RoofUnder Construction8p · 8 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods
Remove Gas Water Heaters & Associated Piping, Replace Gas Piping & Shut-off Valves Within Boiler Rm. For Replacement of Boilers & Connect to Existing Piping After Existing Gas Shut-off Valve & Meter, Install Non-Gas Indirect Water Heater(Cont. in Comments
On file for this project
25 documents
Replace Existing Gas Fired Low Pressure Hot Water Heating Modular Boilers & Integral Fuel Burners With (5) Gas Fired Low Pressure Hot Water Heating Conventional Boilers & Integral Fuel Burners in Existing Boiler Room on 2nd Floor Roof (Cont. in Comments)
On file for this project
56 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY ROOF PROTECTION SYSTEM AS PER PLANS DURING ADJACENT NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ROOF PROTECTION SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
On file for this project
2 documents
Latest 3 of 8 filings on this floor.
PenthouseUnder Construction1p · 2 filings · 20 docs
Architecture
Issued Permit Scope
General Construction
Filing herewith Mechanical scope to modify the existing system to account for lot line louver relocations. No change to use, egress or occupancy.
On file for this project
15 documents
Facade Repairs
On file for this project
11 documents · 1 drawing sheet
Floor 20Under Construction1 filing · 15 docs
Architecture
Issued Permit Scope
General Construction
Filing herewith Mechanical scope to modify the existing system to account for lot line louver relocations. No change to use, egress or occupancy.
On file for this project
15 documents
Floor 19Under Construction3p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanical
Issued Permit Scope
General Construction
Filing herewith Mechanical scope to modify the existing system to account for lot line louver relocations. No change to use, egress or occupancy.
On file for this project
15 documents
Installation of Partitions, Doors, Millwork, Wall Base & Paint to Construct Two Private Offices on Part of the 19th Floor. No Change to Occupancy, Use or Egress is Proposed
On file for this project
3 documents · 1 drawing sheet
Modifications to Existing Air Conditioning Ductwork, Replace Toilet Exhaust Fans & Install Supplementary Split Air Conditioning System & Associated Piping (IT Room) on 19th Floor and Associated Piping & Wall Mounted Outdoor Condenser on Roof
On file for this project
7 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 18Under Construction1p · 2 filings · 18 docs
ArchitectureZ
Issued Permit Scope
General Construction
Filing herewith Mechanical scope to modify the existing system to account for lot line louver relocations. No change to use, egress or occupancy.
On file for this project
15 documents
No filed description on record for this project.
On file for this project
3 documents · 1 drawing sheet
Floor 17Under Construction1 filing · 15 docs
Architecture
Issued Permit Scope
General Construction
Filing herewith Mechanical scope to modify the existing system to account for lot line louver relocations. No change to use, egress or occupancy.
On file for this project
15 documents
Floor 16Under Construction16p · 2 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Modifications to Existing Sprinkler System on Part of 16th Floor
On file for this project
17 documents · 2 drawing sheets
Filing herewith Mechanical scope to modify the existing system to account for lot line louver relocations. No change to use, egress or occupancy.
On file for this project
15 documents
Floor 15Under Construction1 filing · 15 docs
Architecture
Issued Permit Scope
General Construction
Filing herewith Mechanical scope to modify the existing system to account for lot line louver relocations. No change to use, egress or occupancy.
On file for this project
15 documents
Floor 14Under Construction1 filing · 15 docs
ArchitectureMechanical
Issued Permit Scope
General Construction · Mechanical Systems
Filing herewith Mechanical scope to modify the existing system to account for lot line louver relocations. No change to use, egress or occupancy.
On file for this project
15 documents
Floor 13Under Construction1 filing · 15 docs
Architecture
Issued Permit Scope
General Construction
Filing herewith Mechanical scope to modify the existing system to account for lot line louver relocations. No change to use, egress or occupancy.
On file for this project
15 documents
Floor 12Under Construction1 filing · 15 docs
Architecture
Issued Permit Scope
General Construction
Filing herewith Mechanical scope to modify the existing system to account for lot line louver relocations. No change to use, egress or occupancy.
On file for this project
15 documents
Floor 11Under Construction15p · 2 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Filing herewith Mechanical scope to modify the existing system to account for lot line louver relocations. No change to use, egress or occupancy.
On file for this project
15 documents
Modifications to Existing Sprinkler System on Part of the 11th Floor
On file for this project
11 documents · 8 drawing sheets
Floor 10Under Construction1 filing · 15 docs
Architecture
Issued Permit Scope
General Construction
Filing herewith Mechanical scope to modify the existing system to account for lot line louver relocations. No change to use, egress or occupancy.
On file for this project
15 documents
Floor 9Under Construction1 filing · 15 docs
ArchitectureMechanical
Issued Permit Scope
General Construction · Mechanical Systems
Filing herewith Mechanical scope to modify the existing system to account for lot line louver relocations. No change to use, egress or occupancy.
On file for this project
15 documents
Floor 8Under Construction7p · 3 filings · 20 docs
ArchitectureCivilDMFire ProtectionGeneral
Issued Permit Scope
General Construction
Filing herewith Mechanical scope to modify the existing system to account for lot line louver relocations. No change to use, egress or occupancy.
