← Back
Two stories - detached, small or mid-size
52 COVINGTON CIRCLE
STATEN ISLAND · Arden Heights-Rossville · BIN 5130998
💬 Discuss this project
1999Year Built
2Stories
A1Building Class
R3XZoning
—Gross Floor Area
1Units
Two stories - detached, small or mid-size · 0.47 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR111/04/2025
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281111/04/2025
Building Lifecycle
All (10)Filed (1)Permit Issued (1)Signed Off (1)Objection (2)Special Inspection (5)
03/26/2026
Signed off — Alteration
Installation of solar panels, rooftop, grid tied, railed, 22 modules, 9.02 KW
S01313789-I1
12/16/2025
Permit issued — Solar
S01313789-I1-SL
12/08/2025
Objection resolved — Addressed
11/17/2025
Objection raised — Structural
11/04/2025
Filed — Alteration
Installation of solar panels, rooftop, grid tied, railed, 22 modules, 9.02 KW
S01313789-I1
11/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
11/04/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
11/04/2025
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
11/04/2025
Special inspection requirement — Final
Mina Makar
11/04/2025
Special inspection requirement — Air barrier - visual inspection
Mina Makar
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR12/16/2025
BIS—ISSUEDDORA HOMES, INC05/02/2001
BISPLISSUEDJ.P. COURY, INC.02/25/2000
BIS—ISSUEDDORA HOMES, INC09/20/1999
BIS—ISSUEDDORA HOMES, INC12/21/1998
1 project · most recent 11/04/2025
FiledStatusContractorScope
11/04/2025CompleteISLAND ELECTRIC CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
11/04/2025Fire-Resistant Penetrations and JointsMina Makarspecial
11/04/2025Structural Stability – Alterations of existing buildingsMina Makarspecial
11/04/2025Energy Code Compliance InspectionsMina Makarprogress
11/04/2025FinalMina Makarprogress
11/04/2025Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/18/2026S01313789-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/28/2026S01313789-I1Open ↗
08/28/2026S01313789-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026S01313789-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/28/2026S01313789-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026S01313789-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/18/2026S01313789-I1Open ↗