52-24 99TH STREET
QUEENS · Corona · BIN 4441880
💬 Discuss this project
0Year Built
—Stories
U2Building Class
M1-1Zoning
0 sfGross Floor Area
0Units
2 Active Violations 0 unresolved · 2 paperwork only ▸FDNY Report ↗
Gas or electric utility · Owner of record: Con Edison · 333,451 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Consolidated Edison12p · 3 filings · 17 docs
Site & exteriorConsolidated Edison43p · 5 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Consolidated Edison Company of New York8207/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHA204/24/2025
RLM Engineering103/12/2025
McLaren Engineering Group305/13/2024
Hansen Engineering109/20/2022
Consolidated Edison Company of New York201/20/2022
Bga112/29/2021
Langan Engineering110/09/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Consolidated Edison Company of New York803/21/2026
JMV Associates203/21/2026
RPO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Eberhart Construction CoGeneral Contractor1207/08/2026
Posillico CivilGeneral Contractor307/08/2026
T. Moriarty & SonGeneral Contractor203/21/2026
New York Plumbing-Heating-CoolFire Protection207/08/2026
M & S Buildings ServicesFire Protection107/08/2026
New York Plumbing-Heating-CoolingPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tectonic Engineering Cons1061104/24/2025
Building Lifecycle
All (95)Filed (11)Permit Issued (14)Signed Off (5)Violation (8)Inspection (11)Objection (16)Special Inspection (30)
07/16/2025
Signed off — Alteration
This project is for the security upgrades proposed at Con Edison's corona substation to support new fencing, new concrete pads for various equipment, etc. A PAA is being initiated - insp removals - see comments section below.
Q00810727-I1
05/21/2025
Special inspection requirement — Footing and Foundation
GEORGE GHEBRYAL
05/21/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
GEORGE GHEBRYAL
05/21/2025
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
05/21/2025
Special inspection requirement — Final
GEORGE GHEBRYAL
05/01/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/25/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/25/2025
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
04/24/2025
Filed — Alteration
This project is for the security upgrades proposed at Con Edison's corona substation to support new fencing, new concrete pads for various equipment, etc. A PAA is being initiated - insp removals - see comments section below.
Q00810727-P1
04/23/2025
Permit issued — Sprinklers
Q01179899-I1-EW-SP
04/08/2025
Objection resolved — Addressed
04/08/2025
Objection resolved — Addressed
04/08/2025
Objection resolved — Addressed
04/08/2025
Objection resolved — Addressed
04/08/2025
Objection resolved — Addressed
03/21/2025
Objection raised — Fire_Protection
03/21/2025
Objection raised — Fire_Protection
03/21/2025
Objection raised — Fire_Protection
03/21/2025
Objection raised — Fire_Protection
03/21/2025
Objection raised — Fire_Protection
03/12/2025
Filed — Alteration
Modification to existing sprinkler system to offer protection to con edison transformer by adding additional 64 nozzles OSP as per plans filed herewith.
Q01179899-I1
02/11/2025
Special inspection requirement — Sprinkler Systems
GEORGE GHEBRYAL
12/10/2024
Signed off — Alteration
Installation of deluge system in association with the transformer #7 replacement @ Con Edison's Corona Substation. Drawings depicting work as follows: T-386.00, SP-387.00, SP-388.00, SP-389.00, M-250.00.
Q00654134-I1
08/19/2024
Signed off — Alteration
MAKE REPAIRS TO CON EDISON'S TRANSFORMER T7 AT THE CORONA SUBSTATION: REPAIR FOUNDATION; PERFORM SPILL PREVENTION CONTROL & COUNTER-MEASURE UPGRADES; INSTALL SUPPORT FOR NEW EQUIPMENT; INSTALL FIREWALL TO PROVIDE EQUIPMENT SEPARATION.
Q00658341-I1
06/10/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
GEORGE GHEBRYAL
06/10/2024
Special inspection requirement — Helical Piles Foundation (BB # 2014-020)
GEORGE GHEBRYAL
06/10/2024
Special inspection requirement — Structural Steel - Details
GEORGE GHEBRYAL
06/10/2024
Special inspection requirement — Structural Steel - High Strength Bolting
GEORGE GHEBRYAL
06/10/2024
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
06/10/2024
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
06/10/2024
Special inspection requirement — Structural Steel - Welding
GEORGE GHEBRYAL
06/10/2024
Special inspection requirement — Final
GEORGE GHEBRYAL
06/10/2024
Special inspection requirement — Footing and Foundation
GEORGE GHEBRYAL
06/05/2024
Objection resolved — Addressed
05/17/2024
Objection raised — Other
05/13/2024
Filed — Alteration
MAKE REPAIRS TO CON EDISON'S TRANSFORMER T7 AT THE CORONA SUBSTATION: REPAIR FOUNDATION; PERFORM SPILL PREVENTION CONTROL & COUNTER-MEASURE UPGRADES; INSTALL SUPPORT FOR NEW EQUIPMENT; INSTALL FIREWALL TO PROVIDE EQUIPMENT SEPARATION.