On file for this project
15 documents
Demolition of Existing Restroom Plumbing Fixtures, Pantry Sink and Associated Piping, Installation of Restroom Plumbing Fixtures, Pantry Sink, Associated Piping & Water Line for Appliances, Install TCSP and Replace Existing Sprinkler System on 8th Floor
On file for this project
5 documents · 1 drawing sheet
Demo. of Partitions, Doors, Ceiling, Millwork, Wall & Floor Finishes and Install Partitions, Doors, Suspended Ceiling, Millwork, Wall & Floor Finishes on 8th Fl. Including Reno. of Exist. Restrooms & Replace(2)Windows.No Change to Occupancy, Use or Egress
On file for this project
9 documents · 6 drawing sheets
Floor 7Under Construction1 filing · 15 docs
Architecture
Issued Permit Scope
General Construction
Filing herewith Mechanical scope to modify the existing system to account for lot line louver relocations. No change to use, egress or occupancy.
On file for this project
15 documents
Floor 6Under Construction16p · 4 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction
Filing herewith Mechanical scope to modify the existing system to account for lot line louver relocations. No change to use, egress or occupancy.
On file for this project
15 documents
Remove Existing Sprinkler System, Install TCSP & New Sprinkler System, Replace Existing Men's & Women's Restroom Plumbing Fixtures & Piping, Install All Gender ADA Restroom Fixtures & Piping & Pantry Plumbing Fixtures & Piping on 6th Floor
On file for this project
12 documents · 3 drawing sheets
Demolition and Construction of Partitions, Doors, Ceilings, Millwork, Wall & Floor Finishes, Paint Existing Wall Surfaces & Ceiling Slab, Renovate Existing Restrooms & Construct ADA Restroom on 6th Floor. No Change To Occupancy, Use or Egress is Proposed
On file for this project
12 documents · 11 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 5Under Construction1 filing · 15 docs
Architecture
Issued Permit Scope
General Construction
Filing herewith Mechanical scope to modify the existing system to account for lot line louver relocations. No change to use, egress or occupancy.
On file for this project
15 documents
Floor 4Under Construction1p · 2 filings · 19 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
Filing herewith Mechanical scope to modify the existing system to account for lot line louver relocations. No change to use, egress or occupancy.
On file for this project
15 documents
Installation of Plumbing Fixtures and Modifications to Existing Sprinkler System.
On file for this project
4 documents
Floor 35p · 3 filings · 19 docs
ArchitectureCivilFire ProtectionGeneralPlumbing
Demolition of Existing Plumbing Fixtures, Piping & Sprinkler System and Installation of TCSP. Installation of Plumbing Fixtures, Non-Gas Water Heater, Sump Pump, Piping and Sprinkler System.
On file for this project
10 documents · 2 drawing sheets
Demolition of A/C Units,Piping,Ductwork,Louvers,Exhaust Fans,Outdoor Condensers on Low Roof,Install A/C Units,Piping,Ductwork,Louvers,Exhaust Fans,Outdoor Condensers on Low Roof on Exist. Steel,Replace Steam Radiator Piping,Relocate Exist. A/C Unit on 3Fl
On file for this project
5 documents · 1 drawing sheet
Demolition of Existing Partitions, Doors, Suspended Ceiling, Millwork & Floor Finishes and Installation of Partitions, Doors, Suspended Ceiling, Millwork, Wall & Floor Finishes Including Renovation of Existing Men's & Women's Toilet Rooms.
On file for this project
4 documents · 2 drawing sheets
Floor 25p · 4 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbing
Demolition of Existing Plumbing Fixtures, Piping & Sprinkler System and Installation of TCSP. Installation of Plumbing Fixtures, Non-Gas Water Heater, Sump Pump, Piping and Sprinkler System.
On file for this project
10 documents · 2 drawing sheets
Demolition of A/C Units,Piping,Ductwork,Louvers,Exhaust Fans,Outdoor Condensers on Low Roof,Install A/C Units,Piping,Ductwork,Louvers,Exhaust Fans,Outdoor Condensers on Low Roof on Exist. Steel,Replace Steam Radiator Piping,Relocate Exist. A/C Unit on 3Fl
On file for this project
5 documents · 1 drawing sheet
Demolition of Existing Partitions, Doors, Suspended Ceiling, Millwork & Floor Finishes and Installation of Partitions, Doors, Suspended Ceiling, Millwork, Wall & Floor Finishes Including Renovation of Existing Men's & Women's Toilet Rooms.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 12p · 1 filing · 3 docs
Architecture
No filed description on record for this project.
On file for this project
3 documents · 2 drawing sheets
Mezzanine2p · 2 filings · 6 docs
Architecture
No filed description on record for this project.
On file for this project
3 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
3 documents · 2 drawing sheets
CellarUnder Construction9p · 2 filings · 15 docs
ArchitectureDMFire Protection
Issued Permit Scope
Sprinklers
Modify existing plumbing fixtures and sprinkler system as per plan.
On file for this project
11 documents · 2 drawing sheets
FILING HEREWITH FOR REMOVAL OF EXISTING FLOOR TO RELOCATE EXISTING EGRESS STAIR, FLOORING, AND REFLECTED CEILING PLAN. NO CHANGE IN USE, OCCUPANCY, AND BUILDING ENVELOPE. NYCECC ENERGY COMPLIANCE IS FILED UNDER MECHANICAL M08046994. MPP PROGRAM #30
On file for this project
4 documents · 1 drawing sheet