← Back
Miscellaneous and old-style bank buildings
Hss East River Professional Building
521 EAST 72 STREET · Upper East Side-Lenox Hill-Roosevelt Island · BIN 1046262
💬 Discuss this project
1920Year Built
11Stories
O9Building Class
M1-4Zoning
109,185 sfGross Floor Area
32Units
LL97 CoveredRent Stabilized20 Open Violations ▸FISP: SAFE
Miscellaneous and old-style bank buildings · Owner of record: 521 EAST 72ND ST. REALTY COMPANY II, L.L .C. · 10,216 sf lot · 10.69 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingFire ProtectionGeneral
Roof6p · 2 filings · 13 docs
Bulkhead4p · 1 filing · 9 docs
Penthouse1p · 1 filing · 9 docs
Floor 91p · 1 filing · 9 docs
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 33p · 1 filing · 6 docs
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HIGH POINT CONSTR GROUP1408/21/2026
SOLOW MANAGEMENT5707/08/2026
521 EAST 72ND ST. REALTY COMPANY II, L.L .C.103/22/2026
521 EAST 72ND STREET REALTY4703/22/2026
521 E 72ND REALTY COMPANY103/22/2026
SOLOW RLTY CO103/22/2026
SOLOW203/21/2026
SOLOW REALTY & DEVELOPMENT CO2203/21/2026
SOLO BUILDING COMPANY2203/21/2026
SOLOW REALTY DEVELOPMENT COMP803/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RIZZO GROUP303/21/2026
GREEN STUDIO803/21/2026
MUNICIPAL EXPEDITING203/21/2026
GILLMAN CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HIGH POINT CONSTRUCTIONGeneral Contractor608/21/2026
REITER, LAURENCEElectrical303/21/2026
D Y PLBG & HTG CORPElectrical303/21/2026
MCCAFFREY, SEANElectrical303/21/2026
BLAKE, STEPHENElectrical303/21/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor207/08/2026
WALTER HOFFMAN CORPElectrical103/21/2026
ASHLAR MECHANICAL CORPFire Protection107/08/2026
CAPITOL FIRE SPRINKLER COFire Protection107/08/2026
A.G.S IMPROVEMENTS INCGeneral Contractor107/02/2026
PRESERV BLD RESTOR MGT INGeneral Contractor107/08/2026
ALEXANDER EUGENEElectrical103/21/2026
UNIVERSAL PLUMBING INCPlumbing107/08/2026
DENNIS, BEVONElectrical103/21/2026
GARFINKEL, RUDYElectrical103/21/2026
HEMSING, ROBERTElectrical103/21/2026
ODESSEFS PARASCOElectrical103/21/2026
SHORT, HENRYElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CODEGREEN510210/10/2025
COLE TECHNOLOGIES/CONTROL1290104/23/2020
FUTURE TECH CONSULTANTS O589108/19/2019
Building Lifecycle
All (110)Filed (11)Permit Issued (11)Signed Off (4)Facade (FISP) (16)Violation (60)Special Inspection (8)
08/20/2026
Permit issued — Sidewalk Shed
M01214682-I1-SH
06/30/2026
Signed off — Alteration
GENERAL CONSTRUCTION TAKING PLACE ON 8TH AND 9TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01170986-I1
05/01/2026
Permit issued — Sidewalk Shed
M01214682-I1-SH
01/15/2026
Cycle 10 facade report submitted
01/15/2026
Cycle 10 facade report signed — UNSAFE
12/22/2025
Cycle 10 facade inspection completed
12/19/2025
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED, STAIR TOWER AND HOIST MATERIAL AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01214682-P2
10/10/2025
Filed — Alteration
GENERAL CONSTRUCTION TAKING PLACE ON 8TH AND 9TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01170986-P1
10/10/2025
Special inspection requirement — Post-installed Anchors
HATIM ELSAID
10/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
HATIM ELSAID
10/10/2025
Special inspection requirement — Final
Juan Kuriyama
10/10/2025
Special inspection requirement — Insulation placement and R values
Juan Kuriyama
05/06/2025
Permit issued — General Construction
M01170986-I1-GC
04/28/2025
Permit issued — Supported Scaffold
M01215530-I1-SF
04/25/2025
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED, STAIR TOWER AND HOIST MATERIAL AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01214682-P1
04/25/2025
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING, STAIR TOWER AND HOIST MATERIAL AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01215530-I1
04/23/2025
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED, STAIR TOWER AND HOIST MATERIAL AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01214682-I1
04/23/2025
Permit issued — Sidewalk Shed
M01214682-I1-SH
04/17/2025
Filed — Alteration
GENERAL CONSTRUCTION TAKING PLACE ON 8TH AND 9TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01170986-I1
12/01/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/02/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/21/2024
Violation issued (HPD, open)
C
06/21/2024
Violation issued (HPD, open)
C
05/02/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/01/2024
Violation issued (HPD, closed)
A
11/15/2023
Violation issued (HPD, closed)
I
07/27/2022
Cycle 9 facade report submitted
07/27/2022
Cycle 9 facade report signed — SAFE
07/21/2022
Signed off — Alteration
Facade repair shown on drawings filed herewith. No change in use, egress or occupancy.
