← Back
BuildNYC
Condo, residential unit in elevator building
Highline 519
519 WEST 23RD STREET · BIN 1087672
💬 Discuss this project
2005Year Built
12Stories
R4Building Class
C6-3AZoning
18,732 sfGross Floor Area
11Units
Rent Stabilized5 Active Violations 2 unresolved · 3 paperwork only 6 likely answered 3 old, status unconfirmed ▸FISP: UNSAFE
Condo, residential unit in elevator building · 2,469 sf lot · 7.59 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentLandscapeGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofExterior restoration2p · 2 filings · 12 docs
Floor 12Daisy Management LLC1 filing · 11 docs
Floor 11
Floor 10Daisy Management LLC1 filing · 11 docs
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Heavy duty sidewalk shed installation7p · 2 filings · 6 docs
CellarCondenser loop maintenance upgrades1 filing · 3 docs
Site & exteriorTemporary pipe scaffold installation8p · 2 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Sleepy Hudson4603/21/2026
Teai1603/21/2026
519 West 23rd St Condominium603/21/2026
Highline Park403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Tahir Demircioglu Architect206/03/2026
Mje Professional Services207/21/2025
Asr Engineering103/29/2023
Anz Consulting Engineering112/22/2022
Paradigm Architecture112/01/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HTX Building Consulting103/21/2026
K M DOB Consulting203/21/2026
SNR Expediting Design403/21/2026
Expediting103/21/2026
Municipal Building Consultants103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KLG ContractingGeneral Contractor304/09/2026
Reliable EnterprisesScaffold308/26/2026
Elite Quality ConstructionGeneral Contractor107/08/2026
Paccione ChristopherElectrical103/21/2026
Topline NYCScaffold107/08/2026
Topline NYC ContractingScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Chong Engineering7411306/03/2026
Paradigm Architecture5931112/01/2022
Uni-D7898112/01/2022
Building Lifecycle
All (107)Filed (7)Permit Issued (9)Signed Off (3)Facade (FISP) (17)Violation (60)Special Inspection (11)
09/01/2026
Cycle 10 facade report submitted
08/19/2026
Cycle 10 facade inspection completed
07/30/2026
Signed off — Alteration
REPLACEMENT OF GLASS RAILINGS ON 10TH AND 12TH FLOOR TERRACES TO RESPOND AND RESOLVE VATE ORDER AND VIOLATION #07252325LL011DO3. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01283384-I1
07/20/2026
Permit issued — Sidewalk Shed
M01255532-I1-SH
06/08/2026
Special inspection requirement — Structural Steel - Welding
Tae Chong
06/08/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Tae Chong
06/08/2026
Special inspection requirement — Structural Steel - Details
Tae Chong
06/08/2026
Special inspection requirement — Post-installed Anchors
Tae Chong
06/08/2026
Special inspection requirement — Tenant Protection Plan Compliance
Tae Chong
06/08/2026
Special inspection requirement — Final
Tae Chong
06/03/2026
Filed — Alteration
REPLACEMENT OF GLASS RAILINGS ON 10TH AND 12TH FLOOR TERRACES TO RESPOND AND RESOLVE VATE ORDER AND VIOLATION #07252325LL011DO3. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01283384-P1
05/04/2026
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01257619-I1
04/20/2026
Violation issued (ECB, open)
Local Law
02/13/2026
Permit issued — Structural
M01283384-I1-GC-CX
12/24/2025
Permit issued — Structural
M01283384-I1-GC-CX
09/29/2025
Permit issued — Structural
M01283384-I1-GC-CX
09/10/2025
Filed — Alteration
REPLACEMENT OF GLASS RAILINGS ON 10TH AND 12TH FLOOR TERRACES TO RESPOND AND RESOLVE VATE ORDER AND VIOLATION #07252325LL011DO3. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01283384-I1
07/25/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/22/2025
Permit issued — Supported Scaffold
M01257619-I1-SF
07/21/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01257619-I1
07/15/2025
Permit issued — Sidewalk Shed
M01255532-I1-SH
07/14/2025
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01255532-I1
07/11/2025
Violation issued (ECB, closed)
Construction
07/01/2025
Signed off — Alteration
LIMITED EXTERIOR REPAIRS OF THE BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M08046123-I1
06/23/2025
Cycle 10 facade report submitted
06/06/2025
Cycle 10 facade report signed — UNSAFE
05/22/2025
Cycle 10 facade inspection completed
