION1
01/10/2022340802572Open ↗
▸Seals & Professional Certifications21
▸DOB NOWProgress Inspector Seal & Signature13
09/01/2026B00471384-P1Open ↗
09/01/2026B00471384-P1Open ↗
08/29/2026B00471384-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026B00471384-P1Open ↗
08/29/2026B00471384-I1Open ↗
08/28/2026B00439225-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/13/2026B00471384-I1Open ↗
08/13/2026B00471384-P1Open ↗
08/13/2026B00439225-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
02/02/2021340802572Open ↗
▸Trade Schedules & Equipment3
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
01/13/2022340802572Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
01/25/2022340802572Open ↗
▸BISPLUMBING (PL) SIGNOFF1
01/25/2022340802572Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/13/2026B00471384-I1Open ↗
08/13/2026B00439225-I1Open ↗
08/13/2026B00471384-P1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
02/02/2021340802572Open ↗
▸Energy Compliance10
▸BISAS-BUILT ENERGY ANALYSIS4
02/18/2022340802572Open ↗
02/16/2022340802572Open ↗
01/24/2022340802572Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
02/18/2022340802572Open ↗
02/16/2022340802572Open ↗
01/24/2022340802572Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00439225-I1Open ↗
08/13/2026B00471384-I1Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY4
02/18/2022340802572Open ↗
02/16/2022340802572Open ↗
01/24/2022340802572Open ↗
Showing 3 of 4 on file for this type
▸BISDOB FINAL INSPECTION REQUIRED1
02/16/2022340802572Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
02/19/2022340802572Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
01/24/2022340802572Open ↗
01/13/2022340802572Open ↗
05/06/2021340802572Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
02/16/2022340802572Open ↗
▸Filing & Intake Forms5
▸BISBOROUGH INTAKE FORM3
12/04/2021340802572Open ↗
12/03/2021340802572Open ↗
11/10/2021340802572Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
02/02/2021340802572Open ↗
▸BISADDITIONAL INFORMATION1
02/09/2022340802572Open ↗