Office with commercial, 1-6 stories
521 BERGEN AVENUE
BRONX · BIN 2000530
💬 Discuss this project
1904Year Built
6Stories
O5Building Class
C4-4Zoning
52,114 sfGross Floor Area
3Units
LL97 Covered0 Open ViolationsFDNY Report ↗
Office with commercial, 1-6 stories · Owner of record: 521 BERGEN PROPERTIES LLC · 7,450 sf lot · 7 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivil
Permit Issued — active, not yet Signed-off
Floor 6Under Construction33p · 1 filing · 16 docs
Floor 54p · 1 filing · 11 docs
Floor 4Under Construction33p · 1 filing · 17 docs
Floor 3Under Construction33p · 1 filing · 17 docs
Floor 2
Floor 14p · 2 filings · 20 docs
Cellar3p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
APOLLON CONTRACTING607/08/2026
JASCO1407/08/2026
521 BERGEN PROPERTIES6207/08/2026
AFOLLOW CONTRACTING LCC103/22/2026
APDILLON CONTRACTING LLC103/22/2026
APPOLLON CONTRACTING LLC203/22/2026
E A F REALTY CORP.203/22/2026
521 BERGEN2103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/14/2019$11.8M—521 BERGEN LLC → 521 BERGEN PROPERTIES LLC$225/sf building
10/11/2017$7.1M—BERGEN RISING, LLC → 521 BERGEN, LLC$136/sf building
08/04/2015$6.0M—— → —$115/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EP ENGINEERING LLC1105/04/2026
JL ARCHITECT501/02/2026
HAIDER ENGINEERING, P.E.212/16/2019
GREEN DESIGN110/29/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PAUL FUSCO CONSULTING3003/21/2026
SNR EXPEDITING DESIGN403/21/2026
ATLANTIC BUILDING SUPPLY INC.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PETRETTI & ASSOCIATES LLCGeneral Contractor1904/09/2026
JASCO, INCGeneral Contractor1007/08/2026
P.H. WORKS INCPlumbing307/08/2026
DEPENDABLE MECHANICAL CORFire Protection307/08/2026
MOREAIR MECHANICAL SERVICGeneral Contractor203/21/2026
APOLLON CONTRACTING LLCGeneral Contractor107/08/2026
F.S. WORKS INCFire Protection107/08/2026
A&H EXPRESS PLBG&HTG CORPPlumbing107/08/2026
ROBERT COLOMBOElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EP INSPECTIONS AND COMMIS70791605/04/2026
Building Lifecycle
All (154)Filed (19)Permit Issued (23)Signed Off (9)Violation (51)Inspection (22)Special Inspection (30)
07/15/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/15/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/09/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/03/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/04/2026
Filed — Alteration
MODIFICATIONS TO EXISTING MECHANICAL SYSTEMS TO INCLUDE HVAC INSTALLATION AND ASSOCIATED DUCTWORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS
X01333019-P1
04/30/2026
Special inspection requirement — Post-installed Anchors
MOLLY GLENN
04/30/2026
Special inspection requirement — HVAC-R and service water heating system controls
MOLLY GLENN
04/30/2026
Special inspection requirement — Maintenance information
MOLLY GLENN
04/30/2026
Special inspection requirement — HVAC-R and service water heating equipment
MOLLY GLENN
04/30/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MOLLY GLENN
04/30/2026
Special inspection requirement — Sprinkler Systems
MOLLY GLENN
04/28/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/06/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/06/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/05/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/05/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/05/2026
Special inspection requirement — Post-installed Anchors
MOLLY GLENN
03/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOLLY GLENN
