Condo, residential unit in elevator building
520 West 110 Condominium
520 CATHEDRAL PARKWAY · BIN 1056866
💬 Discuss this project
1911Year Built
12Stories
R4Building Class
R8Zoning
46,657 sfGross Floor Area
36Units
LL97 CoveredRent Stabilized62 Open Violations ▸FISP: SAFE
Condo, residential unit in elevator building · 7,092 sf lot · 6.58 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbingGeneral
Permit Issued — active, not yet Signed-off
Floor 12Under Construction6p · 2 filings · 16 docs
Floor 11
Floor 10
Floor 9
Floor 8
Floor 75p · 2 filings · 20 docs
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 17p · 2 filings · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ARGO REAL ESTATE707/08/2026
520 WEST 110 CONDOMINIUM503/22/2026
520 WEST 110 ST CONDO603/22/2026
OWNER OF 520 W.110 ST.103/22/2026
520 WEST 110 ST103/21/2026
520 W 110TH ST CONDOMINIUM403/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ACA ASSOCIATES103/21/2026
SYNCHRON EXPEDITING603/21/2026
DINA VEDMED ARCHITECT303/21/2026
CODE603/21/2026
Rigid Structural Design, LLC103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
INTERSYSTEM INSTALLATIONGeneral Contractor607/08/2026
PRAT ENTERPRISES CORPGeneral Contractor507/08/2026
NY CONSTRUCTION&STONE INCGeneral Contractor303/21/2026
PRATT CONSTRUCTION & RESTGeneral Contractor303/21/2026
HOME BY ME INCGeneral Contractor303/21/2026
BARGAIN PLUMBING INCPlumbing209/23/2026
WORKSHOP FOR CONSTRUCTIONGeneral Contractor207/08/2026
STIVAN PLBG & HTG INCPlumbing107/08/2026
GERBERT BONHOMMEElectrical103/21/2026
JOHN DICAPUAElectrical103/21/2026
D.D. INTERIORS INCGeneral Contractor104/08/2026
G.P. MECHANICAL CORPPlumbing107/08/2026
DICAPUA, JOHNElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PIRO STUDIO LLC7503204/23/2024
NEW YORK ENGINEERS, P.C.3868201/30/2024
CATALPA SPECIAL INSPECTIO2004301/16/2024
Building Lifecycle
All (147)Filed (15)Permit Issued (17)Signed Off (6)Facade (FISP) (12)Violation (60)Inspection (9)Objection (6)Special Inspection (22)
09/22/2026
Permit issued — Plumbing
M01231969-I1-PL
05/05/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/28/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/23/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/01/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/30/2025
Filed — Alteration
Plumbing work related to the renovation of apartment 12C on the 12th floor.
M01231969-P1
07/18/2025
Permit issued — General Construction
M01231957-I1-GC
07/18/2025
Permit issued — Plumbing
M01231969-I1-PL
06/25/2025
Objection resolved — Addressed
06/20/2025
Objection raised — Scope
06/17/2025
Permit issued — General Construction
M01231957-I1-GC
06/13/2025
Objection resolved — Addressed
06/12/2025
Objection raised — Admin
06/02/2025
Filed — Alteration
Modification to interior partitions along with related general construction related to the renovation of apartment 12C on the 12th floor.
M01231957-I1
06/02/2025
Filed — Alteration
Plumbing work related to the renovation of apartment 12C on the 12th floor.
M01231969-I1
05/28/2025
Special inspection requirement — Final
AUDRA MANZANO
10/30/2024
Signed off — Alteration
The job is combining two apartments into one.
M00883867-I1
10/01/2024
Signed off — Alteration
COMBINATION OF APARTMENTS 7A/7B. INTERIOR RENOVATION. COMBINED APARTMENT WILL COMPLY WITH TPPN 03/97. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M00872895-I1
07/26/2024
Signed off — Alteration
PLUMBING WORK IN APARTMENT #1A IN CONJUNCTION WITH APARTMENT RENOVATION FILED IN DOB NOW UNDER JOB#M00948848. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00949883-I1
07/22/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/19/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/11/2024
Signed off — Alteration
RENOVATE EXISTING APARTMENT; PARTITIONS, FLOORING, CABINETRY, COUNTERS, DOORS, CEILING, FIXTURES & FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00948848-I1
05/28/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/09/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/24/2024
Special inspection requirement — Energy Code Compliance Inspections
Dina Vedmed
04/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIETRO ROSATO
04/23/2024
Filed — Alteration
PLUMBING WORK IN APARTMENT #1A IN CONJUNCTION WITH APARTMENT RENOVATION FILED IN DOB NOW UNDER JOB#M00948848. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00949883-P1
04/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIETRO ROSATO
04/23/2024
Special inspection requirement — Energy Code Compliance Inspections
Dina Vedmed
03/01/2024
Permit issued — Plumbing
M00949883-I1-PL
02/23/2024
Permit issued — General Construction
M00948848-I1-GC
02/09/2024
Permit issued — Mechanical Systems
M00883867-I1-MS
01/30/2024
Filed — Alteration
The job is combining two apartments into one.
