Two family frame
52 TWOMBLY AVENUE
STATEN ISLAND · BIN 5064095
💬 Discuss this project
2023Year Built
2Stories
B2Building Class
R3XZoning
2,675 sfGross Floor Area
2Units
Two family frame · 5,000 sf lot · 0.54 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 213p · 1 filing · 20 docs
Floor 110p · 1 filing · 20 docs
Cellar10p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHRIS PONISI, ARCHITECT804/21/2023
WILLIAM MONTAGUE ENGINEER102/21/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DAWN PONISI603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A.E.H BUILDERS CORPGeneral Contractor407/08/2026
JB BUZCO PLUMBING LLCPlumbing107/08/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738704/21/2023
Building Lifecycle
All (60)Filed (9)Permit Issued (6)Signed Off (4)Inspection (11)Special Inspection (30)
05/12/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/25/2023
Special inspection requirement — Air barrier — testing
anthony santoro
04/25/2023
Special inspection requirement — Subgrade Inspections
anthony santoro
04/25/2023
Special inspection requirement — Permanent certificate
anthony santoro
04/25/2023
Special inspection requirement — Interior lighting power
anthony santoro
04/25/2023
Special inspection requirement — Structural Steel - Details
anthony santoro
04/25/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
anthony santoro
04/25/2023
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
04/25/2023
Special inspection requirement — Structural Wood Frame
anthony santoro
04/25/2023
Special inspection requirement — Maintenance information
anthony santoro
04/25/2023
Special inspection requirement — Fenestration areas
anthony santoro
04/25/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
04/25/2023
Special inspection requirement — Air barrier - visual inspection
anthony santoro
04/25/2023
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
04/25/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
04/25/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
04/25/2023
Special inspection requirement — Final
anthony santoro
04/25/2023
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
04/25/2023
Special inspection requirement — Footing and Foundation
anthony santoro
04/25/2023
Special inspection requirement — Insulation placement and R values
anthony santoro
04/25/2023
Special inspection requirement — Protection of exposed foundation insulation
anthony santoro
04/25/2023
Special inspection requirement — Electric vehicle service equipment requirements
anthony santoro
04/25/2023
Special inspection requirement — Metering
anthony santoro
04/25/2023
Special inspection requirement — Fenestration air leakage
anthony santoro
04/25/2023
Special inspection requirement — Wood – Prefabricated I-Joists
anthony santoro
04/21/2023
Filed — New Building
1)INSTALLATION OF NEW GAS FURNACES WITH DX-COILS AND ASSOCIATED CONDENSER UNITS FOR RESIDENTIAL UNITS WITHIN THE BUILDING. 2)INSTALLATION OF EXHAUST AND ERV SYSTEMS UNITS ARE INSTALLED FOR EACH SYSTEM VENTILATION.
S00774799-P6
04/21/2023
Special inspection requirement — Air barrier — testing
anthony santoro
04/21/2023
Special inspection requirement — Metering
anthony santoro
04/21/2023
Special inspection requirement — Wood – Prefabricated I-Joists
anthony santoro
04/21/2023
Special inspection requirement — Interior lighting power
anthony santoro
04/21/2023
Special inspection requirement — Protection of exposed foundation insulation
anthony santoro
04/21/2023
Special inspection requirement — Structural Wood Frame
anthony santoro
04/04/2023
Signed off — New Building
1)INSTALLATION OF NEW GAS FURNACES WITH DX-COILS AND ASSOCIATED CONDENSER UNITS FOR RESIDENTIAL UNITS WITHIN THE BUILDING. 2)INSTALLATION OF EXHAUST AND ERV SYSTEMS UNITS ARE INSTALLED FOR EACH SYSTEM VENTILATION.
S00774799-S1
03/28/2023
Filed — New Building
1)INSTALLATION OF NEW GAS FURNACES WITH DX-COILS AND ASSOCIATED CONDENSER UNITS FOR RESIDENTIAL UNITS WITHIN THE BUILDING. 2)INSTALLATION OF EXHAUST AND ERV SYSTEMS UNITS ARE INSTALLED FOR EACH SYSTEM VENTILATION.
S00774799-P5
03/20/2023
Signed off — New Building
1)INSTALLATION OF NEW GAS FURNACES WITH DX-COILS AND ASSOCIATED CONDENSER UNITS FOR RESIDENTIAL UNITS WITHIN THE BUILDING. 2)INSTALLATION OF EXHAUST AND ERV SYSTEMS UNITS ARE INSTALLED FOR EACH SYSTEM VENTILATION.
S00774799-S2
03/07/2023
Signed off — Alteration
S00830762-I1
03/04/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
02/28/2023
Permit issued — Mechanical Systems
S00774799-S1-MS
02/28/2023
Permit issued — Curb Cut
S00830762-I1-CC
02/24/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/21/2023
Filed — Alteration
S00830762-I1
02/20/2023
Filed — New Building
1)INSTALLATION OF NEW GAS FURNACES WITH DX-COILS AND ASSOCIATED CONDENSER UNITS FOR RESIDENTIAL UNITS WITHIN THE BUILDING. 2)INSTALLATION OF EXHAUST AND ERV SYSTEMS UNITS ARE INSTALLED FOR EACH SYSTEM VENTILATION.