03/05/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MOLLY GLENN
03/05/2026
Special inspection requirement — Sprinkler Systems
MOLLY GLENN
03/04/2026
Filed — Alteration
MECHANICAL MODIFICATIONS TO INCLUDE HVAC VENTILATION, HEATING, AND COOLING AND ITS ASSOCIATED DUCTWORK AND PIPEWORK. NO CHANGE O FUSE, OCCUPANCY OR EGRESS
X01293620-P1
02/26/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/30/2026
Permit issued — Plumbing
X01333019-S2-PL
01/30/2026
Permit issued — Sprinklers
X01333019-S2-EW-SP
01/14/2026
Signed off — Alteration
MECHANICAL MODIFICATIONS TO INCLUDE HVAC VENTILATION, HEATING, COOLING AND ITS ASSOCIATED DUCTWORK AND PIPEWORK. NO CHANGE OF USE, OCCUPANCY OR EGRESS
X01252661-S1
01/07/2026
Permit issued — Mechanical Systems
X01333019-S1-MS
01/07/2026
Permit issued — General Construction
X01333019-I1-GC
01/05/2026
Filed — Alteration
MODIFICATIONS TO EXISTING MECHANICAL SYSTEMS TO INCLUDE HVAC INSTALLATION AND ASSOCIATED DUCTWORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS
X01333019-S1
01/05/2026
Filed — Alteration
MODIFICATIONS TO EXISTING MECHANICAL SYSTEMS TO INCLUDE HVAC INSTALLATION AND ASSOCIATED DUCTWORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS
X01333019-S2
01/02/2026
Filed — Alteration
MODIFICATIONS TO EXISTING MECHANICAL SYSTEMS TO INCLUDE HVAC INSTALLATION AND ASSOCIATED DUCTWORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS
X01333019-I1
12/16/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/16/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/16/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/16/2025
Special inspection requirement — Interior lighting power
MOLLY GLENN
12/16/2025
Special inspection requirement — Maintenance information
MOLLY GLENN
12/16/2025
Special inspection requirement — Duct leakage testing, insulation and design
MOLLY GLENN
12/16/2025
Special inspection requirement — HVAC-R and service water heating system controls
MOLLY GLENN
12/16/2025
Special inspection requirement — Energy Code Compliance Inspections
MOLLY GLENN
12/16/2025
Special inspection requirement — Final
MOLLY GLENN
12/16/2025
Special inspection requirement — Post-installed Anchors
MOLLY GLENN
12/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOLLY GLENN
12/16/2025
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
MOLLY GLENN
12/16/2025
Special inspection requirement — Mechanical Systems
MOLLY GLENN
12/16/2025
Special inspection requirement — Metering
MOLLY GLENN
12/16/2025
Special inspection requirement — Lighting controls
MOLLY GLENN
12/16/2025
Special inspection requirement — Shutoff dampers
MOLLY GLENN
12/16/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MOLLY GLENN
12/16/2025
Special inspection requirement — HVAC-R and service water heating equipment
MOLLY GLENN
11/18/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/07/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/05/2025
Signed off — Alteration
MECHANICAL MODIFICATIONS TO INCLUDE HVAC VENTILATION, HEATING, COOLING AND ITS ASSOCIATED DUCTWORK AND PIPEWORK. NO CHANGE OF USE, OCCUPANCY OR EGRESS
X01252661-I1
10/31/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/27/2025
Permit issued — Sprinklers
X01293620-S2-EW-SP
10/27/2025
Permit issued — Mechanical Systems
X01293620-S1-MS
10/27/2025
Permit issued — General Construction
X01293620-I1-GC
10/24/2025
Permit issued — Sprinklers
X01293620-S2-PL
10/22/2025
Filed — Alteration
MECHANICAL MODIFICATIONS TO INCLUDE HVAC VENTILATION, HEATING, AND COOLING AND ITS ASSOCIATED DUCTWORK AND PIPEWORK. NO CHANGE O FUSE, OCCUPANCY OR EGRESS