M00471750-I1
06/22/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M00686569-I1
06/22/2022
Cycle 9 facade inspection completed
02/24/2022
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M00686569-I1
02/24/2022
Permit issued — Sidewalk Shed
M00686569-I1-SH
02/22/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M00626866-I1
02/22/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/15/2022
Violation issued (HPD, closed)
A
11/09/2021
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M00626866-I1
11/09/2021
Permit issued — Sidewalk Shed
M00626866-I1-SH
11/08/2021
Special inspection requirement — Final
Sunil Saigal
10/18/2021
Permit issued — General Construction
M00471750-I1-GC
04/12/2021
Filed — Alteration
Facade repair shown on drawings filed herewith. No change in use, egress or occupancy.
M00471750-I1
04/01/2021
Violation issued (HPD, closed)
A
02/17/2021
Special inspection requirement — Final
Juan Kuriyama
11/12/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/12/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/12/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/28/2020
Permit issued — Sprinklers
M00342693-I1-EW-SP
04/23/2020
Filed — Alteration
Sprinkler modification to the cellar, Basement, 2nd floor thru 5th floor and 7th thru 8th floors as per plans filed hererwith. No change in use, egress or occupancy.
M00342693-I1
04/17/2020
Special inspection requirement — Sprinkler Systems
GEORGE ANDERSEN
12/23/2019
Violation issued (ECB, closed)
Construction
10/18/2019
Permit issued — Plumbing
M00198291-I1-PL
10/01/2019
Permit issued — Plumbing
M00198291-I1-EW-SP
09/03/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/19/2019
Filed — Alteration
SPRINKLER AND PLUMBING MODIFICATION AT PARTIAL 3RD FLOOR OFFICE AREA AS PER PLANS.
M00198291-I1
07/23/2019
Special inspection requirement — Sprinkler Systems
Stephen Marchese
08/24/2018
Violation issued (HPD, closed)
C
07/18/2018
Violation issued (HPD, closed)
A
07/18/2018
Violation issued (HPD, open)
C
07/18/2018
Violation issued (HPD, closed)
C
07/18/2018
Violation issued (HPD, open)
B
Latest 60 of 110 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedHIGH POINT CONSTRUCTION08/20/2026
DOB NOWSidewalk ShedPermit IssuedHIGH POINT CONSTRUCTION05/01/2026
DOB NOWGeneral ConstructionSigned-offA.G.S IMPROVEMENTS INC05/06/2025
DOB NOWSupported ScaffoldPermit IssuedHIGH POINT CONSTRUCTION04/28/2025
DOB NOWSidewalk ShedPermit IssuedHIGH POINT CONSTRUCTION04/23/2025
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC02/24/2022
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC11/09/2021
DOB NOWGeneral ConstructionSigned-offPRESERV BLD RESTOR MGT IN10/18/2021
DOB NOWSprinklersSigned-offASHLAR MECHANICAL CORP04/28/2020
DOB NOWPlumbingSigned-offUNIVERSAL PLUMBING INC10/18/2019
DOB NOWPlumbingSigned-offCAPITOL FIRE SPRINKLER CO10/01/2019
BISOTISSUEDCNSTR CONTRACT OF NY CORP08/20/2019
BISPLISSUEDM & S MECHANICAL SVCS INC08/01/2018
BISSPISSUEDCAPITOL FIRE SPRINKLER CO03/30/2018
BISPLISSUEDUNIVERSAL PLUMBING INC03/28/2018
BISMHISSUEDCNSTR CONTRACT OF NY CORP03/16/2018
BISOTISSUEDCNSTR CONTRACT OF NY CORP03/16/2018
BISOTISSUEDCNSTR CONTRACT OF NY CORP03/16/2018
BISOTISSUEDPAUL M MAINTENANCE INC02/14/2018
BISOTISSUEDPAUL M MAINTENANCE INC02/14/2018
BISSPISSUEDALLSTATE SPRINKLER LLC06/30/2017
BISPLISSUEDBEDROCK PLBG. & HTG., INC05/02/2017
BISMHISSUEDPAUL M MAINTENANCE INC05/01/2017
BISOTISSUEDPAUL M MAINTENANCE INC05/01/2017
BISPLISSUEDMEGA PLBG CORP02/13/2017
BISSPISSUEDMEGA PLBG CORP02/13/2017