M00883867-P1
01/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIC BERLENT
01/24/2024
Special inspection requirement — Fire-Resistance Rated Construction
ERIC BERLENT
01/24/2024
Special inspection requirement — Final
JOHN LEE
01/17/2024
Special inspection requirement — Mechanical Systems
Michael Tobias
01/17/2024
Special inspection requirement — Final
Michael Tobias
01/16/2024
Filed — Alteration
COMBINATION OF APARTMENTS 7A/7B. INTERIOR RENOVATION. COMBINED APARTMENT WILL COMPLY WITH TPPN 03/97. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M00872895-P2
01/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIC BERLENT
01/02/2024
Special inspection requirement — Fire-Resistance Rated Construction
ERIC BERLENT
01/02/2024
Special inspection requirement — Final
JOHN LEE
12/21/2023
Filed — Alteration
PLUMBING WORK IN APARTMENT #1A IN CONJUNCTION WITH APARTMENT RENOVATION FILED IN DOB NOW UNDER JOB#M00948848. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00949883-I1
12/21/2023
Filed — Alteration
RENOVATE EXISTING APARTMENT; PARTITIONS, FLOORING, CABINETRY, COUNTERS, DOORS, CEILING, FIXTURES & FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00948848-I1
12/05/2023
Special inspection requirement — Lighting in dwelling units
Dina Vedmed
11/30/2023
Objection resolved — Addressed
11/29/2023
Objection raised — Scope
11/21/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/15/2023
Violation issued (HPD, closed)
I
11/13/2023
Filed — Alteration
COMBINATION OF APARTMENTS 7A/7B. INTERIOR RENOVATION. COMBINED APARTMENT WILL COMPLY WITH TPPN 03/97. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M00872895-P1
11/09/2023
Special inspection requirement — Fire-Resistance Rated Construction
ERIC BERLENT
11/09/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIC BERLENT
11/08/2023
Special inspection requirement — Energy Code Compliance Inspections
Dina Vedmed
10/16/2023
Special inspection requirement — Final
Dina Vedmed
10/11/2023
Filed — Alteration
The purpose of the job is to combine two apartments into one.
M00883876-P1
10/11/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/11/2023
Special inspection requirement — Post-installed Anchors
10/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/10/2023
Special inspection requirement — Post-installed Anchors
09/01/2023
Cycle 9 facade report submitted
Latest 60 of 147 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedBARGAIN PLUMBING INC09/22/2026
DOB NOWGeneral ConstructionPermit IssuedD.D. INTERIORS INC07/18/2025
DOB NOWPlumbingPermit IssuedBARGAIN PLUMBING INC07/18/2025
DOB NOWGeneral ConstructionPermit IssuedNY CONSTRUCTION&STONE INC06/17/2025
DOB NOWPlumbingSigned-offG.P. MECHANICAL CORP03/01/2024
DOB NOWGeneral ConstructionSigned-offHOME BY ME INC02/23/2024
DOB NOWMechanical SystemsSigned-offWORKSHOP FOR CONSTRUCTION02/09/2024
DOB NOWPlumbingSigned-offSTIVAN PLBG & HTG INC07/18/2023
DOB NOWGeneral ConstructionSigned-offWORKSHOP FOR CONSTRUCTION07/06/2023
DOB NOWGeneral ConstructionSigned-offPRAT ENTERPRISES CORP10/13/2022
DOB NOWSidewalk ShedSigned-offINTERSYSTEM INSTALLATION09/27/2022
DOB NOWSidewalk ShedSigned-offINTERSYSTEM INSTALLATION07/13/2022
DOB NOWGeneral ConstructionSigned-offPRAT ENTERPRISES CORP10/26/2021
DOB NOWGeneral ConstructionSigned-offPRAT ENTERPRISES CORP08/13/2021
DOB NOWSidewalk ShedSigned-offINTERSYSTEM INSTALLATION08/05/2021
DOB NOWGeneral ConstructionSigned-offPRATT CONSTRUCTION & RES*05/06/2021
DOB NOWSidewalk ShedSigned-offINTERSYSTEM INSTALLATION10/23/2020
BISPLISSUEDSKINNER PLUMBING & HEATING02/13/2018
BISOTISSUEDKEPTECH BUILDERS GRP LLC02/01/2018
BISPLISSUEDWTC PLBG & HEATING CORP10/10/2013
BISPLISSUEDWTC PLBG & HEATING CORP10/17/2012
BISPLISSUEDF.S. SITE CORP07/27/2012
