← Back
Single or multiple dwelling with stores or offices
521 BAY STREET
STATEN ISLAND · BIN 5013182
💬 Discuss this project
1931Year Built
3Stories
S9Building Class
R6Zoning
6,750 sfGross Floor Area
6Units
Rent Stabilized3 Open Violations ▸
Single or multiple dwelling with stores or offices · Owner of record: GOODSTUFF OF NEW YORK, INC. · 6,394 sf lot · 1.06 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalGeneral
Roof6p · 3 filings · 18 docs
Floor 13p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EPSILON ENTERPRISES REALTY2407/08/2026
GOODSTUFF OF NEW YORK, INC.303/22/2026
GOODSTUFF703/22/2026
521-523 BAY ST,LLC203/22/2026
521-522 BAY ST LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ISSA KHORASANCHI P.E.609/20/2023
TECTONIC ENGINEERING105/25/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SOLOGISTICS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HERITAGE CHIMNEY SERV INCElectrical203/21/2026
PENNACHIO, ROBERTElectrical203/21/2026
CHAMPION MECHANICAL INCGeneral Contractor203/21/2026
UGE USA INCGeneral Contractor107/08/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IP CONCRETE TESTING AND I6252509/20/2023
TECTONIC ENGINEERING CONS106105/25/2021
Building Lifecycle
All (43)Filed (7)Permit Issued (3)Signed Off (1)Violation (22)Inspection (5)Objection (2)Special Inspection (3)
05/07/2026
Violation issued (HPD, open)
A
06/12/2025
Violation issued (HPD, closed)
A
04/16/2024
Violation issued (HPD, closed)
A
09/26/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/20/2023
Filed — Alteration
INSTALL NEW PLUMBING FIXTURES AND COOKING APPLIANCE INCLUDING ALL ASSOCIATED PIPING.
S00727350-P2
08/23/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/15/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/15/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/20/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/21/2023
Special inspection requirement — Mechanical Systems
INDARDEO PARBHUNATH
06/21/2023
Special inspection requirement — Final
ISSA KHORASANCHI
06/17/2023
Filed — Alteration
INSTALL NEW PLUMBING FIXTURES AND COOKING APPLIANCE INCLUDING ALL ASSOCIATED PIPING.
S00727350-P1
06/17/2023
Filed — Alteration
INSTALL NEW MECHANICAL VENTILATION OVER THE COMMERCIAL KITCHEN COOKING APPLIANCE.
S00727354-P1
06/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
03/29/2023
Violation issued (HPD, closed)
A
02/14/2023
Permit issued — Plumbing
S00727350-I1-PL
02/14/2023
Permit issued — Mechanical Systems
S00727354-I1-MS
05/12/2022
Filed — Alteration
INSTALL NEW PLUMBING FIXTURES AND COOKING APPLIANCE INCLUDING ALL ASSOCIATED PIPING.
S00727350-I1
05/12/2022
Filed — Alteration
S00727348-I1
05/12/2022
Filed — Alteration
INSTALL NEW MECHANICAL VENTILATION OVER THE COMMERCIAL KITCHEN COOKING APPLIANCE.
S00727354-I1
03/08/2022
Violation issued (HPD, closed)
I
03/08/2022
Violation issued (HPD, closed)
A
01/06/2022
Signed off — Alteration
INSTALLATION OF STEEL DUNNAGE TO SUPPORT BATTERY UNIT ON EXISTING ROOF STRUCTURE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
S00520044-I1
11/18/2021
Permit issued — Structural
S00520044-I1-ST
06/02/2021
Objection raised — Scope
06/02/2021
Objection resolved — Addressed
05/25/2021
Filed — Alteration
INSTALLATION OF STEEL DUNNAGE TO SUPPORT BATTERY UNIT ON EXISTING ROOF STRUCTURE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
S00520044-I1
04/16/2021
Violation issued (HPD, closed)
A
01/19/2017
Violation issued (HPD, open)
A
01/19/2017
Violation issued (HPD, open)
B
11/23/2016
Violation issued (HPD, closed)
I
03/02/2015
Violation issued (HPD, closed)
I
05/22/2014
Violation issued (ECB, closed)
Construction
01/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/25/2013
Violation issued (ECB, closed)
Construction
10/25/2013
Violation issued (ECB, closed)
Construction
05/18/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/19/2011
Violation issued (ECB, closed)
Construction
02/19/2011
Violation issued (ECB, closed)
Construction
12/12/2009
Violation issued (ECB, closed)
Construction
12/12/2009
Violation issued (ECB, closed)
Construction
06/20/2009
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.02/14/2023
DOB NOWMechanical SystemsPermit IssuedCHAMPION MECHANICAL02/14/2023
DOB NOWStructuralSigned-offUGE USA INC11/18/2021
BISOTISSUEDBONOMO & SONS INC12/03/2021
BISOTISSUEDBONOMO & SONS INC10/19/2021
BISMHISSUEDNEW WAVE ELECTR CONTR INC11/06/2013
BISPLISSUEDLIBERTY WATER & SEWER LLC11/06/2013
BISMHISSUEDNEW WAVE ELECTR CONTR INC02/17/2011
BISMHISSUEDNEW WAVE ELECTR CONTR INC11/23/2010
BISPLISSUEDLIBERTY WATER & SEWER LLC10/28/2010
BISFPISSUEDATLANTIC FIRE03/13/1992
1 project · most recent 06/17/2023
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/17/2023Permit IssuedCHAMPION MECHANICAL INCVentilation Systems
Ventilation
Captiveaire NCA14FA 3,500 CFM · Exhaust Fan ×2
1 project · most recent 09/20/2023
Gas Water/Sanitary
FiledStatusContractorScope
09/20/2023Signed-offAMERICAN STANDARD P&H CORGas, Water/Sanitary
2 projects · most recent 10/15/2021
General Wiring
FiledStatusContractorScope
10/15/2021CompleteLIVE WIRE ELECTRIC 1 LLC—
03/04/2018Permit IssuedCENTRUM ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