Q00658341-P2
04/15/2024
Special inspection requirement — Helical Piles Foundation (BB # 2014-020)
GEORGE GHEBRYAL
04/12/2024
Special inspection requirement — Footing and Foundation
GEORGE GHEBRYAL
04/12/2024
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
04/12/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
GEORGE GHEBRYAL
04/12/2024
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
04/12/2024
Special inspection requirement — Structural Steel - Details
GEORGE GHEBRYAL
04/12/2024
Special inspection requirement — Structural Steel - High Strength Bolting
GEORGE GHEBRYAL
04/12/2024
Special inspection requirement — Structural Steel - Welding
GEORGE GHEBRYAL
04/12/2024
Special inspection requirement — Final
GEORGE GHEBRYAL
03/04/2024
Permit issued — Structural
Q00810727-I1-GC-CX
01/26/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/22/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/22/2024
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
01/11/2024
Permit issued — Sprinklers
Q00654134-I1-EW-SP
08/31/2023
Filed — Alteration
MAKE REPAIRS TO CON EDISON'S TRANSFORMER T7 AT THE CORONA SUBSTATION: REPAIR FOUNDATION; PERFORM SPILL PREVENTION CONTROL & COUNTER-MEASURE UPGRADES; INSTALL SUPPORT FOR NEW EQUIPMENT; INSTALL FIREWALL TO PROVIDE EQUIPMENT SEPARATION.
Q00658341-P1
05/04/2023
Signed off — Alteration
Installation of deluge system in association with Con Edison's transformer #9 replacement. There will be 83 sprinkler nozzles being installed in this new deluge system with associated piping, etc.
Q00530388-I1
03/07/2023
Permit issued — Structural
Q00649214-I1-GC-CX
03/01/2023
Objection raised — Scope
03/01/2023
Objection resolved — Addressed
02/27/2023
Filed — Alteration
This project is for the security upgrades proposed at Con Edison's corona substation to support new fencing, new concrete pads for various equipment, etc. A PAA is being initiated - insp removals - see comments section below.
Q00810727-I1
01/19/2023
Permit issued — General Construction
Q00658341-I1-GC-CX
12/06/2022
Permit issued — Support of Excavation
Q08004416-I1-SE
12/06/2022
Permit issued — Structural
Q00658341-I1-GC-CX
11/04/2022
Permit issued — Support of Excavation
Q08004416-I1-SE
Latest 60 of 95 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedNew York Plumbing-Heating-Cooling04/23/2025
DOB NOWStructuralSigned-offT. Moriarty & Son03/04/2024
DOB NOWSprinklersSigned-offNew York Plumbing-Heating-Cool01/11/2024
DOB NOWStructuralPermit IssuedEberhart Construction Co03/07/2023
DOB NOWGeneral ConstructionSigned-offEberhart Construction Co01/19/2023
DOB NOWSupport of ExcavationPermit IssuedEberhart Construction Co12/06/2022
DOB NOWStructuralSigned-offEberhart Construction Co12/06/2022
DOB NOWSupport of ExcavationPermit IssuedEberhart Construction Co11/04/2022
DOB NOWStructuralSigned-offEberhart Construction Co04/28/2022
DOB NOWSprinklersSigned-offNew York Plumbing-Heating-Cool03/19/2022
DOB NOWStructuralPermit IssuedEberhart Construction Co03/15/2022
DOB NOWSprinklersSigned-offM & S Buildings Services11/30/2021
DOB NOWStructuralSigned-offPosillico Civil03/29/2021
DOB NOWStructuralSigned-offPosillico Civil10/15/2020
BISOTISSUEDO'Leary Construction10/18/2021
BISOTISSUEDPosillico Civil03/29/2021
BISOTISSUEDPosillico Civil10/30/2020
BISFPISSUEDUnited Fire Protection06/03/2019
BISOTISSUEDCon Edison Company01/30/2019
BISOTISSUEDCon Edison Company01/30/2019
BISOTISSUEDCon Edison Company10/23/2018
BISOTISSUEDCon Edison Company10/23/2018
BISOTISSUEDCon Edison Company10/31/2017
BISOTISSUEDCon Edison Company10/31/2017
BISEQISSUEDEberhart Construction Co07/25/2017
BISOTISSUEDEberhart Construction Co07/25/2017
BISOTISSUEDCon Edison Company04/10/2017
BISOTISSUEDCon Edison Company04/10/2017
BISOTISSUEDEberhart Construction Co05/08/2015
BISOTISSUEDCon Edison Company10/31/2014
BISOTISSUEDCon Edison Company10/31/2014
BISMHISSUEDCon Edison Company04/16/2014
BISOTISSUEDCon Edison Company03/28/2014
BISOTISSUEDCon Edison Company03/28/2014
BISOTISSUEDEberhart Construction Co12/11/2013
BISOTISSUEDEberhart Construction Co07/28/2009