X01293620-I1
10/22/2025
Filed — Alteration
MECHANICAL MODIFICATIONS TO INCLUDE HVAC VENTILATION, HEATING, AND COOLING AND ITS ASSOCIATED DUCTWORK AND PIPEWORK. NO CHANGE O FUSE, OCCUPANCY OR EGRESS
X01293620-S1
10/22/2025
Filed — Alteration
MECHANICAL MODIFICATIONS TO INCLUDE HVAC VENTILATION, HEATING, AND COOLING AND ITS ASSOCIATED DUCTWORK AND PIPEWORK. NO CHANGE O FUSE, OCCUPANCY OR EGRESS
X01293620-S2
09/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOLLY GLENN
Latest 60 of 154 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offP.H. WORKS INC01/30/2026
DOB NOWSprinklersPermit IssuedF.S. WORKS INC01/30/2026
DOB NOWMechanical SystemsPermit IssuedPETRETTI & ASSOCIATES LLC01/07/2026
DOB NOWGeneral ConstructionPermit IssuedPETRETTI & ASSOCIATES LLC01/07/2026
DOB NOWSprinklersPermit IssuedDEPENDABLE MECHANICAL COR10/27/2025
DOB NOWMechanical SystemsPermit IssuedPETRETTI & ASSOCIATES LLC10/27/2025
DOB NOWGeneral ConstructionPermit IssuedPETRETTI & ASSOCIATES LLC10/27/2025
DOB NOWSprinklersSigned-offP.H. WORKS INC10/24/2025
DOB NOWPlumbingSigned-offP.H. WORKS INC08/11/2025
DOB NOWSprinklersSigned-offDEPENDABLE MECHANICAL COR07/25/2025
DOB NOWGeneral ConstructionSigned-offPETRETTI & ASSOCIATES LLC07/24/2025
DOB NOWMechanical SystemsSigned-offMOREAIR MECHANICAL SERVIC07/24/2025
DOB NOWGeneral ConstructionSigned-offPETRETTI & ASSOCIATES LLC03/27/2025
DOB NOWPlumbingSigned-offDEPENDABLE MECHANICAL COR11/07/2024
DOB NOWPlumbingSigned-offA&H EXPRESS PLBG&HTG CORP11/07/2024
DOB NOWMechanical SystemsSigned-offPETRETTI & ASSOCIATES LLC10/18/2024
DOB NOWMechanical SystemsSigned-offPETRETTI & ASSOCIATES LLC10/17/2024
DOB NOWGeneral ConstructionSigned-offPETRETTI & ASSOCIATES LLC10/17/2024
DOB NOWSupported ScaffoldSigned-offJASCO, INC01/07/2021
DOB NOWSidewalk ShedSigned-offJASCO, INC10/01/2020
DOB NOWSupported ScaffoldSigned-offJASCO, INC12/16/2019
DOB NOWConstruction FenceSigned-offPOLLON CONTRACTING LLC10/30/2019
DOB NOWSidewalk ShedSigned-offJASCO, INC09/09/2019
BISPLISSUEDMASTER 2 PLBG & HTG INC01/12/2023
BISPLISSUEDMASTER 2 PLBG & HTG INC01/12/2022
BIS—ISSUEDAPOLLON CONTRACTING LLC11/17/2021
BIS—ISSUEDAPOLLON CONTRACTING LLC11/17/2021
BISSPISSUEDMASTER PLBG AND HTG INC10/18/2021
BISOTISSUEDVIKRANT KONSTRUCTION CORP01/26/2021
BISPLISSUEDMASTER 2 PLBG & HTG INC01/13/2021
BIS—ISSUEDAPOLLON CONTRACTING LLC12/16/2020
BIS—ISSUEDAPOLLON CONTRACTING LLC12/16/2020
BIS—ISSUEDAPOLLON CONTRACTING LLC12/11/2020
BIS—ISSUEDAPOLLON CONTRACTING LLC12/11/2020
BISSDISSUEDMASTER PLBG AND HTG INC10/09/2020
BIS—ISSUEDAPOLLON CONTRACTING LLC06/04/2020
BISPLISSUEDMASTER 2 PLBG & HTG INC01/13/2020
BIS—RE-ISSUEDAPOLLON CONTRACTING LLC11/25/2019
BIS—ISSUEDAPOLLON CONTRACTING LLC11/14/2019
BISOTISSUEDJDP DESIGN CONSTRUCTION I03/22/2018
3 projects · most recent 05/04/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/04/2026Permit IssuedPETRETTI & ASSOCIATES LLCHeating and Air Conditioning Systems
Heat / Cool
Daikin FXFQ07AAVJU 441 CFM · Ahu ×2
FXSQ09TBVJU 318 CFM · Vrf Indoor ×2
FXSQ12TBVJU 335 CFM · Vrf Indoor ×2
FXSQ15TBVJU 530 CFM · Vrf Indoor ×2
FXAQ18PVJU 500 CFM · Vrf Indoor ×1
FXFQ09AAVJU 441 CFM · Ahu ×1
FXFQ12AAVJU 441 CFM · Vrf Indoor ×1
FXSQ07AVJU 281 CFM · Vrf Indoor ×1
FXSQ30TBVJU 812 CFM · Vrf Indoor ×1
03/04/2026Permit IssuedPETRETTI & ASSOCIATES LLCHeating and Air Conditioning Systems
Heat / Cool
Daikin FXFA18TVJU 20,000 BTU · Vrf Indoor ×4
FXSA24TAVJU 27,000 BTU · Vrf Indoor ×2
FXAA12PVJU 13,500 BTU · Vrf Indoor ×1
FXSA30TAVJU 34,000 BTU · Vrf Indoor ×1
