← Back
STATEN ISLAND
51GAR THE OVAL
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
ArchitectureStructural
Roof2p · 1 filing · 19 docs
Floor 214p · 2 filings · 20 docs
Floor 116p · 2 filings · 20 docs
Cellar1p · 1 filing · 19 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RAMPULLA ASSOCIATES ARCHITECTS, LLP806/12/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RAMPULLA ASSOCIATES ARCHITECTS1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J. MANGONE CONSTRUCTIONGeneral Contractor607/08/2026
PLUMBING NYC INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AVT ENGINEERING345306/12/2024
Building Lifecycle
All (53)Filed (8)Permit Issued (5)Signed Off (2)Inspection (6)Objection (2)Special Inspection (30)
06/12/2024
Filed — New Building
Construction of a detached accessory two-story, two-car garage with the second floor serving as accessory office space.
S00579176-P3
06/06/2024
Special inspection requirement — Concrete - Cast-In-Place
JOSEPH PASATURO
06/06/2024
Special inspection requirement — Interior lighting power
JOSEPH PASATURO
06/06/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
JOSEPH PASATURO
06/06/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
JOSEPH PASATURO
06/06/2024
Special inspection requirement — Permanent certificate
JOSEPH PASATURO
06/06/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
06/06/2024
Special inspection requirement — Final
JOSEPH PASATURO
06/06/2024
Special inspection requirement — Fire-Resistance Rated Construction
JOSEPH PASATURO
06/06/2024
Special inspection requirement — Footing and Foundation
JOSEPH PASATURO
06/06/2024
Special inspection requirement — Subgrade Inspections
JOSEPH PASATURO
06/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSEPH PASATURO
06/06/2024
Special inspection requirement — Energy Code Compliance Inspections
JOSEPH PASATURO
06/06/2024
Special inspection requirement — Insulation placement and R values
JOSEPH PASATURO
06/06/2024
Special inspection requirement — Fenestration air leakage
JOSEPH PASATURO
06/06/2024
Special inspection requirement — Electric vehicle service equipment requirements
JOSEPH PASATURO
06/06/2024
Special inspection requirement — Maintenance information
JOSEPH PASATURO
06/06/2024
Special inspection requirement — Metering
JOSEPH PASATURO
06/06/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JOSEPH PASATURO
06/06/2024
Special inspection requirement — Fenestration areas
JOSEPH PASATURO
06/06/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
JOSEPH PASATURO
06/06/2024
Special inspection requirement — Air barrier — testing
JOSEPH PASATURO
06/06/2024
Special inspection requirement — Structural Wood Frame
JOSEPH PASATURO
05/20/2024
Filed — New Building
Construction of a detached accessory two-story, two-car garage with the second floor serving as accessory office space.
S00579176-P2
05/20/2024
Special inspection requirement — Final
JOSEPH PASATURO
05/20/2024
Special inspection requirement — Energy Code Compliance Inspections
JOSEPH PASATURO
05/20/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
05/20/2024
Special inspection requirement — Subgrade Inspections
JOSEPH PASATURO
05/20/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
JOSEPH PASATURO
05/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSEPH PASATURO
05/20/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
JOSEPH PASATURO
05/20/2024
Special inspection requirement — Concrete - Cast-In-Place
JOSEPH PASATURO
05/16/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/08/2023
Permit issued — Structural
S00579176-I1-ST
06/08/2023
Permit issued — Foundation
S00579176-I1-FO
03/13/2023
Signed off — Alteration
S00587553-I1
03/13/2023
Inspection — Pass-Final Fence Non-Directive 14
Pass
View inspection ↗
03/10/2023
Signed off — Alteration
Plumbing work as per plans and in conjunction with 2 story garage
S00587572-I1
02/27/2023
Filed — Alteration
Plumbing work as per plans and in conjunction with 2 story garage
S00587572-P1
09/27/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/01/2022
Inspection — Pass-Final Construction Permit Withdrawal
Pass
View inspection ↗
04/20/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/01/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/28/2022
Permit issued — Plumbing
S00587572-I1-PL
01/24/2022
Permit issued — General Construction
S00579176-I1-GC
01/10/2022
Filed — Alteration
S00587553-P1
01/08/2022
Permit issued — Construction Fence
S00587553-I1-FN
11/18/2021
Filed — New Building
Construction of a detached accessory two-story, two-car garage with the second floor serving as accessory office space.
S00579176-P1
10/12/2021
Objection raised — Scope
10/12/2021
Objection resolved — Addressed
09/20/2021
Filed — Alteration
Plumbing work as per plans and in conjunction with 2 story garage
S00587572-I1
09/02/2021
Filed — Alteration
S00587553-I1
09/02/2021
Filed — New Building
Construction of a detached accessory two-story, two-car garage with the second floor serving as accessory office space.
