← Back
BuildNYC
Elevator apt, semi-fireproof with stores
520 WEST 163RD STREET
MANHATTAN · BIN 1062949
💬 Discuss this project
1922Year Built
6Stories
D7Building Class
R7-2Zoning
53,384 sfGross Floor Area
61Units
LL97 CoveredRent Stabilized36 Active Violations 34 unresolved · 2 paperwork only 1 old, status unconfirmed ▸
Elevator apt, semi-fireproof with stores · Owner of record: Three in One Equities · 11,240 sf lot · 4.75 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofThree In One Equities.llc2p · 2 filings · 6 docs
Floor 1Alma Realty CORP11p · 4 filings · 17 docs
Site & exteriorAlma Realty CORP30p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Alma Realty3207/08/2026
Three in One Equities703/22/2026
The Pinnacle Group203/21/2026
3In1 Equities103/22/2026
1055 St Nicholas Food103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Richard Koenigsberg303/05/2025
Alma Realty109/02/2022
Ospino Engineering207/29/2021
Colombo Architectural Studio207/09/2021
Syed Engineering212/10/2020
Michael L. Pinske105/09/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Alma Realty403/21/2026
Evangelista203/21/2026
Frank Bueno Expediting403/21/2026
Codegreen203/21/2026
Expediting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Hamalia Restorationspecialty_contractor903/21/2026
United Construction and DesignGeneral Contractor603/21/2026
Topline GCScaffold607/08/2026
CJ Heating & MechanicalPlumbing207/08/2026
Qec Electrical SvceElectrical103/22/2026
S & L PlumbingPlumbing107/08/2026
Wise Electric SolutionsElectrical103/21/2026
Buildwell GroupScaffold107/08/2026
Hamalia RestorationScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Koenigsberg Engineering2247203/05/2025
P Georgopoulos Architect889109/02/2022
Building Lifecycle
All (107)Filed (11)Permit Issued (14)Signed Off (1)Violation (60)Inspection (3)Objection (5)Special Inspection (13)
08/11/2026
Violation issued (ECB, closed)
Elevators
07/08/2026
Violation issued (HPD, closed)
C
04/20/2026
Violation issued (HPD, closed)
C
04/20/2026
Violation issued (HPD, closed)
C
03/15/2026
Violation issued (HPD, closed)
C
12/18/2025
Violation issued (ECB, closed)
Elevators
12/13/2025
Violation issued (HPD, closed)
C
12/01/2025
Violation issued (ECB, closed)
Elevators
09/24/2025
Violation issued (HPD, closed)
C
09/24/2025
Violation issued (HPD, closed)
C
09/17/2025
Violation issued (HPD, closed)
A
09/17/2025
Violation issued (HPD, closed)
A
09/17/2025
Violation issued (HPD, closed)
B
09/17/2025
Violation issued (HPD, closed)
B
09/17/2025
Violation issued (HPD, closed)
B
09/17/2025
Violation issued (HPD, closed)
B
09/17/2025
Violation issued (HPD, closed)
B
09/17/2025
Violation issued (HPD, closed)
B
09/17/2025
Violation issued (HPD, closed)
A
09/17/2025
Violation issued (HPD, closed)
C
09/17/2025
Violation issued (HPD, open)
B
09/17/2025
Violation issued (HPD, closed)
B
09/10/2025
Violation issued (HPD, closed)
C
09/10/2025
Violation issued (HPD, closed)
C
08/18/2025
Violation issued (ECB, closed)
Elevators
07/15/2025
Violation issued (ECB, closed)
Elevators
06/08/2025
Violation issued (HPD, closed)
B
06/07/2025
Violation issued (HPD, closed)
C
06/07/2025
Violation issued (HPD, closed)
C
06/06/2025
Violation issued (HPD, closed)
B
06/06/2025
Violation issued (HPD, closed)
C
06/06/2025
Violation issued (HPD, closed)
B
06/01/2025
Violation issued (HPD, closed)
C
06/01/2025
Violation issued (HPD, closed)
C
06/01/2025
Violation issued (HPD, closed)
C
06/01/2025
Violation issued (HPD, closed)
C
05/31/2025
Violation issued (HPD, closed)
C
05/31/2025
Violation issued (HPD, closed)
C
05/22/2025
Violation issued (ECB, closed)
Elevators
05/07/2025
Violation issued (HPD, closed)
C
05/01/2025
Violation issued (HPD, closed)
C
05/01/2025
Violation issued (HPD, closed)
A
04/28/2025
Violation issued (HPD, closed)
B
04/28/2025
Violation issued (HPD, closed)
A
04/28/2025
Violation issued (HPD, closed)
B
04/28/2025
Violation issued (HPD, closed)
A
04/28/2025
Violation issued (HPD, closed)
C
04/03/2025
Violation issued (HPD, closed)
A
04/03/2025
Violation issued (HPD, closed)
C
03/27/2025
Violation issued (HPD, closed)
B
03/27/2025
Violation issued (HPD, closed)
B
03/12/2025
Signed off — Alteration
Facade Repair as per plans.