S00774799-P3
02/20/2023
Filed — New Building
1)INSTALLATION OF NEW GAS FURNACES WITH DX-COILS AND ASSOCIATED CONDENSER UNITS FOR RESIDENTIAL UNITS WITHIN THE BUILDING. 2)INSTALLATION OF EXHAUST AND ERV SYSTEMS UNITS ARE INSTALLED FOR EACH SYSTEM VENTILATION.
S00774799-P4
02/02/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/18/2023
Signed off — Alteration
S00739971-I1
11/09/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/09/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/26/2022
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
10/20/2022
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
10/19/2022
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
10/13/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/07/2022
Permit issued — Plumbing
S76224401-S2-PL
10/04/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/23/2022
Permit issued — Plumbing
S00774799-S2-PL
09/06/2022
Permit issued — General Construction
S00774799-I1-GC-CX
08/19/2022
Filed — New Building
1)INSTALLATION OF NEW GAS FURNACES WITH DX-COILS AND ASSOCIATED CONDENSER UNITS FOR RESIDENTIAL UNITS WITHIN THE BUILDING. 2)INSTALLATION OF EXHAUST AND ERV SYSTEMS UNITS ARE INSTALLED FOR EACH SYSTEM VENTILATION.
S00774799-S2
08/18/2022
Filed — New Building
1)INSTALLATION OF NEW GAS FURNACES WITH DX-COILS AND ASSOCIATED CONDENSER UNITS FOR RESIDENTIAL UNITS WITHIN THE BUILDING. 2)INSTALLATION OF EXHAUST AND ERV SYSTEMS UNITS ARE INSTALLED FOR EACH SYSTEM VENTILATION.
S00774799-S1
07/21/2022
Filed — New Building
1)INSTALLATION OF NEW GAS FURNACES WITH DX-COILS AND ASSOCIATED CONDENSER UNITS FOR RESIDENTIAL UNITS WITHIN THE BUILDING. 2)INSTALLATION OF EXHAUST AND ERV SYSTEMS UNITS ARE INSTALLED FOR EACH SYSTEM VENTILATION.
S00774799-I1
05/20/2022
Permit issued — Construction Fence
S00739971-I1-FN
05/19/2022
Filed — Alteration
S00739971-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offA.E.H BUILDERS CORP02/28/2023
DOB NOWCurb CutSigned-offA.E.H BUILDERS CORP02/28/2023
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC10/07/2022
DOB NOWPlumbingSigned-offJB BUZCO PLUMBING LLC09/23/2022
DOB NOWGeneral ConstructionPermit IssuedA.E.H BUILDERS CORP09/06/2022
DOB NOWConstruction FenceSigned-offA.E.H BUILDERS CORP05/20/2022
BIS—ISSUEDA.E.H BUILDERS CORP06/03/2022
1 project · most recent 04/21/2023
Air Conditioning Systems Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/21/2023Signed-offA.E.H BUILDERS CORPAir Conditioning Systems, Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Goodman RA1336AJ1NA - RA1348AJ1NA 7 tons · Condensing Unit ×2
Heat / Cool
Fujitsu AOU24RLXFZH/ASU9RLF1/ASU18RLF 33,600 BTU · Heat Pump Outdoor ×3
Heating
Goodman R927A0701317MSA & R801CA100521MSA 170,000 BTU · Furnace ×2
Ventilation
Renewaire N/A 75 CFM · Erv ×2
1 project · most recent 01/22/2023
General Wiring
FiledStatusContractorScope
01/22/2023CompleteA. J. CARUSO ELECTRICAL IGeneral Wiring
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
05/12/2023Pass-Final CND-Occupancy InspectionPassView ↗
03/04/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
02/24/2023Pass-Final CND-Occupancy InspectionPassView ↗
02/02/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/09/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/09/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/26/2022Fail-Final CND-Occupancy InspectionFailView ↗
10/20/2022Fail-Final CND-Occupancy InspectionFailView ↗
10/19/2022Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
10/13/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/04/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 92
DateRequirementInspectorRole
04/25/2023Wood – Prefabricated I-Joistsanthony santorospecial
04/25/2023Subgrade Inspectionsanthony santorospecial
04/25/2023Excavations - Sheeting, Shoring, and Bracinganthony santorospecial
04/25/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
04/25/2023Concrete - Cast-In-Placeanthony santorospecial
04/25/2023Structural Steel - Detailsanthony santorospecial
04/25/2023Fire-Resistant Penetrations and Jointsanthony santorospecial
04/25/2023Finalanthony santoroprogress
04/25/2023Energy Code Compliance Inspectionsanthony santoroprogress
04/25/2023Fire-Resistance Rated Constructionanthony santoroprogress
04/25/2023Footing and Foundationanthony santoroprogress
04/25/2023Structural Wood Frameanthony santoroprogress
04/25/2023Permanent certificateanthony santoroenergy_progress
04/25/2023Insulation placement and R valuesanthony santoroenergy_progress
04/25/2023Protection of exposed foundation insulationanthony santoroenergy_progress
04/25/2023Maintenance informationanthony santoroenergy_progress
04/25/2023Electric vehicle service equipment requirementsanthony santoroenergy_progress
04/25/2023Meteringanthony santoroenergy_progress
04/25/2023Fenestration areasanthony santoroenergy_progress
04/25/2023Interior lighting poweranthony santoroenergy_progress
04/25/2023Air barrier — testing anthony santoroenergy_progress
04/25/2023Fenestration air leakageanthony santoroenergy_progress
04/25/2023Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
04/25/2023Air barrier - visual inspectionanthony santoroenergy_progress
04/21/2023Fenestration areasanthony santoroenergy_progress
Latest 25 of 92.