BISOTISSUEDEberhart Construction Co05/03/2007
BISOTISSUEDCKR Construction02/01/2006
BISOTISSUEDCKR Construction11/09/2005
BISFSISSUEDUnflat & Associates02/17/2005
1 project · most recent 03/12/2025
FiledStatusContractorScope
03/12/2025——64 heads
1 project · most recent 03/12/2025
FiledStatusContractorScope
03/12/2025Permit IssuedNew York Plumbing-Heating-Cooling—
1 project · most recent 09/20/2022
FiledStatusContractorScope
09/20/2022Permit IssuedEberhart Construction Co1 scope_items
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
05/01/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/25/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/25/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
01/26/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/22/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/22/2024Certified Sprinkler - SP - RoughingCertifiedView ↗
09/09/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/07/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/07/2022Certified Sprinkler - SP - RoughingCertifiedView ↗
12/07/2021Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/07/2021Certified Sprinkler-SP-Piping Dry/Wet-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
05/21/2025Footing and FoundationGEORGE GHEBRYALprogress
05/21/2025Subsurface Conditions – Fill Placement & In-Place DensityGEORGE GHEBRYALspecial
05/21/2025Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
05/21/2025FinalGEORGE GHEBRYALprogress
02/11/2025Sprinkler SystemsGEORGE GHEBRYALspecial
06/10/2024Excavations - Sheeting, Shoring, and BracingGEORGE GHEBRYALspecial
06/10/2024Helical Piles Foundation (BB # 2014-020)GEORGE GHEBRYALspecial
06/10/2024Structural Steel - DetailsGEORGE GHEBRYALspecial
06/10/2024Structural Steel - High Strength BoltingGEORGE GHEBRYALspecial
06/10/2024Post-installed AnchorsGEORGE GHEBRYALspecial
06/10/2024Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
06/10/2024Structural Steel - WeldingGEORGE GHEBRYALspecial
06/10/2024FinalGEORGE GHEBRYALprogress
06/10/2024Footing and FoundationGEORGE GHEBRYALprogress
04/15/2024Helical Piles Foundation (BB # 2014-020)GEORGE GHEBRYALspecial
04/12/2024Footing and FoundationGEORGE GHEBRYALprogress
04/12/2024Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
04/12/2024Excavations - Sheeting, Shoring, and BracingGEORGE GHEBRYALspecial
04/12/2024Post-installed AnchorsGEORGE GHEBRYALspecial
04/12/2024Structural Steel - DetailsGEORGE GHEBRYALspecial
04/12/2024Structural Steel - High Strength BoltingGEORGE GHEBRYALspecial
04/12/2024Structural Steel - WeldingGEORGE GHEBRYALspecial
04/12/2024FinalGEORGE GHEBRYALprogress
09/15/2022Excavations - Sheeting, Shoring, and BracingGEORGE GHEBRYALspecial
09/15/2022Structural Steel - DetailsGEORGE GHEBRYALspecial
Latest 25 of 41.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Consolidated EdisonIndustrial / WarehouseEntire building
Project Q01179899 Alteration · Permit Entire · 03/12/2025
Project Q00810727 Alteration · LOC Issued · 02/27/2023
Project Q08004416 Alteration · Permit Entire · 09/20/2022
Project Q00658341 Alteration · LOC Issued · 02/14/2022
Project Q00654134 Alteration · LOC Issued · 01/20/2022
Project Q00649214 Alteration · Permit Entire · 12/29/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 233 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch10
08/27/2026Q00530388-I1Request digital key ↗
08/26/2026Q00649214-I1Request digital key ↗
08/26/2026Q00654134-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Structural1
08/27/2026Q00402243-I1Request digital key ↗
▸Applications & Permits48
▸BISPLAN / WORK APPROVAL APPLICATION25
06/30/2022420947257Open ↗
06/30/2022420932003Open ↗
06/23/2022420947257Open ↗
Showing 3 of 25 on file for this type
▸BISWORK PERMIT APPLICATION22
10/21/2021440662837Open ↗
10/30/2020440637090Open ↗
06/13/2019421582914Open ↗
Showing 3 of 22 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
03/05/2015440203824Open ↗
▸Seals & Professional Certifications77
▸DOB NOWSpecial Inspector Seal & Signature32
