← Back
City residence, one family
520 EAST 82 STREET
MANHATTAN · Upper East Side-Yorkville · BIN 1051155
💬 Discuss this project
1920Year Built
4Stories
A4Building Class
R8BZoning
4,506 sfGross Floor Area
1Units
1 Open Violation ▸
City residence, one family · 1,916 sf lot · 2.35 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction57p · 2 filings · 20 docs
Floor 4Under Construction69p · 2 filings · 20 docs
Floor 3Under Construction68p · 2 filings · 20 docs
Floor 2Under Construction64p · 2 filings · 20 docs
Floor 1Under Construction74p · 3 filings · 20 docs
CellarUnder Construction73p · 3 filings · 20 docs
Site & exteriorUnder Construction5p · 1 filing · 2 docs
Filed — no permit issued92p · 5 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ZKW ENTERPRISES507/31/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/25/2023$4.3M—Private party → Private party$954/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
360 ENGINEERING P.C.704/13/2026
INFINITY DESIGN CONSULTANT INC403/29/2026
RYAN MIN ARCHITECT PLLC101/05/2026
ASR ENGINEERING PC107/28/2025
TMSARCHITECTS.LLC405/04/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BIG ORANGE EXPEDITING1603/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AT CONSTRUCTION & WIRELESSGeneral Contractor2209/10/2026
ZKW ENTERPRISES INCGeneral Contractor207/31/2026
DEPENDABLE MECHANICAL CORFire Protection107/08/2026
OTEC PLBNG & HTG SVCS INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SAMY ABOUZID ENGINEERING9517403/29/2026
360 ENGINEERING P.C.7496506/03/2025
TMSARCHITECTS LLC6907205/04/2025
Building Lifecycle
All (88)Filed (16)Permit Issued (17)Signed Off (1)Violation (7)Inspection (9)Objection (8)Special Inspection (30)
09/09/2026
Permit issued — Supported Scaffold
M01342238-I1-SF
09/09/2026
Permit issued — General Construction
M01042329-I1-GC
08/18/2026
Violation issued (ECB, open)
Construction
07/30/2026
Permit issued — Sidewalk Shed
M01262145-I1-SH
04/17/2026
Objection raised — Other
04/17/2026
Objection resolved — Resolved
04/15/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/15/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/13/2026
Filed — Alteration
DESIGN OF NEW SOIL RETAINING WALL AT REAR YARD, UNDERPINNING AT FRONT STOOP, & REPLACEMENT STAIR AT FRONT STOOP IN CONJUNCTION WITH JOB #M1042329-I1
M01310521-I1
04/06/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/01/2026
Permit issued — Supported Scaffold
M01342238-I1-SF
04/01/2026
Permit issued — Structural
M00880022-S1-ST
04/01/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/01/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/29/2026
Filed — Alteration
FURNISH AND INSTALL (7) SPLIT SYSTEM HEAT PUMP CONCEALED INDOOR AIR HANDLING UNITS AND (7) OUTDOOR CONDENSING UNITS SYSTEMS WITH ASSOCIATED DUCT WORK, INSULATION, AIR OUTLETS, DUCT INSULATION AND ASSOCIATED REFRIGERATION PIPING. IN ADDITION RADIANT FLOOR
M01379810-I1
03/19/2026
Permit issued — Plumbing
M01042329-S1-PL
01/09/2026
Permit issued — Supported Scaffold
M01342238-I1-SF
01/05/2026
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS, AND OCCUPANCY UNDER THIS APPLICATION.
M01342238-I1
12/08/2025
Filed — Alteration
M01310497-I1
11/19/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
11/05/2025
Violation issued (ECB, closed)
Unknown
10/31/2025
Violation issued (ECB, closed)
Construction
10/29/2025
Special inspection requirement — Footing and Foundation
10/29/2025
Special inspection requirement — Final
08/27/2025
Permit issued — Sprinklers
M00880022-S2-EW-SP
08/20/2025
Signed off — Alteration
M01066719-I1
08/14/2025
Special inspection requirement — Sprinkler Systems
Samy Abouzid
08/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Samy Abouzid
08/14/2025
Special inspection requirement — Post-installed Anchors
Samy Abouzid
07/31/2025
Special inspection requirement — Lighting controls
Timothy Sudweeks
07/31/2025
Special inspection requirement — Interior lighting power
Timothy Sudweeks
07/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Timothy Sudweeks
07/31/2025
Special inspection requirement — Maintenance information
Timothy Sudweeks
07/31/2025
Special inspection requirement — Fenestration air leakage
Timothy Sudweeks
07/31/2025
Special inspection requirement — Lighting in dwelling units
Timothy Sudweeks
07/31/2025
Special inspection requirement — Fire-Resistance Rated Construction
Timothy Sudweeks
07/31/2025
Special inspection requirement — Air barrier - visual inspection
Timothy Sudweeks
07/31/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Timothy Sudweeks
07/31/2025
Special inspection requirement — Insulation placement and R values
Timothy Sudweeks
07/31/2025
Special inspection requirement — Fenestration areas
Timothy Sudweeks
07/30/2025
Permit issued — Sidewalk Shed
M01262145-I1-SH
07/28/2025
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01262145-I1
07/25/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/25/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
07/25/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/25/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/22/2025
Filed — Alteration CO
Installation of plumbing piping including hot and cold water, sanitary and storm water piping. Installation of new gas piping utilizing the existing service. installation of new plumbing fixtures as per plans.