FXSA36TAVJU 40,000 BTU · Vrf Indoor ×1
FXSA48TAVJU 54,000 BTU · Vrf Indoor ×1
07/16/2025Signed-offMOREAIR MECHANICAL SERVICHeating and Air Conditioning Systems
Heat / Cool
Daikin FXSQ30TBVJU 815 CFM · Vrf Indoor ×3
FXSQ48TBVJU 1,300 CFM · Vrf Indoor ×2
FXAQ12PVJU 290 CFM · Vrf Indoor ×1
FXFG18TVJU 740 CFM · Vrf Indoor ×1
FXZQ12TBVJU 350 CFM · Vrf Indoor ×1
3 projects · most recent 05/04/2026
FiledStatusContractorScope
05/04/2026Permit IssuedF.S. WORKS INC112 heads
03/04/2026Permit IssuedA&H EXPRESS PLBG&HTG CORP52 heads
07/16/2025Signed-offA&H EXPRESS PLBG&HTG CORP—
3 projects · most recent 05/04/2026
Water/Sanitary
FiledStatusContractorScope
05/04/2026Signed-offP.H. WORKS INCWater/Sanitary
03/04/2026Signed-offP.H. WORKS INCWater/Sanitary
07/16/2025Signed-offP.H. WORKS INCWater/Sanitary
11 projects · most recent 03/03/2026
General Wiring Lighting
FiledStatusContractorScope
03/03/2026CompleteALLSTATE ELECTRIC CORPGeneral Wiring
10/31/2025Permit IssuedALLSTATE ELECTRIC CORPGeneral Wiring
08/07/2025Permit IssuedALLSTATE ELECTRIC CORPGeneral Wiring
11/19/2024CompleteKENNETH ELECTRIC INCGeneral Wiring
09/30/2021CompleteY.S ELECTRICGeneral Wiring
05/06/2021CompleteY.S ELECTRICGeneral Wiring, Lighting
01/20/2021CompleteY.S ELECTRICGeneral Wiring, Lighting
07/23/2020CompleteNEWBRIDGE ELECTL CONTNG—
11/19/2019CompleteCOMMERCE ELECL CONTRG COR—
09/10/2019CompleteRICHARD NEU—
04/12/2018CompleteLINTECH ELECTRIC, INC.—
▾Field Inspections (DOB CAP) — 22
DateTypeResultReport
07/15/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/15/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/09/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/03/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/28/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/06/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/06/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/05/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/05/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/26/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/16/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/16/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/16/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/18/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/07/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/31/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/28/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/09/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/09/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/07/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/27/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/17/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 53
DateRequirementInspectorRole
04/30/2026Post-installed AnchorsMOLLY GLENNspecial
04/30/2026HVAC-R and service water heating system controlsMOLLY GLENNenergy_progress
04/30/2026Maintenance informationMOLLY GLENNenergy_progress
04/30/2026HVAC-R and service water heating equipmentMOLLY GLENNenergy_progress
04/30/2026HVAC-R and service water piping design and insulationMOLLY GLENNenergy_progress
04/30/2026Sprinkler SystemsMOLLY GLENNspecial
03/05/2026Post-installed AnchorsMOLLY GLENNspecial
03/05/2026Fire-Resistant Penetrations and JointsMOLLY GLENNspecial
03/05/2026HVAC-R and service water piping design and insulationMOLLY GLENNenergy_progress
03/05/2026Sprinkler SystemsMOLLY GLENNspecial
12/16/2025Interior lighting powerMOLLY GLENNenergy_progress