BISOTISSUEDHENRY RESTORATION LTD09/28/2016
BISMHISSUEDJ.P.R. MECHANICAL INC09/23/2016
BISEQISSUEDSPRING SCAFFOLDING LLC09/06/2016
BISOTISSUEDHENRY RESTORATION LTD08/26/2016
BISMHISSUEDMARLIN MECHANICAL INC08/24/2016
BISOTISSUEDSECOND AVE SOLOW DEV CORP08/02/2016
BISOTISSUEDSECOND AVE SOLOW DEV CORP04/14/2016
BISPLISSUEDMEGA PLBG CORP09/29/2015
BISSPISSUEDMEGA PLBG CORP09/29/2015
BISOTISSUEDLINMAR CONSTRUCTION CORP09/21/2015
BISOTISSUEDPHOENIX MEDICAL CONSTRUCT09/21/2015
BISMHISSUEDLINMAR CONSTRUCTION CORP09/21/2015
BISSPISSUEDADVANCED PLUMBING LLC02/11/2015
BISPLISSUEDADVANCED PLBG LLC02/11/2015
+ 21 more permits on file
2 projects · most recent 04/23/2020
FiledStatusContractorScope
04/23/2020Signed-offASHLAR MECHANICAL CORP—
08/19/2019Signed-offCAPITOL FIRE SPRINKLER CO17 heads
1 project · most recent 08/19/2019
Water/Sanitary
FiledStatusContractorScope
08/19/2019Signed-offUNIVERSAL PLUMBING INCWater/Sanitary
7 projects · most recent 06/05/2025
General Wiring Lighting
FiledStatusContractorScope
06/05/2025Permit IssuedHIGH QUALITY ELEC.OF NYC—
05/21/2024CompletePM ELEC'L MAINTENANCE INCGeneral Wiring
11/13/2023CompletePM ELEC'L MAINTENANCE INCGeneral Wiring, Lighting
12/07/2021CompleteBOROWIDE ELECT'L CONTR'S—
07/02/2021CompletePM ELEC'L MAINTENANCE INCGeneral Wiring
01/15/2020CompleteRIGID ELECTRIC, INC.General Wiring
04/16/2018Permit IssuedPM ELEC'L MAINTENANCE INCGeneral Wiring
2 projects · most recent 12/19/2025
Sidewalk Shed Scaffold
FiledStatusContractorScope
12/19/2025Permit IssuedHIGH POINT CONSTRUCTIONSidewalk Shed
04/25/2025Permit IssuedHIGH POINT CONSTRUCTIONScaffold
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
10/10/2025Post-installed AnchorsHATIM ELSAIDspecial
10/10/2025Tenant Protection Plan ComplianceHATIM ELSAIDspecial
10/10/2025FinalJuan Kuriyamaprogress
10/10/2025Insulation placement and R valuesJuan Kuriyamaenergy_progress
11/08/2021FinalSunil Saigalprogress
02/17/2021FinalJuan Kuriyamaprogress
04/17/2020Sprinkler SystemsGEORGE ANDERSENspecial
07/23/2019Sprinkler SystemsStephen Marchesespecial
▾Documents — 760 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch8
09/03/2026M00626866-I1Request digital key ↗
09/02/2026M00686569-I1Request digital key ↗
08/24/2026M01214682-P2Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler2
09/05/2026M00198291-I1Request digital key ↗
09/05/2026M00342693-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/05/2026M00198291-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/03/2026M00471750-I1Request digital key ↗
▸Applications & Permits167
▸BISPLAN / WORK APPROVAL APPLICATION98
10/10/2019123438930Open ↗
10/08/2019123434177Open ↗
09/27/2019123081743Open ↗
Showing 3 of 98 on file for this type
▸BISWORK PERMIT APPLICATION68
08/20/2019123710305Open ↗
11/08/2018123482221Open ↗
09/14/2018123438930Open ↗
Showing 3 of 68 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications182
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION105
10/02/2019123021470Open ↗
10/02/2019123021470Open ↗
10/02/2019123021470Open ↗
Showing 3 of 105 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST25
08/13/2019123710305Open ↗
05/03/2019123482221Open ↗
05/03/2019123482221Open ↗
Showing 3 of 25 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT16
08/13/2019123710305Open ↗
10/29/2018123482221Open ↗
03/07/2018123438930Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/05/2026M00198291-I1Open ↗
09/03/2026M00626866-I1Open ↗
08/24/2026M01214682-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/31/2026M01170986-P1Open ↗