S00579176-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offJ. MANGONE CONSTRUCTION06/08/2023
DOB NOWFoundationSigned-offJ. MANGONE CONSTRUCTION06/08/2023
DOB NOWPlumbingSigned-offPLUMBING WORKS NYC INC03/28/2022
DOB NOWGeneral ConstructionPermit IssuedJ. MANGONE CONSTRUCTION01/24/2022
DOB NOWConstruction FenceSigned-offJ. MANGONE CONSTRUCTION01/08/2022
1 project · most recent 01/20/2023
General Wiring
FiledStatusContractorScope
01/20/2023CompleteREM & SONS LIC ELEC CONTGeneral Wiring
1 project · most recent 06/12/2024
Concrete Wood
FiledStatusContractorScope
06/12/2024Signed-offJ. MANGONE CONSTRUCTIONConcrete, Wood
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
05/16/2024Pass-Final CND-Occupancy InspectionPassView ↗
03/13/2023Pass-Final Fence Non-Directive 14PassView ↗
09/27/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/01/2022Pass-Final Construction Permit WithdrawalPassView ↗
04/20/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/01/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 66
DateRequirementInspectorRole
06/06/2024Concrete - Cast-In-PlaceJOSEPH PASATUROspecial
06/06/2024Excavations - Sheeting, Shoring, and BracingJOSEPH PASATUROspecial
06/06/2024Fire-Resistant Penetrations and JointsJOSEPH PASATUROspecial
06/06/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationJOSEPH PASATUROspecial
06/06/2024Subgrade InspectionsJOSEPH PASATUROspecial
06/06/2024Subsurface Investigations (Borings/Test Pits)anthony santorospecial
06/06/2024Energy Code Compliance InspectionsJOSEPH PASATUROprogress
06/06/2024FinalJOSEPH PASATUROprogress
06/06/2024Fire-Resistance Rated ConstructionJOSEPH PASATUROprogress
06/06/2024Footing and FoundationJOSEPH PASATUROprogress
06/06/2024Structural Wood FrameJOSEPH PASATUROprogress
06/06/2024Interior lighting powerJOSEPH PASATUROenergy_progress
06/06/2024Fenestration air leakageJOSEPH PASATUROenergy_progress
06/06/2024Permanent certificateJOSEPH PASATUROenergy_progress
06/06/2024Insulation placement and R valuesJOSEPH PASATUROenergy_progress
06/06/2024Electric vehicle service equipment requirementsJOSEPH PASATUROenergy_progress
06/06/2024Maintenance informationJOSEPH PASATUROenergy_progress
06/06/2024MeteringJOSEPH PASATUROenergy_progress
06/06/2024HVAC-R and service water piping design and insulationJOSEPH PASATUROenergy_progress
06/06/2024Fenestration areasJOSEPH PASATUROenergy_progress
06/06/2024Fenestration and door U-factor and product ratingsJOSEPH PASATUROenergy_progress
06/06/2024Air barrier — testing JOSEPH PASATUROenergy_progress
05/20/2024Concrete - Cast-In-PlaceJOSEPH PASATUROspecial
05/20/2024Excavations - Sheeting, Shoring, and BracingJOSEPH PASATUROspecial
05/20/2024Fire-Resistant Penetrations and JointsJOSEPH PASATUROspecial
Latest 25 of 66.
▾Documents — 93 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/25/2026S00587553-I1Request digital key ↗
08/25/2026S00587553-P1Request digital key ↗
08/25/2026S00587572-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026S00579176-P2Open ↗
08/13/2026S00579176-P1Open ↗
08/13/2026S00579176-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00579176-I1Open ↗
▸Seals & Professional Certifications52
▸DOB NOWProgress Inspector Seal & Signature32
08/31/2026S00579176-P2Open ↗
08/31/2026S00579176-P2Open ↗
08/31/2026S00579176-P2Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
08/31/2026S00579176-P2Open ↗
08/31/2026S00579176-P2Open ↗
08/31/2026S00579176-P2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/25/2026S00587553-I1Open ↗
08/25/2026S00587572-I1Open ↗
08/21/2026S00579176-P1Open ↗
Showing 3 of 8 on file for this type
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026S00579176-P3Open ↗
08/13/2026S00579176-P1Open ↗
08/13/2026S00579176-P2Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist4
08/13/2026S00579176-P2Open ↗
08/13/2026S00579176-P3Open ↗
08/13/2026S00579176-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026S00579176-I1Open ↗
▸Inspections & Test Reports7
▸DOB NOWSOIL REPORT5
08/13/2026S00579176-P2Open ↗
08/13/2026S00579176-P3Open ↗
08/13/2026S01143752-S2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00579176-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026S00579176-I1Open ↗
▸Other Documents12
▸DOB NOWProperty Ownership Certification4
08/21/2026S00579176-P1Open ↗
08/21/2026S00579176-P2Open ↗
08/21/2026S00579176-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026S00579176-I1Open ↗
08/13/2026S00579176-P2Open ↗
08/13/2026S00579176-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial3
08/13/2026S00579176-I1Open ↗
08/13/2026S00579176-P2Open ↗
08/13/2026S00579176-P3Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00579176-I1Open ↗