12/16/2025Maintenance informationMOLLY GLENNenergy_progress
12/16/2025Duct leakage testing, insulation and designMOLLY GLENNenergy_progress
12/16/2025HVAC-R and service water heating system controlsMOLLY GLENNenergy_progress
12/16/2025Energy Code Compliance InspectionsMOLLY GLENNprogress
12/16/2025FinalMOLLY GLENNprogress
12/16/2025Post-installed AnchorsMOLLY GLENNspecial
12/16/2025Fire-Resistant Penetrations and JointsMOLLY GLENNspecial
12/16/2025Exhaust and Vent Systems in Plenums and DuctsMOLLY GLENNspecial
12/16/2025Mechanical SystemsMOLLY GLENNspecial
12/16/2025MeteringMOLLY GLENNenergy_progress
12/16/2025Lighting controlsMOLLY GLENNenergy_progress
12/16/2025Shutoff dampersMOLLY GLENNenergy_progress
12/16/2025HVAC-R and service water piping design and insulationMOLLY GLENNenergy_progress
12/16/2025HVAC-R and service water heating equipmentMOLLY GLENNenergy_progress
Latest 25 of 53.
▾Documents — 255 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch16
08/20/2026X01111087-I1Request digital key ↗
08/20/2026X01111087-S2Request digital key ↗
08/20/2026X01111087-S1Request digital key ↗
Showing 3 of 16 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
08/15/2026X00254737-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
08/15/2026X00281530-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/26/2026X00222550-I1Request digital key ↗
▸Applications & Permits48
▸BISPLAN / WORK APPROVAL APPLICATION32
02/09/2023210177734Open ↗
01/12/2023210177734Open ↗
12/14/2022240290109Open ↗
Showing 3 of 32 on file for this type
▸BISWORK PERMIT APPLICATION9
01/26/2021240290109Open ↗
10/09/2020240216627Open ↗
10/09/2020240216627Open ↗
Showing 3 of 9 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
08/23/2022200974856Open ↗
03/16/2022240216627Open ↗
02/08/2018210177734Open ↗
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
11/24/2020240290109Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
06/19/2018240214898Open ↗
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
01/26/2021240290109Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
11/17/2021210177734Open ↗
▸Zoning, Tax Lot & Property Records5
▸BISZONING EXHIBIT I: CERTIFICATION1
02/07/2018210177734Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
02/07/2018210177734Open ↗
▸BISVERIFY TAX LOT1
12/20/2022210177734Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
12/20/2022210177734Open ↗
▸BISZONING DIAGRAM1
04/11/2018210177734Open ↗
▸Seals & Professional Certifications53
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/26/2026X00222550-I1Open ↗
08/26/2026X00254737-I1Open ↗
08/26/2026X00281530-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/23/2026X01333019-S1Open ↗
09/23/2026X01333019-S1Open ↗
09/02/2026X01120700-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/23/2026X01333019-S1Open ↗
09/02/2026X01120700-I1Open ↗
09/01/2026X01333019-P1Open ↗
Showing 3 of 9 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
04/24/2018240214905Open ↗
04/20/2018240214898Open ↗
03/19/2018240216627Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
10/20/2020240290109Open ↗
03/21/2018240217430Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
10/20/2020240290109Open ↗
03/21/2018240217430Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
10/20/2020240290109Open ↗
03/21/2018240217430Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
01/10/2020220723377Open ↗
10/07/2019210177734Open ↗
▸Trade Schedules & Equipment13
▸BISSCHEDULE B - PLUMBING8
05/04/2022240216627Open ↗
04/20/2022240216627Open ↗
