RH. Finlay Hall
521 EAST FORDHAM ROAD · Belmont · BIN 2102024
💬 Discuss this project
1922Year Built
6Stories
W6Building Class
R6Zoning
1,743,584 sfGross Floor Area
1Units
LL97 CoveredRent Stabilized0 Active Violations
Other college and university · Owner of record: Fordham University · 3,392,065 sf lot · 0.51 FAR built · Flood zone X
Locations of Work
Structural
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Site & exteriorFordham University4p · 1 filing · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Fordham University403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Reuther Bowen208/05/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Nyccode403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J.A. Electric Inc D/B/A MidwaElectrical103/21/2026
MLGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Cole Technologies/Control1290208/05/2021
Building Lifecycle
All (10)Filed (2)Permit Issued (1)Signed Off (1)Special Inspection (6)
09/10/2021
Signed off — Alteration
application is filed for exterior work including existing steps and ramp replacement as shown on plans filed herewith. no change to use, egress, or occupancy.
X00534883-I1
08/05/2021
Filed — Alteration
application is filed for exterior work including existing steps and ramp replacement as shown on plans filed herewith. no change to use, egress, or occupancy.
X00534883-P1
08/05/2021
Special inspection requirement — Concrete - Cast-In-Place
GEORGE ANDERSEN
08/05/2021
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
GEORGE ANDERSEN
08/05/2021
Special inspection requirement — Final
GEORGE ANDERSEN
08/03/2021
Special inspection requirement — Concrete - Cast-In-Place
GEORGE ANDERSEN
08/03/2021
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
GEORGE ANDERSEN
08/03/2021
Special inspection requirement — Final
GEORGE ANDERSEN
07/07/2021
Permit issued — Structural
X00534883-I1-ST
07/02/2021
Filed — Alteration
application is filed for exterior work including existing steps and ramp replacement as shown on plans filed herewith. no change to use, egress, or occupancy.
X00534883-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offML07/07/2021
BISSPISSUEDPhoenix Plumbing & Mechanical01/21/2015
BISPLISSUEDWawel Plumbing and Heating01/15/2015
BISMHISSUEDML09/02/2014
1 project · most recent 01/08/2026
FiledStatusContractorScope
01/08/2026Permit IssuedJ.A. Electric Inc D/B/A Midwa—
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
08/05/2021Concrete - Cast-In-PlaceGEORGE ANDERSENspecial
08/05/2021Subsurface Conditions – Fill Placement & In-Place DensityGEORGE ANDERSENspecial
08/05/2021FinalGEORGE ANDERSENprogress
08/03/2021Concrete - Cast-In-PlaceGEORGE ANDERSENspecial
08/03/2021Subsurface Conditions – Fill Placement & In-Place DensityGEORGE ANDERSENspecial
08/03/2021FinalGEORGE ANDERSENprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Fordham UniversityEducation—
Project X00534883 Alteration · LOC Issued · 07/02/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 34 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/25/2026X00534883-I1Request digital key ↗
08/25/2026X00534883-P1Request digital key ↗
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION3
05/04/2015220393394Open ↗
07/10/2014220393394Open ↗
07/10/2014220393394Open ↗
▸BISWORK PERMIT APPLICATION2
01/30/2015220393394Open ↗
09/02/2014220393394Open ↗
▸Seals & Professional Certifications12
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026X00534883-I1Open ↗
09/01/2026X00534883-I1Open ↗
08/25/2026X00534883-P1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
09/02/2014220393394Open ↗
07/10/2014220393394Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/25/2026X00534883-P1Open ↗
08/25/2026X00534883-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026X00534883-I1Open ↗
08/25/2026X00534883-P1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
07/10/2014220393394Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/10/2014220393394Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
05/04/2015220393394Open ↗
07/10/2014220393394Open ↗
07/10/2014220393394Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
05/19/2015220393394Open ↗
05/19/2015220393394Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/25/2026X00534883-P1Open ↗
08/25/2026X00534883-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/10/2014220393394Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
09/02/2014220393394Open ↗
07/10/2014220393394Open ↗
▸Approvals, Objections & Sign-offs2
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/13/2026X00534883-P1Open ↗
08/13/2026X00534883-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
07/10/2014220393394Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
07/10/2014220393394Open ↗
07/10/2014220393394Open ↗