M00534545-I1
03/06/2025
Special inspection requirement — Final
RICHARD KOENIGSBERG
03/06/2025
Special inspection requirement — Post-installed Anchors
RICHARD KOENIGSBERG
03/06/2025
Special inspection requirement — Masonry
RICHARD KOENIGSBERG
03/06/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
RICHARD KOENIGSBERG
03/05/2025
Filed — Alteration
Facade Repair as per plans.
M00534545-P2
03/05/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
RICHARD KOENIGSBERG
03/05/2025
Special inspection requirement — Masonry
RICHARD KOENIGSBERG
03/05/2025
Special inspection requirement — Post-installed Anchors
RICHARD KOENIGSBERG
Latest 60 of 107 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedS & L Plumbing09/13/2022
DOB NOWPlumbingSigned-offCJ Heating & Mechanical08/10/2022
DOB NOWGeneral ConstructionPermit IssuedUnited Construction and D02/01/2022
DOB NOWSidewalk ShedPermit IssuedTopline GC10/22/2021
DOB NOWGeneral ConstructionSigned-offHamalia Restoration09/15/2021
DOB NOWGeneral ConstructionSigned-offHamalia Restoration09/15/2021
DOB NOWPlumbingSigned-offCJ Heating & Mechanical09/01/2021
DOB NOWGeneral ConstructionSigned-offHamalia Restoration08/11/2021
DOB NOWGeneral ConstructionPermit IssuedUnited Construction and D08/06/2021
DOB NOWSupported ScaffoldPermit IssuedHamalia Restoration07/16/2021
DOB NOWSidewalk ShedPermit IssuedTopline GC06/28/2021
DOB NOWSupported ScaffoldPermit IssuedTopline GC12/10/2020
DOB NOWSidewalk ShedPermit IssuedTopline GC10/26/2020
DOB NOWSidewalk ShedPermit IssuedBuildwell Group07/23/2020
BISOTISSUEDCityline Restoration12/05/2020
BISFPISSUEDFire Command Co04/16/2019
BISFPISSUEDMaster Fire Systems06/30/2015
BISFSISSUEDJack Piccini10/17/2014
BISFPISSUEDMaster Fire Systems02/11/2014
BISOTISSUEDBCS Construction Services11/13/2013
BISPLISSUEDMarathon Mechanical04/26/2013
BISFBISSUEDAmerican Boiler & Welding04/26/2013
BISFPISSUEDMaster Fire Prevention Systme11/15/1999
BISPLISSUEDMainland Plumbing & Heating11/08/1999
BISOTISSUEDWKL Construction11/01/1999
BISEQISSUEDRicky_ & _BROS._CONSTRUCTION10/25/1999
BISOTISSUEDRicky_ & _BROS._CONSTRUCTION10/22/1999
BISBLISSUEDEsposito Heating Contractor03/31/1995
BISBLISSUEDM. Esposito Heating Contracting11/21/1994
BISPLISSUEDCroom Plumbing & Heating08/31/1992
BISMHISSUEDHung Sung Construction08/25/1992
BISOTISSUEDHung Sung Construction08/12/1992
6 projects · most recent 03/12/2026
General Wiring
FiledStatusContractorScope
03/12/2026Permit IssuedOmd Electrical1 meters, 1 new_meters
10/14/2021Permit IssuedQec Electrical Svce63 meters, 63 new_meters
07/12/2021Permit IssuedJoseph Weinstein ElectricGeneral Wiring
07/17/2020Permit IssuedQec Electrical Svce1 meters, 1 new_meters
07/12/2020Permit IssuedRichard Neu—
05/08/2019CompleteRC3 Electric1 meters
3 projects · most recent 07/29/2021
Scaffold Sidewalk Shed
FiledStatusContractorScope
07/29/2021Permit IssuedHamalia RestorationScaffold
12/10/2020Permit IssuedBuildwell NYScaffold
07/23/2020Permit IssuedTopline GCSidewalk Shed
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/30/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/26/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/19/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
03/06/2025FinalRICHARD KOENIGSBERGprogress
03/06/2025Post-installed AnchorsRICHARD KOENIGSBERGspecial
03/06/2025MasonryRICHARD KOENIGSBERGspecial
03/06/2025Structural Stability – Alterations of existing buildingsRICHARD KOENIGSBERGspecial
03/05/2025Structural Stability – Alterations of existing buildingsRICHARD KOENIGSBERGspecial
03/05/2025MasonryRICHARD KOENIGSBERGspecial
03/05/2025Post-installed AnchorsRICHARD KOENIGSBERGspecial
03/05/2025FinalRICHARD KOENIGSBERGprogress
05/29/2021Lighting controlsYahaira Volquez Colomboenergy_progress
05/29/2021FinalYahaira Volquez Colomboprogress
05/29/2021Fire-Resistance Rated ConstructionYahaira Volquez Colomboprogress