02/01/2022240216627Open ↗
Showing 3 of 8 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
02/01/2023210177734Open ↗
02/01/2023210177734Open ↗
12/28/2022210177734Open ↗
▸BISEQUIPMENT USE PERMITS2
02/01/2023210177734Open ↗
02/01/2023210177734Open ↗
▸Safety & Tenant Protection6
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
12/07/2020240290109Open ↗
10/23/2019210177734Open ↗
▸BISSTREET TREE CHECKLIST2
06/19/2018240214898Open ↗
04/09/2018210177734Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
10/20/2020240290109Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026X00222550-I1Open ↗
▸Environmental & Asbestos23
▸DOB NOWDEP ACP-5: Asbestos Assessment Report16
08/20/2026X01120700-S1Open ↗
08/20/2026X01120700-I1Open ↗
08/19/2026X01252661-I1Open ↗
Showing 3 of 16 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
02/27/2020210177734Open ↗
01/10/2020240217430Open ↗
04/25/2018210177734Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
04/25/2018210177734Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
12/27/2022210177734Open ↗
10/22/2020240290109Open ↗
10/20/2020240290109Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
01/10/2020220723377Open ↗
01/10/2020220723377Open ↗
10/11/2019210177734Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
10/20/2020240290109Open ↗
03/21/2018240217430Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/27/2022210177734Open ↗
▸Inspections & Test Reports22
▸BISTECHNICAL REPORT: RESPONSIBILITY18
12/27/2022210177734Open ↗
12/14/2022210177734Open ↗
12/12/2022240216627Open ↗
Showing 3 of 18 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
03/21/2018240217430Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
04/09/2018210177734Open ↗
▸BISHYDRO FLOW TEST LETTER1
08/06/2018240216627Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
12/22/2022210177734Open ↗
▸Approvals, Objections & Sign-offs13
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
02/01/2023210177734Open ↗
01/27/2023210177734Open ↗
01/11/2023240216627Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE5
11/05/2021210177734Open ↗
09/15/2021210177734Open ↗
02/18/2020210177734Open ↗
Showing 3 of 5 on file for this type
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL1
04/09/2018210177734Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
11/13/2019210177734Open ↗
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT7
10/20/2020240290109Open ↗
08/20/2020240216627Open ↗
01/10/2020220723377Open ↗
Showing 3 of 7 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
01/27/2023210177734Open ↗
10/26/2022240216627Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
10/23/2019210177734Open ↗
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
10/18/2022240214898Open ↗
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
09/22/2020240216627Open ↗
▸Filing & Intake Forms25
▸BISADDITIONAL INFORMATION15
01/25/2023210177734Open ↗
05/05/2022240216627Open ↗
04/25/2022240216627Open ↗
Showing 3 of 15 on file for this type
▸BISEFILING COVER SHEET5
01/10/2020220723377Open ↗
03/20/2018220645773Open ↗
12/19/2017210177734Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
10/20/2020240290109Open ↗
04/24/2018240214905Open ↗
04/20/2018240214898Open ↗
Showing 3 of 5 on file for this type
▸Other Documents4
▸BISPLOT DIAGRAM1
02/07/2018210177734Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
04/20/2018240214898Open ↗
▸BISBPP: AS-BUILT SIDEWALK SURVEY1
10/18/2022240214898Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
10/18/2022240214898Open ↗