12/18/2023
Permit issued — Sidewalk Shed
M00851566-I1-SH
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/20/2023
Permit issued — General Construction
M08046123-I1-GC
03/29/2023
Filed — Alteration
M00851566-I1
03/29/2023
Permit issued — Sidewalk Shed
M00851566-I1-SH
03/03/2023
Cycle 9 facade report submitted
03/03/2023
Cycle 9 facade report signed — UNSAFE
03/02/2023
Cycle 9 facade inspection completed
12/22/2022
Filed — Alteration
new 1" cold water connect to cellar boiler room , and new gycol feed tank piping connection to condenser water riser at roof as per pl plans , no change in use, egress or occupancy
M08031019-I1
12/01/2022
Filed — Alteration
LIMITED EXTERIOR REPAIRS OF THE BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M08046123-I1
11/28/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anthony Addesso
11/28/2022
Special inspection requirement — Tenant Protection Plan Compliance
Jackie Bolalin
11/28/2022
Special inspection requirement — Final
Anthony Addesso
11/28/2022
Special inspection requirement — Energy Code Compliance Inspections
Anthony Addesso
11/28/2022
Special inspection requirement — Air barrier - visual inspection
Anthony Addesso
02/14/2022
Cycle 9 facade report submitted
02/14/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/14/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/10/2022
Cycle 9 facade report signed — UNSAFE
02/07/2022
Cycle 9 facade inspection completed
06/03/2021
Violation issued (ECB, closed)
Elevators
01/06/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/08/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/08/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/15/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/31/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/16/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/25/2017
Cycle 8 facade report signed — SWARMP
07/17/2017
Cycle 8 facade report submitted
05/31/2017
Cycle 8 facade inspection completed
Latest 60 of 107 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedReliable Enterprises07/20/2026
DOB NOWStructuralSigned-offKLG Contracting02/13/2026
DOB NOWStructuralSigned-offKLG Contracting12/24/2025
DOB NOWStructuralSigned-offKLG Contracting09/29/2025
DOB NOWSupported ScaffoldSigned-offReliable Enterprises07/22/2025
DOB NOWSidewalk ShedPermit IssuedReliable Enterprises07/15/2025
DOB NOWSidewalk ShedPermit IssuedTopline NYC12/18/2023
DOB NOWGeneral ConstructionSigned-offElite Quality Construction04/20/2023
DOB NOWSidewalk ShedPermit IssuedTopline NYC Contracting03/29/2023
BISOTISSUEDConde09/21/2016
BISOTISSUEDConde11/17/2014
BISOTISSUEDConde08/06/2014
BISOTISSUEDEas Construction04/11/2014
BISPLISSUEDDemar Plumbing08/18/2008
BISOTISSUEDA.J. Lewis03/13/2008
BISBLISSUEDDemar Plumbing06/13/2007
BISEQISSUEDPerimeter Bridge & Scaffold04/10/2007
BISEQISSUEDPerimeter Bridge & Scaffold04/02/2007
BISEQISSUEDPerimeter Bridge & Scaffold03/27/2007
BISSPISSUEDDemar Plumbing01/25/2007
BIS—ISSUEDLeeds United Construction01/25/2007
BISEQISSUEDLeeds United Construction01/25/2007
BIS—ISSUEDNTD Construction01/19/2007
BISEQISSUEDNTD Construction01/19/2007
BISEQISSUEDPerimeter Bridge & Scaffold12/08/2006
BISEQISSUEDPerimeter Bridge & Scaffold04/13/2006
BISEQISSUEDPerimeter Bridge & Scaffold04/13/2006
BISEQISSUEDNTD Construction01/27/2006
BIS—ISSUEDNTD Construction01/27/2006
BISEQISSUEDPerimeter Bridge & Scaffold12/02/2005
BIS—ISSUEDNTD Construction11/23/2005
BISEQISSUEDNTD Construction11/23/2005
BISEQISSUEDAbr Mould. LLC Abr G C11/09/2005
BISPLISSUEDDemar Plumbing08/23/2005
BIS—ISSUEDAbr Mould. LLD Abr GC08/11/2005
BISEQISSUEDAbr Mould. LLC Abr G C01/25/2005
BIS—ISSUEDAbr Mould. LLD Abr GC11/15/2004
BISEQISSUEDAbr Mould. LLC Abr G C11/15/2004
BIS—ISSUEDKatselnik & Katselnik Group06/16/2004
BISEQISSUEDKatselnik & Katselnik Group06/16/2004
+ 9 more permits on file
1 project · most recent 12/22/2022
Water/Sanitary
FiledStatusContractorScope
12/22/2022——Water/Sanitary
3 projects · most recent 07/15/2025
FiledStatusContractorScope
07/15/2025Permit IssuedRichard Neu—
04/02/2024CompleteAsset Electric—
03/30/2023Permit IssuedRichard Neu—
1 project · most recent 06/03/2026
Steel
FiledStatusContractorScope
06/03/2026Signed-offKLG ContractingSteel
2 projects · most recent 07/21/2025