M01042329-S1
07/22/2025
Permit issued — Structural
M00880022-S3-ST
07/21/2025
Filed — Alteration
VERTICAL ENLARGEMENT OF EXIST BUILDING.
M00880022-P2
07/21/2025
Violation issued (ECB, closed)
Construction
07/21/2025
Violation issued (ECB, closed)
Plumbing
07/21/2025
Special inspection requirement — Sprinkler Systems
Samy Abouzid
07/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Samy Abouzid
07/21/2025
Special inspection requirement — Post-installed Anchors
Samy Abouzid
06/26/2025
Objection resolved — Addressed
06/18/2025
Permit issued — Structural
M00880022-S1-ST
06/17/2025
Violation issued (ECB, closed)
Unknown
06/17/2025
Violation issued (ECB, closed)
Construction
06/16/2025
Objection raised — Scope
06/03/2025
Filed — Alteration
VERTICAL ENLARGEMENT OF EXIST BUILDING.
M00880022-S3
Latest 60 of 88 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedAT CONSTRUCTION & WIRELESS09/09/2026
DOB NOWGeneral ConstructionPermit IssuedAT CONSTRUCTION & WIRELESS09/09/2026
DOB NOWSidewalk ShedPermit IssuedZKW ENTERPRISES INC07/30/2026
DOB NOWSupported ScaffoldPermit IssuedAT CONSTRUCTION & WIRELES04/01/2026
DOB NOWStructuralPermit IssuedAT CONSTRUCTION & WIRELES04/01/2026
DOB NOWPlumbingPermit IssuedOTEC PLBNG & HTG SVCS INC03/19/2026
DOB NOWSupported ScaffoldPermit IssuedAT CONSTRUCTION & WIRELES01/09/2026
DOB NOWSprinklersPermit IssuedDEPENDABLE MECHANICAL COR08/27/2025
DOB NOWSidewalk ShedPermit IssuedZKW ENTERPRISES INC07/30/2025
DOB NOWStructuralPermit IssuedAT CONSTRUCTION & WIRELES07/22/2025
DOB NOWStructuralPermit IssuedAT CONSTRUCTION & WIRELES06/18/2025
DOB NOWGeneral ConstructionPermit IssuedAT CONSTRUCTION & WIRELES05/21/2025
DOB NOWFoundationSigned-offAT CONSTRUCTION & WIRELES12/23/2024
DOB NOWGeneral ConstructionPermit IssuedAT CONSTRUCTION & WIRELES11/20/2024
DOB NOWStructuralPermit IssuedAT CONSTRUCTION & WIRELES04/11/2024
DOB NOWStructuralPermit IssuedAT CONSTRUCTION & WIRELES02/02/2024
DOB NOWGeneral ConstructionPermit IssuedAT CONSTRUCTION & WIRELES06/06/2023
BISEQISSUEDCLARK WILKINS INDUS INC.03/27/2003
1 project · most recent 03/29/2026
Heating and Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
03/29/2026——Heating and Air Conditioning Systems, Heating Systems
Heat / Cool
Mitsubishi Electric PEAD-A36AA7 36,000 BTU · Vrf Indoor ×4
PUZ-A36NKA7 36,000 BTU · Condensing Unit ×4
PEAD-A12AA7 12,000 BTU · Vrf Indoor ×1
PEAD-A18AA7 18,000 BTU · Vrf Indoor ×1
PEAD-A30AA7 30,000 BTU · Ahu ×1
PUZ-A12NKA7 12,000 BTU · Condensing Unit ×1
PUZ-A18NKA7 18,000 BTU · Condensing Unit ×1
PUZ-A30NHA7 30,000 BTU · Condensing Unit ×1
Heating
Lochinvar NKB150 150,000 BTU · Radiant ×1
1 project · most recent 07/21/2025
FiledStatusContractorScope
07/21/2025Permit IssuedA&H EXPRESS PLBG&HTG CORP56 heads
1 project · most recent 07/22/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/22/2025Permit IssuedOTEC PLBNG & HTG SVCS INCGas, Storm, Water/Sanitary
2 projects · most recent 07/31/2025
FiledStatusContractorScope
07/31/2025Permit IssuedRICHARD NEU—
05/23/2025Permit IssuedPRUDENT ELECTRIC INC1 meters, 1 new_meters
3 projects · most recent 04/13/2026
Steel
FiledStatusContractorScope
04/13/2026——1 scope_items
07/28/2025Permit IssuedZKW ENTERPRISES INC1 scope_items
07/21/2025Permit IssuedAT CONSTRUCTION & WIRELESSteel
2 projects · most recent 01/05/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
01/05/2026Permit IssuedAT CONSTRUCTION & WIRELESScaffold
07/28/2025Permit IssuedZKW ENTERPRISES INCSidewalk Shed
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