09/23/2026Q01179899-I1Open ↗
09/01/2026Q00649214-I1Open ↗
09/01/2026Q00649214-I1Open ↗
Showing 3 of 32 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION14
01/18/2018420947257Open ↗
01/12/2018420932003Open ↗
07/27/2017440402182Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/27/2026Q00402243-I1Open ↗
08/27/2026Q00530388-I1Open ↗
08/25/2026Q00810727-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026Q00649214-I1Open ↗
09/01/2026Q00649214-I1Open ↗
08/28/2026Q00654134-I1Open ↗
Showing 3 of 9 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
03/03/2021440662837Open ↗
05/18/2017440402182Open ↗
03/05/2015440203824Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
10/15/2020440637090Open ↗
04/23/2014420969893Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
04/23/2014420969893Open ↗
06/10/2010420199458Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
03/08/2021440662837Open ↗
10/15/2020440637090Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
06/10/2010420199458Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/15/2020440637090Open ↗
▸Trade Schedules & Equipment6
▸BISSELF-CERT PLUMBING NOTICE3
06/07/2011420199458Open ↗
06/07/2011420199458Open ↗
09/09/2010420199458Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION1
05/18/2017440402182Open ↗
▸BISSCHEDULE B - PLUMBING1
06/10/2010420199458Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
10/19/2010420199458Open ↗
▸Safety & Tenant Protection1
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
11/01/2021440637090Open ↗
▸Environmental & Asbestos18
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/27/2026Q00402243-I1Open ↗
08/27/2026Q00530388-I1Open ↗
08/25/2026Q00810727-P1Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
04/23/2014420969893Open ↗
12/30/2013420932003Open ↗
03/16/2009410233395Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
03/08/2021440662837Open ↗
10/15/2020440637090Open ↗
09/17/2013420895035Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
06/10/2010420199458Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
05/18/2017440402182Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
05/09/2015440203824Open ↗
04/23/2014420969893Open ↗
11/06/2013420895035Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
03/08/2021440662837Open ↗
03/08/2021440662837Open ↗
05/18/2017440402182Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
03/08/2021440662837Open ↗
▸Inspections & Test Reports20
▸BISTECHNICAL REPORT: RESPONSIBILITY10
07/25/2022420947257Open ↗
07/25/2022420932003Open ↗
05/27/2022420932003Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER6
10/21/2021440662837Open ↗
10/04/2021440662837Open ↗
03/08/2021440662837Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX4
11/04/2021440662837Open ↗
07/26/2017440402182Open ↗
05/15/2015440203824Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs10
▸BISADMINISTRATIVE OBJECTIONS5
04/23/2014420969893Open ↗
02/28/2014420947257Open ↗
12/30/2013420932003Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
12/17/2013420895035Open ↗
12/17/2013420895035Open ↗
12/17/2013420895035Open ↗
▸BISFINAL1
11/01/2021440637090Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
11/03/2021440637090Open ↗
▸Cost, Insurance & Ownership13
▸BISCOST AFFIDAVIT12
03/08/2021440662837Open ↗
10/15/2020440637090Open ↗
11/05/2018421582905Open ↗
Showing 3 of 12 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
11/01/2021440637090Open ↗
▸Filing & Intake Forms19
▸BISEFILING COVER SHEET8
11/05/2018421582905Open ↗
11/05/2018421582914Open ↗
04/23/2014420969893Open ↗
Showing 3 of 8 on file for this type
▸BISADDITIONAL INFORMATION7
07/25/2022420947257Open ↗
07/25/2022420932003Open ↗
01/18/2018420947257Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
03/03/2021440662837Open ↗
10/15/2020440637090Open ↗
05/18/2017440402182Open ↗
Showing 3 of 4 on file for this type
▸Other Documents3
▸BISDRY PIPE VALVE TEST : FP-101
10/19/2010420199458Open ↗
▸DOB NOWTR5H Test Report1
08/13/2026Q00658341-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q08004416-I1Open ↗