05/29/2021Interior lighting powerYahaira Volquez Colomboenergy_progress
05/29/2021Energy Code Compliance InspectionsYahaira Volquez Colomboprogress
▾Documents — 110 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch8
09/03/2026M00531335-I1Request digital key ↗
09/03/2026M00531338-I1Request digital key ↗
09/03/2026M00548129-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00369630-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/04/2026M00437625-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Antenna1
08/15/2026M00113044-I1Request digital key ↗
▸Applications & Permits15
▸BISWORK PERMIT APPLICATION10
12/05/2020140986315Open ↗
11/08/2019140840730Open ↗
04/04/2019140840730Open ↗
Showing 3 of 10 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION5
12/03/2020140986315Open ↗
04/04/2019140840730Open ↗
08/25/2015122451346Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications43
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/05/2026M00113044-I1Open ↗
09/04/2026M00437625-I1Open ↗
09/01/2026M00783850-I1Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
06/27/2016121598743Open ↗
05/16/2016121598743Open ↗
08/25/2015122451346Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/01/2026M00531338-I1Open ↗
09/01/2026M00534545-I1Open ↗
09/01/2026M00534545-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026M00534545-I1Open ↗
09/01/2026M00534545-I1Open ↗
09/01/2026M00534545-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
12/03/2020140986315Open ↗
04/04/2019140840730Open ↗
08/25/2015122451346Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
12/03/2020140986315Open ↗
04/04/2019140840730Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
08/25/2015122451346Open ↗
11/18/2013121841454Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
12/03/2020140986315Open ↗
04/04/2019140840730Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
05/02/2013121598743Open ↗
▸Trade Schedules & Equipment4
▸BISSELF-CERT PLUMBING NOTICE2
11/27/2013121598743Open ↗
06/04/2013121598743Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
05/02/2013121598743Open ↗
▸BISSCHEDULE B - PLUMBING1
05/02/2013121598743Open ↗
▸Safety & Tenant Protection4
▸DOB NOWTenant Protection Plan2
08/13/2026M00369630-I1Open ↗
08/13/2026M00437625-I1Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
12/05/2020140986315Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
04/04/2019140840730Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/01/2026M00783850-I1Open ↗
08/13/2026M00531335-I1Open ↗
08/13/2026M00531338-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS-CERTIFICATION (DEP ACP5)2
05/02/2013121598743Open ↗
12/03/2020140986315Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
05/16/2016121598743Open ↗
05/02/2013121598743Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
12/05/2020140986315Open ↗
12/03/2020140986315Open ↗
▸BISTR8: Energy Code Progress Inspections1
05/02/2013121598743Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
12/03/2020140986315Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
05/16/2016121598743Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
12/05/2020140986315Open ↗
12/03/2020140986315Open ↗
04/04/2019140840730Open ↗
▸Approvals, Objections & Sign-offs4
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
06/27/2016121598743Open ↗
06/27/2016121598743Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
05/08/2013121598743Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
04/04/2019140840730Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
12/03/2020140986315Open ↗
04/04/2019140840730Open ↗
05/16/2016121598743Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms5
▸BISEFILING COVER SHEET3
08/25/2015122451346Open ↗
11/18/2013121841454Open ↗
05/02/2013121598743Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
12/03/2020140986315Open ↗
04/04/2019140840730Open ↗