04/15/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/15/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/06/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/01/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/01/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/25/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/25/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
07/25/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/25/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 49
DateRequirementInspectorRole
11/19/2025Excavations - Sheeting, Shoring, and Bracing—special
10/29/2025Footing and Foundation—progress
10/29/2025Final—progress
08/14/2025Sprinkler SystemsSamy Abouzidspecial
08/14/2025Fire-Resistant Penetrations and JointsSamy Abouzidspecial
08/14/2025Post-installed AnchorsSamy Abouzidspecial
07/31/2025Lighting controlsTimothy Sudweeksenergy_progress
07/31/2025Interior lighting powerTimothy Sudweeksenergy_progress
07/31/2025Fire-Resistant Penetrations and JointsTimothy Sudweeksspecial
07/31/2025Maintenance informationTimothy Sudweeksenergy_progress
07/31/2025Fenestration air leakageTimothy Sudweeksenergy_progress
07/31/2025Lighting in dwelling unitsTimothy Sudweeksenergy_progress
07/31/2025Fire-Resistance Rated ConstructionTimothy Sudweeksprogress
07/31/2025Air barrier - visual inspectionTimothy Sudweeksenergy_progress
07/31/2025Fenestration and door U-factor and product ratingsTimothy Sudweeksenergy_progress
07/31/2025Insulation placement and R valuesTimothy Sudweeksenergy_progress
07/31/2025Fenestration areasTimothy Sudweeksenergy_progress
07/21/2025Sprinkler SystemsSamy Abouzidspecial
07/21/2025Fire-Resistant Penetrations and JointsSamy Abouzidspecial
07/21/2025Post-installed AnchorsSamy Abouzidspecial
06/02/2025Structural Stability – Alterations of existing buildingsPETER FOSTERspecial
06/02/2025Post-installed AnchorsPETER FOSTERspecial
06/02/2025MasonryPETER FOSTERspecial
05/22/2025Structural Steel - DetailsPETER FOSTERspecial
05/22/2025Structural Steel - High Strength BoltingPETER FOSTERspecial
Latest 25 of 49.
▾Documents — 118 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch20
09/06/2026M00880832-S1Request digital key ↗
09/06/2026M00880832-I1Request digital key ↗
09/06/2026M01310521-I1Request digital key ↗
Showing 3 of 20 on file for this type
▸Seals & Professional Certifications68
▸DOB NOWProgress Inspector Seal & Signature25
09/02/2026M00880022-S3Open ↗
08/31/2026M00880022-I1Open ↗
08/27/2026M01066719-P1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature22
09/02/2026M00880022-S3Open ↗
09/02/2026M00880022-S3Open ↗
09/02/2026M00880022-S3Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
09/06/2026M00880832-I1Open ↗
09/06/2026M00880832-S1Open ↗
09/06/2026M01310521-S1Open ↗
Showing 3 of 21 on file for this type
▸Trade Schedules & Equipment1
▸BISEQUIPMENT USE PERMITS1
02/21/2023103429817Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/27/2026M01042329-I1Open ↗
08/27/2026M01042329-P1Open ↗
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
09/06/2026M00880832-S1Open ↗
09/06/2026M00880832-I1Open ↗
08/27/2026M01042329-P1Open ↗
Showing 3 of 15 on file for this type
▸Inspections & Test Reports8
▸DOB NOWGeotechnical Report (BC 1803.6)5
09/06/2026M01310521-I1Open ↗
09/06/2026M01310521-S1Open ↗
08/13/2026M01310521-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSOIL REPORT2
08/13/2026M01066719-P1Open ↗
08/13/2026M01066719-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026M01066719-I1Open ↗
▸Other Documents4
▸DOB NOWProperty Ownership Certification2
08/27/2026M01042329-I1Open ↗
08/27/2026M01042329-P1Open ↗
▸DOB NOWEvaluation of Adjacent Building Report (BC 1817.3)2
08/13/2026M01066719-P1Open ↗
08/13/2026M01066719-I1Open ↗