08/31/2026M01170986-P1Open ↗
08/28/2026M00626866-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/14/2026M00342693-I1Open ↗
08/31/2026M01170986-P1Open ↗
08/27/2026M00198291-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment72
▸BISSELF-CERT PLUMBING NOTICE24
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 24 on file for this type
▸BISSCHEDULE B - PLUMBING16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE13
07/25/2018123438930Open ↗
07/23/2018123438930Open ↗
06/29/2018123438930Open ↗
Showing 3 of 13 on file for this type
▸BISEQUIPMENT USE PERMITS8
05/06/2019123482221Open ↗
Showing 1 of 8 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT6
05/06/2019123482221Open ↗
Showing 1 of 6 on file for this type
▸BISSPRINKLER INSP REPORT : FP-853
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
07/12/2021121378339Open ↗
11/15/2017122511718Open ↗
▸Safety & Tenant Protection6
▸BISTenant Protection Plan and Notes3
08/13/2019123710305Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWTenant Protection Plan2
09/05/2026M00198291-I1Open ↗
08/13/2026M00342693-I1Open ↗
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos45
▸BISASBESTOS: CERTIFICATION (DEP ACP5)24
08/13/2019123710305Open ↗
10/29/2018123482221Open ↗
03/07/2018123438930Open ↗
Showing 3 of 24 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/05/2026M00198291-I1Open ↗
08/21/2026M01170986-I1Open ↗
08/13/2026M01170986-P1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance41
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS26
10/02/2019123021470Open ↗
10/02/2019123021470Open ↗
10/02/2019123021470Open ↗
Showing 3 of 26 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
09/10/2020123710305Open ↗
10/02/2019123021470Open ↗
12/17/2018123438930Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
09/10/2020123710305Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports4
▸BISHYDRAULIC FLOW CALCULATIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY2
09/10/2020123710305Open ↗
09/10/2020123710305Open ↗
▸Approvals, Objections & Sign-offs68
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST40
02/17/2022121378339Open ↗
09/10/2020123710305Open ↗
10/02/2019123021470Open ↗
Showing 3 of 40 on file for this type
▸BISADMINISTRATIVE OBJECTIONS16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
10/02/2019123021470Open ↗
12/17/2018123438930Open ↗
Showing 2 of 5 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSUPERSEDING LETTER1
09/14/2018123438930Open ↗
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership55
▸BISCOST AFFIDAVIT54
09/10/2020123710305Open ↗
10/02/2019123021470Open ↗
08/13/2019123710305Open ↗
Showing 3 of 54 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
02/17/2022121378339Open ↗
▸Filing & Intake Forms104
▸BISEFILING COVER SHEET45
08/13/2019123710305Open ↗
10/29/2018123482221Open ↗
03/08/2018123434177Open ↗
Showing 3 of 45 on file for this type
▸BISBOROUGH INTAKE FORM29
10/08/2019123434177Open ↗
10/08/2019123438930Open ↗
10/02/2019123021470Open ↗
Showing 3 of 29 on file for this type
▸BISADDITIONAL INFORMATION27
01/27/2020120785258Open ↗
08/02/2018123438930Open ↗
06/29/2018123438930Open ↗
Showing 3 of 27 on file for this type
▸BISeFiling Job Application Cover Sheet3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Other Documents4
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
09/26/2017140544560Open ↗
Showing 1 of 3 on file for this type
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type