Scaffold Sidewalk Shed
FiledStatusContractorScope
07/21/2025Signed-offReliable EnterprisesScaffold
07/14/2025Permit IssuedReliable EnterprisesSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
06/08/2026Structural Steel - WeldingTae Chongspecial
06/08/2026Structural Stability – Alterations of existing buildingsTae Chongspecial
06/08/2026Structural Steel - DetailsTae Chongspecial
06/08/2026Post-installed AnchorsTae Chongspecial
06/08/2026Tenant Protection Plan ComplianceTae Chongspecial
06/08/2026FinalTae Chongprogress
11/28/2022Structural Stability – Alterations of existing buildingsAnthony Addessospecial
11/28/2022Tenant Protection Plan ComplianceJackie Bolalinspecial
11/28/2022FinalAnthony Addessoprogress
11/28/2022Energy Code Compliance InspectionsAnthony Addessoprogress
11/28/2022Air barrier - visual inspectionAnthony Addessoenergy_progress
▾Documents — 87 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
09/01/2026M08046123-I1Request digital key ↗
09/01/2026M08031019-I1Request digital key ↗
08/31/2026M00851566-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits12
▸BISWORK PERMIT APPLICATION7
09/30/2016121894968Open ↗
11/26/2014121894968Open ↗
08/16/2014121894968Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
12/15/2016121894968Open ↗
11/18/2016121894968Open ↗
01/16/2014121894968Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHPD Certification Letter or CPC Special Permit1
08/13/2026M08046123-I1Open ↗
▸Seals & Professional Certifications34
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
07/17/2018121894968Open ↗
06/20/2014140143137Open ↗
01/16/2014121894968Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/31/2026M00851566-I1Open ↗
08/17/2026M01283384-P1Open ↗
08/13/2026M01283384-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/30/2026M08046123-I1Open ↗
08/30/2026M08046123-I1Open ↗
08/28/2026M01283384-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
01/16/2014121894968Open ↗
11/26/2007110019925Open ↗
10/18/2007104720250Open ↗
▸BISPC FULL REPORT3
02/06/2008110282612Open ↗
11/14/2007110019925Open ↗
10/18/2007104720250Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
08/30/2026M08046123-I1Open ↗
08/30/2026M08046123-I1Open ↗
08/28/2026M01283384-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
01/16/2014121894968Open ↗
12/11/2013140143137Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
11/14/2007110019925Open ↗
10/18/2007104720250Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
12/11/2013140143137Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/11/2013140143137Open ↗
▸Safety & Tenant Protection10
▸DOB NOWHPD-1: Anti-Harassment Area Checklist7
08/17/2026M01283384-P1Open ↗
08/13/2026M08046123-I1Open ↗
08/13/2026M00851566-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWCertificate of No Harassment3
08/17/2026M01283384-P1Open ↗
08/13/2026M08046123-I1Open ↗
08/13/2026M01283384-I1Open ↗
▸Environmental & Asbestos3
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
11/14/2007110019925Open ↗
10/18/2007104720250Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
02/06/2008110282612Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
07/17/2018121894968Open ↗
01/16/2014121894968Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
07/17/2018121894968Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
12/11/2013140143137Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
12/11/2013140143137Open ↗
▸Approvals, Objections & Sign-offs8
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
07/17/2018121894968Open ↗
06/20/2014140143137Open ↗
10/27/2008110282612Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
08/16/2014121894968Open ↗
06/20/2014140143137Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
02/06/2008110282612Open ↗
11/14/2007110019925Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
07/17/2018121894968Open ↗
01/16/2014121894968Open ↗
03/13/2008110282612Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
04/16/2014121894968Open ↗
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET1
01/16/2014121894968Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
12/11/2013140143137Open ↗
▸BISBOROUGH INTAKE FORM1
07/17/2018121894968Open ↗
▸BISADDITIONAL INFORMATION1
12/15/2016121894968Open ↗