BISOTISSUEDTMG CONSTRUCTION CORP07/18/2012
BISOTISSUEDWORKSHOP FOR CONSTRUCTION06/22/2012
BISEQISSUEDPOWERS BRIDGING & SCAFFOLDING09/06/2011
BISOTISSUEDACCURA RESTORATION INC09/06/2011
BISPLISSUEDWTC PLBG & HEATING CORP07/01/2011
BISOTISSUEDACCURA RESTORATION INC06/24/2011
BISOTISSUEDWORKSHOP FOR CONSTRUCTION02/28/2011
BISOTISSUEDZMK GROUP INC04/15/2010
BISPLISSUEDBENT MECHANICAL CORP10/21/2009
BISOTISSUEDH.A.G PLUMB & HTG INC10/21/2009
BISPLISSUEDSAFETY PLMBG & HTG LLC10/14/2008
BISOTISSUEDFINIX U.S.A. CONSTRUCTION10/07/2008
BISPLISSUEDWYNNE PLBG & HEATING CORP03/27/2007
BISOTISSUEDRICHARD ZANGRILLO STUDIOS LLC02/05/2007
BISPLISSUEDA.M.N. CORPORATION12/04/2006
BISOTISSUEDKEY RESTORATION CORP01/02/2003
BISEQISSUEDSPRING ENTERPRIS INC.12/19/2002
BISEQISSUEDSPRING ENTERPRIS INC.11/30/2001
+ 10 more permits on file
2 projects · most recent 10/30/2025
Water/Sanitary Gas
FiledStatusContractorScope
10/30/2025Permit IssuedBARGAIN PLUMBING INCWater/Sanitary
10/11/2023Signed-offSTIVAN PLBG & HTG INCGas, Water/Sanitary
7 projects · most recent 10/08/2025
General Wiring
FiledStatusContractorScope
10/08/2025Permit IssuedSUPREME ELECTRIC CORPGeneral Wiring
03/08/2024CompleteKET ELECTRIC LLCGeneral Wiring
07/26/2023CompleteEINSTEIN ELEC'L CORPGeneral Wiring
07/13/2023CompleteEINSTEIN ELEC'L CORP—
11/29/2020Permit IssuedSNJ ELECTL CONTRG LLC—
11/18/2020CompleteSTEVEN FARKAS—
05/21/2018CompleteBELMONT ELECTRICAL, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
05/05/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/28/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/23/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/01/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/22/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/19/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/28/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/09/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/21/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
05/28/2025FinalAUDRA MANZANOprogress
04/24/2024Energy Code Compliance InspectionsDina Vedmedprogress
04/24/2024Fire-Resistant Penetrations and JointsPIETRO ROSATOspecial
04/23/2024Fire-Resistant Penetrations and JointsPIETRO ROSATOspecial
04/23/2024Energy Code Compliance InspectionsDina Vedmedprogress
01/24/2024Fire-Resistant Penetrations and JointsERIC BERLENTspecial
01/24/2024Fire-Resistance Rated ConstructionERIC BERLENTprogress
01/24/2024FinalJOHN LEEprogress
01/17/2024Mechanical SystemsMichael Tobiasspecial
01/17/2024FinalMichael Tobiasprogress
01/02/2024Fire-Resistant Penetrations and JointsERIC BERLENTspecial
01/02/2024Fire-Resistance Rated ConstructionERIC BERLENTprogress
01/02/2024FinalJOHN LEEprogress
12/05/2023Lighting in dwelling unitsDina Vedmedenergy_progress
11/09/2023Fire-Resistance Rated ConstructionERIC BERLENTprogress
11/09/2023Fire-Resistant Penetrations and JointsERIC BERLENTspecial
11/08/2023Energy Code Compliance InspectionsDina Vedmedprogress
10/16/2023FinalDina Vedmedprogress
10/11/2023Fire-Resistant Penetrations and Joints—special
10/11/2023Post-installed Anchors—special
10/10/2023Fire-Resistant Penetrations and Joints—special
10/10/2023Post-installed Anchors—special
▾Documents — 240 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch14
09/03/2026M00491905-I1Request digital key ↗
08/30/2026M00883867-I1Request digital key ↗
08/30/2026M00883867-P1Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00416288-I1Request digital key ↗
▸Applications & Permits56
▸BISWORK PERMIT APPLICATION21
02/14/2018123184204Open ↗
02/02/2018123184204Open ↗
11/02/2013120307550Open ↗
Showing 3 of 21 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION21
02/26/2018123184204Open ↗
02/08/2018123184204Open ↗
