ECB06/14/2025AT TIME OF INSPECTION, I OBSERVED NO VIEWING PANEL INSTALL TO JOB SITE FENCE AT EXPOSURE #1.$5K due
ECB03/14/2025OBSERVED SITE HAS REMOVE REAR WALL AT GROUND LEVEL AT EXP 3 WHILE UNDER A PSWO THAT WAS ISSUED ON 12/10/24 UNDER COMPLIANT #3987160 VIO# 39535048N. PARTIAL RESCIND WAS ISSUED AND ALLOWED ONLY TO DO HOUSEKEEPING$25K due
DOB03/13/2025FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED REAR MASONRY WALL IN A STATE OF DISREPAIR. MASONRY MISSING AND TEMPORARY SHORING INADEQUATE. WALL APPEARS TO BE SETTLING AND SEPARATING ABOVE 1ST FLOOR WINDOW.
ECB03/13/2025AT REAR OF BUILDING,MASONRY WALL IN A STATE OF DISREPAIR WITH MISSING MASONRY AND INADEQUATE SHORING AND STABILITY., MAINTAIN EXTERIOR BUILDING WALL$25K due
ECB12/11/20243 STORY BUILDING UNDER GOING RENOVATION OBSERVED SISTERING OF WOOD JOIST AT SEVERAL LOCATIONS THROUGHOUT THE BUILDING. NO INDICATION ON APPROVE DOCUMENTS PROVIDED AT TIME OF INSPECTION. STOP ALL WORK UNDER JOB$12K due
ECB07/17/2023WORK WITH OUT A PERMIT, WORK NOTED THE BUILDING INTERIOR GUT RENOVATION. NEW BRICK WORK ALONG EXPOSURE 2 WALL. NEW METAL STUD FRAMING, THE REAR WALL IS OPEN., OBTAIN PERMIT$2K due
DOB10/14/2022REPAIR SIDEWALK SHED IN ORDER TO SAFEGUARD THE PUBLIC AND PROPERTY
DOB03/02/2022FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB03/02/2022FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB12/01/2021BC3307.6.4.6 FAILURE TO MAINTAIN PARAPET WALL FOR SIDEWALK SHED.NOTE: INSPECTION OF 3 STORY BUILDING NO ACTIVE CONSTRUCTION WORK OBSERVED SWS AT EXP #1 UNSAFE AS PARAPET WALL IS LOOSE AND LEANING TOWARDS STREET$12K due
ECB12/01/2021BC3307.6.3 PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATIONS(5' EXTENSION FOR ADJACENT BUILDING)NOTE:INSPECTION OF 3 STORY BUILDING NO ACTIVE CONSTRUCTION WORK OBSERVED SIDEWALK SHED AT EXP #1 DOES NOT ME$12K due
ECB08/06/2019FAILURE TO OBTAIN A TEMPORARY CONSTRUCTION PERMIT PRIOR TO INSTALLATION/USE OF SIDEWALK SHED. AT TIME OF MY INSPECTION ON A 3 STY BLDG I OBSERVED THE SIDEWALK SHED IN PLACE W/NO PERMIT ON FILE AFTER CHECKING$6K due
DOB09/25/2013FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
HPD06/11/2001SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE LOOSE AND CRACK VERTICAL EXTERIOR MASONARY FRAME CASING AT 3RD STY AT FRONT AREAWAY
ECB07/19/2023A VIOLATION & PSWO WAS ISSUED & POSTED ON 07-16-23 FOR WWP IN THE GUT RENOVATION ON THE INTERIOR OF THE BUILDING, ATI SEVERAL WORKERS WERE OBSERVED WORKING ON THE PROPERTY CONTINUING IN THE GUT RENOVATION WHILEHearing held — result not yet published$25K proposed
ECB07/03/2013FAILURE TO MAINTAIN BLDG WALLS OR APPURTENANCES. NOTED: 3 STORY BROWNSTONE AT EXPOSURE 1 (FACADE) STUCCO FINISH HAS CRACKS & PARTS OF WALL HAVE DETACHED & FALLEN. AT 3RD FL ORNAMENTAL STONE ABOVE WINDOW HASNothing owed — awaiting certificate of correction