▾Documents — 97 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/24/2026S00739971-I1Request digital key ↗
08/24/2026S00774799-P4Request digital key ↗
08/24/2026S00774799-P5Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
05/12/2022520462927Open ↗
04/08/2022540214365Open ↗
▸BISWORK PERMIT APPLICATION1
06/03/2022520462927Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
04/08/2022540214365Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026S00774799-I1Open ↗
08/13/2026S00774799-P3Open ↗
08/13/2026S00774799-P6Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026S00774799-P3Open ↗
08/13/2026S00774799-I1Open ↗
08/13/2026S00774799-P6Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00774799-I1Open ↗
▸Seals & Professional Certifications29
▸DOB NOWProgress Inspector Seal & Signature10
09/02/2026S00774799-P3Open ↗
09/02/2026S00774799-P3Open ↗
09/01/2026S00774799-P5Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/24/2026S00774799-P3Open ↗
08/24/2026S00774799-I1Open ↗
08/24/2026S00774799-S1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/02/2026S00774799-P3Open ↗
09/02/2026S00774799-P3Open ↗
09/01/2026S00774799-P5Open ↗
Showing 3 of 8 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
04/08/2022540214365Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/08/2022540214365Open ↗
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026S00774799-P3Open ↗
08/13/2026S00774799-P6Open ↗
08/13/2026S00774799-I1Open ↗
▸BISGAS CUT-OFF1
06/03/2022520462927Open ↗
▸BISELECTRIC CUT-OFF1
06/03/2022520462927Open ↗
▸BISSEWER CUT-OFF1
06/03/2022520462927Open ↗
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist3
08/24/2026S00774799-I1Open ↗
08/24/2026S00774799-P3Open ↗
08/24/2026S00774799-P6Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
06/03/2022520462927Open ↗
05/12/2022520462927Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
06/03/2022520462927Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00774799-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00774799-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00774799-I1Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/12/2022520462927Open ↗
▸BISRODENT CONTROL1
06/03/2022520462927Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026S00774799-I1Open ↗
▸Inspections & Test Reports1
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
04/08/2022540214365Open ↗
▸Approvals, Objections & Sign-offs7
▸BISLETTERS - SUPPORTING DOCUMENTATION2
06/03/2022520462927Open ↗
06/03/2022520462927Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM1
06/03/2022520462927Open ↗
▸BISLANDMARKS APPROVAL1
06/03/2022520462927Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
05/12/2022520462927Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
04/08/2022540214365Open ↗
▸BISOIL TANK REMOVAL CERT : LETTER-FO1
06/03/2022520462927Open ↗
▸Cost, Insurance & Ownership2
▸BISPROJECT-SPECIFIC GL INSURANCE1
06/03/2022520462927Open ↗
▸BISWC-DB-100 (Replaces Form C-105-21)Affidavit for NY Entities And Any Out of State Entities with no employees1
06/03/2022520462927Open ↗
▸Filing & Intake Forms4
▸BISBOROUGH INTAKE FORM2
06/03/2022520462927Open ↗
05/12/2022520462927Open ↗
▸BISEFILING COVER SHEET1
05/12/2022520462927Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
04/08/2022540214365Open ↗
▸Other Documents16
▸DOB NOWSite Survey: Initial3
08/13/2026S00774799-P3Open ↗
08/13/2026S00774799-I1Open ↗
08/13/2026S00774799-P6Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026S00774799-I1Open ↗
08/13/2026S00774799-P6Open ↗
08/13/2026S00774799-P3Open ↗
▸DOB NOWProperty Ownership Certification3
08/24/2026S00774799-I1Open ↗
08/24/2026S00774799-P3Open ↗
08/24/2026S00774799-P6Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
06/03/2022520462927Open ↗
06/03/2022520462927Open ↗
▸BISCOMMUNITY BOARD NOTIFICATION2
06/03/2022520462927Open ↗
06/03/2022520462927Open ↗
▸BISWAIVER OF CURB ALIGNMENT1
04/15/2022540214365Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
04/08/2022540214365Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00774799-I1Open ↗