09/29/2017123184204Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWLPC Approval/Permit14
08/21/2026M01231969-I1Open ↗
08/13/2026M00949883-I1Open ↗
08/13/2026M00872895-I1Open ↗
Showing 3 of 14 on file for this type
▸Seals & Professional Certifications59
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION18
07/17/2018123184204Open ↗
07/17/2018123184204Open ↗
07/17/2018123184204Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/03/2026M00491905-I1Open ↗
08/30/2026M00883867-I1Open ↗
08/30/2026M00883867-P1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/01/2026M00872895-P2Open ↗
09/01/2026M00872895-P2Open ↗
08/29/2026M00872895-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026M00872895-P2Open ↗
08/29/2026M00872895-P1Open ↗
08/27/2026M00872895-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
07/19/2012121154883Open ↗
04/29/2011120671031Open ↗
09/23/2008110254395Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
07/19/2012121154883Open ↗
04/29/2011120671031Open ↗
10/31/2008110254395Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment28
▸BISSELF-CERT PLUMBING NOTICE12
06/18/2014120307550Open ↗
03/25/2013121154883Open ↗
12/28/2012121154883Open ↗
Showing 3 of 12 on file for this type
▸BISSCHEDULE B - PLUMBING11
08/17/2012121154883Open ↗
08/15/2012121154883Open ↗
07/19/2012121154883Open ↗
Showing 3 of 11 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
02/26/2018123184204Open ↗
02/08/2018123184204Open ↗
09/29/2017123184204Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes1
09/29/2017123184204Open ↗
▸BISST-1 Street Tree Checklist1
08/24/2009120138788Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026M00416288-I1Open ↗
▸Environmental & Asbestos17
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
09/03/2026M00491905-I1Open ↗
08/28/2026M00872895-P2Open ↗
08/28/2026M00872895-I1Open ↗
Showing 3 of 10 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
05/11/2011120671031Open ↗
03/31/2010120307550Open ↗
03/31/2010120307550Open ↗
Showing 3 of 5 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
07/19/2012121154883Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/11/2017123184204Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
07/17/2018123184204Open ↗
07/17/2018123184204Open ↗
09/29/2017123184204Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
07/17/2018123184204Open ↗
04/25/2013121154883Open ↗
▸Approvals, Objections & Sign-offs13
▸BISADMINISTRATIVE OBJECTIONS7
07/19/2012121154883Open ↗
08/22/2011120794097Open ↗
04/29/2011120671031Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
07/17/2018123184204Open ↗
04/25/2013121154883Open ↗
07/02/2010120180053Open ↗
Showing 3 of 4 on file for this type
▸BISLANDMARKS APPROVAL1
10/31/2017123184204Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
01/28/2011120307550Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT11
07/17/2018123184204Open ↗
09/29/2017123184204Open ↗
04/25/2013121154883Open ↗
Showing 3 of 11 on file for this type
▸Filing & Intake Forms19
▸BISADDITIONAL INFORMATION8
03/16/2018123184204Open ↗
02/26/2018123184204Open ↗
02/16/2018123184204Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING COVER SHEET8
09/29/2017123184204Open ↗
07/19/2012121154883Open ↗
08/22/2011120794097Open ↗
Showing 3 of 8 on file for this type
▸BISBOROUGH INTAKE FORM3
07/17/2018123184204Open ↗
02/26/2018123184204Open ↗
02/08/2018123184204Open ↗
▸Other Documents11
▸DOB NOWProof of Historic Building6
08/21/2026M01231969-I1Open ↗
08/13/2026M00872895-P1Open ↗
08/13/2026M00872895-I1Open ↗
Showing 3 of 6 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form3
02/02/2018123184204Open ↗
07/25/2012121154883Open ↗
11/06/2008110254395Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
03/04/2011120307550Open ↗
11/17/2009110254395Open ↗