09/26/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/23/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/15/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/15/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/20/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
06/21/2023Mechanical SystemsINDARDEO PARBHUNATHspecial
06/21/2023FinalISSA KHORASANCHIprogress
06/08/2023Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
▾Documents — 138 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/24/2026S00727348-I1Request digital key ↗
08/23/2026S00727354-P1Request digital key ↗
08/23/2026S00727354-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits20
▸BISWORK PERMIT APPLICATION10
12/03/2021540200450Open ↗
10/19/2021540200441Open ↗
11/07/2013520164795Open ↗
Showing 3 of 10 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION10
11/02/2022540200441Open ↗
06/07/2021540200450Open ↗
05/19/2021540200441Open ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records4
▸BISFLOOD ZONE COMPLIANCE2
12/30/2022540200441Open ↗
10/05/2022540200450Open ↗
▸BISFLOOD ZONE DESIGN CERTIFICATION2
06/07/2021540200450Open ↗
05/19/2021540200441Open ↗
▸Seals & Professional Certifications20
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/23/2026S00727354-I1Open ↗
08/23/2026S00727354-P1Open ↗
08/23/2026S00727350-P1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
05/16/2014520164795Open ↗
10/10/2013520164795Open ↗
07/06/2011520050113Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
06/07/2021540200450Open ↗
05/19/2021540200441Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
06/07/2021540200450Open ↗
05/19/2021540200441Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026S00727354-I1Open ↗
08/24/2026S00727350-P1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/10/2013520164795Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/10/2013520164795Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/26/2026S00727354-I1Open ↗
▸Trade Schedules & Equipment15
▸BISSELF-CERT PLUMBING NOTICE6
05/01/2014520164795Open ↗
04/22/2014520164795Open ↗
01/28/2014520164795Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING4
10/10/2013520164795Open ↗
04/13/2011520050113Open ↗
04/05/2011520050113Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
03/31/2014520164795Open ↗
01/06/2014520164795Open ↗
▸BISWATER METER PERMIT : DEP-METER1
06/20/2011520050113Open ↗
▸BISRPZ/DDCV TEST REPORT : GEN215B1
06/20/2011520050113Open ↗
▸BISGAS CUT-OFF1
05/02/2014520164795Open ↗
▸Safety & Tenant Protection2
▸BISTPP1: TENANT PROTECTION PLAN2
08/10/2021540200441Open ↗
06/07/2021540200450Open ↗
▸Environmental & Asbestos20
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/23/2026S00727354-I1Open ↗
08/23/2026S00727354-P1Open ↗
08/23/2026S00727350-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWOER: Notice to Proceed4
08/13/2026S00727350-I1Open ↗
08/13/2026S00727348-I1Open ↗
08/13/2026S00727354-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
06/07/2021540200450Open ↗
05/19/2021540200441Open ↗
10/10/2013520164795Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION2
12/30/2022540200441Open ↗
10/05/2022540200450Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
06/07/2021540200450Open ↗
05/19/2021540200441Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
10/12/2010520050113Open ↗
▸DOB NOWOER: Notice of Satisfaction1
08/13/2026S00520044-I1Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
12/30/2022540200441Open ↗
10/19/2021540200441Open ↗
06/07/2021540200450Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
05/16/2014520164795Open ↗
10/10/2013520164795Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
12/30/2022540200441Open ↗
10/05/2022540200450Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
06/07/2021540200450Open ↗
05/19/2021540200441Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
05/16/2014520164795Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
10/05/2022540200450Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY4
12/30/2022540200441Open ↗
10/19/2021540200441Open ↗
06/07/2021540200450Open ↗
Showing 3 of 4 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
12/02/2021540200450Open ↗
▸BISHYDRO FLOW TEST LETTER1
10/18/2010520050113Open ↗
▸Approvals, Objections & Sign-offs9
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
01/03/2023540200441Open ↗
10/06/2022540200450Open ↗
05/16/2014520164795Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
10/10/2013520164795Open ↗
10/12/2010520050113Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM1
06/20/2011520050113Open ↗
▸BISFINAL1
10/05/2022540200450Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT7
12/30/2022540200441Open ↗
06/07/2021540200450Open ↗
05/19/2021540200441Open ↗
Showing 3 of 7 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
12/30/2022540200441Open ↗
10/05/2022540200450Open ↗
▸Filing & Intake Forms10
▸BISADDITIONAL INFORMATION6
11/22/2022540200441Open ↗
07/27/2021540200441Open ↗
12/15/2015520164795Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
06/07/2021540200450Open ↗
05/19/2021540200441Open ↗
▸BISEFILING COVER SHEET2
10/10/2013520164795Open ↗
10/12/2010520050113Open ↗
▸Other Documents4
▸BISSUBSTANTIAL IMPROVEMENT CALCULATIONS2
06/07/2021540200450Open ↗
05/19/2021540200441Open ↗
▸BISEMERGENCY & STANDBY POWER SYSTEMS (GENERATORS)1
10/05/2022540200450Open ↗
▸BISMAINTENANCE INFORMATION1
10/05/2022540200450Open ↗