← Back
BuildNYC
Walk-up cooperative
521 WEST 47TH STREET
MANHATTAN · BIN 1026986
💬 Discuss this project
1910Year Built
4Stories
C6Building Class
R8Zoning
21,101 sfGross Floor Area
16Units
Rent Stabilized1 Active Violation 0 unresolved · 1 paperwork only ▸
Walk-up cooperative · Owner of record: The Bakery · 5,021 sf lot · 4.2 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 9 docs
PenthouseUnit PHS4p · 2 filings · 17 docs
Floor 57p · 2 filings · 20 docs
Floor 4Unit 4B, Unit 4C12p · 4 filings · 20 docs
Floor 3Unit 3B3p · 1 filing · 6 docs
Floor 2Unit 2DUnder Construction17p · 1 filing · 12 docs
Floor 1
Cellar1p · 1 filing · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Bakery3603/22/2026
Baker103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Giants in the Dirt208/06/2026
Charlotte Dewald Architect103/10/2026
Spacesmith107/27/2022
AL Ffred Architecture310/28/2021
Anthony Montalto, Architect101/26/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J. Callahan Consulting103/21/2026
Big Orange Expediting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Overall RenovationGeneral Contractor303/21/2026
Master InteriorsGeneral Contractor303/21/2026
Infiniti Esc PlumbingPlumbing107/08/2026
Amor ElectricElectrical103/21/2026
Bent MechanicalPlumbing109/19/2026
DPH Plumbing & HeatingPlumbing107/08/2026
D.s.c.constructionGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Giants in the Dirt9101208/06/2026
Charlotte Dewald Architects7939103/10/2026
Rad Design & Architecture2082310/28/2021
Building Lifecycle
All (70)Filed (8)Permit Issued (7)Signed Off (3)Violation (22)Objection (8)Special Inspection (22)
09/23/2026
Permit issued — General Construction
M01425444-I1-GC
09/18/2026
Permit issued — Plumbing
M01425444-S1-PL
08/11/2026
Objection resolved — Addressed
08/11/2026
Objection resolved — Addressed
08/10/2026
Objection raised — Other
08/10/2026
Objection raised — Other
08/06/2026
Filed — Alteration
Interior renovation of Apt 2D as per plans filed herewith. Related plumbing work filed as a subsequent application. No change to use, egress and occupancy.
M01425444-S1
08/06/2026
Filed — Alteration
Interior renovation of Apt 2D as per plans filed herewith. Related plumbing work filed as a subsequent application. No change to use, egress and occupancy.
M01425444-I1
08/05/2026
Special inspection requirement — Fire-Resistance Rated Construction
ELIZABETH HARDWICK
07/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELIZABETH HARDWICK
07/01/2026
Special inspection requirement — Energy Code Compliance Inspections
ELIZABETH HARDWICK
07/01/2026
Special inspection requirement — Final
ELIZABETH HARDWICK
07/01/2026
Special inspection requirement — Insulation placement and R values
07/01/2026
Special inspection requirement — Lighting in dwelling units
07/01/2026
Special inspection requirement — Interior lighting power
07/01/2026
Special inspection requirement — Lighting controls
07/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELIZABETH HARDWICK
05/11/2026
Permit issued — General Construction
M01337406-I1-GC
03/23/2026
Objection resolved — Addressed
03/18/2026
Objection raised — Admin
03/10/2026
Filed — Alteration
Interior renovation of existing duplex apartment on the 4th floor and penthouse's level. Minor Architectural / Construction only
M01337406-I1
03/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Charlotte Dewald
03/09/2026
Special inspection requirement — Lighting controls
Charlotte Dewald
03/09/2026
Special inspection requirement — Lighting in dwelling units
Charlotte Dewald
03/09/2026
Special inspection requirement — Final
Charlotte Dewald
01/02/2026
Violation issued (HPD, closed)
C
01/02/2026
Violation issued (HPD, closed)
C
09/11/2023
Signed off — Alteration
M00735397-I1
08/16/2022
Permit issued — General Construction
M00735397-I1-GC
07/27/2022
Filed — Alteration
M00735397-I1
06/22/2022
Signed off — Alteration
MODIFICATION/ALTERATION OF EXISTING DUCT. INSTALLATION OF NEW EXHAUST FAN. NO CHANGE IN BULK, EGRESS, OCCUPANCY OR USE OF THE BUILDING.
M00291756-I1
06/22/2022
Signed off — Alteration
Replacement of pl. fixtures on exist. roughing on 4th fl. in bathm and in Library lounge area. Replacement of wc, relocation of sh, relocation of lav and installation of one new lavatory, installation of new Jacuzzi, replacement of kit sink
M00201760-I1
10/31/2021
Permit issued — Mechanical Systems
M00291756-I1-MS
10/29/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Radoslaw Kurek
10/29/2021
Special inspection requirement — HVAC insulation and sealing
Radoslaw Kurek
10/28/2021
Filed — Alteration
Replacement of pl. fixtures on exist. roughing on 4th fl. in bathm and in Library lounge area. Replacement of wc, relocation of sh, relocation of lav and installation of one new lavatory, installation of new Jacuzzi, replacement of kit sink
M00201760-P1
10/28/2021
Special inspection requirement — HVAC insulation and sealing
Radoslaw Kurek
10/28/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Radoslaw Kurek
01/04/2021
Permit issued — Plumbing
M00201760-I1-PL
11/05/2020
Filed — Alteration
MODIFICATION/ALTERATION OF EXISTING DUCT. INSTALLATION OF NEW EXHAUST FAN. NO CHANGE IN BULK, EGRESS, OCCUPANCY OR USE OF THE BUILDING.
M00291756-I1
11/05/2020
Special inspection requirement — Shutoff dampers
Radoslaw Kurek
11/05/2020
Special inspection requirement — Duct leakage testing
Radoslaw Kurek
08/19/2020
Permit issued — Plumbing
M00245357-I1-PL
06/04/2020
Violation issued (ECB, open)
Unknown
03/09/2020
Filed — Alteration
Replacement of pl. fixtures on exist. roughing on 4th fl. in bathm and in Library lounge area. Replacement of wc, relocation of sh, relocation of lav and installation of one new lavatory, installation of new Jacuzzi, replacement of kit sink
M00201760-I1
01/27/2020
Objection raised — Scope
01/27/2020
Objection resolved — Addressed
01/26/2020
Filed — Alteration
Plumbing work as per plans filed herewith no change in use, egress, and occupancy.
M00245357-I1
01/26/2020
Special inspection requirement — Electrical energy consumption
ANTHONY MONTALTO
01/06/2020
Special inspection requirement — Mechanical Systems
Radoslaw Kurek
01/06/2020
Special inspection requirement — Final
Alfred Mierzejewski
11/06/2017
Violation issued (HPD, closed)
I
06/29/2016
Violation issued (HPD, closed)
A
06/29/2016
Violation issued (HPD, closed)
A
06/29/2016
Violation issued (HPD, closed)
A
06/29/2016
Violation issued (HPD, closed)
C
06/29/2016
Violation issued (HPD, closed)
A
01/27/2013
Violation issued (HPD, closed)
C
01/27/2013
Violation issued (HPD, closed)
C
01/27/2013
Violation issued (HPD, closed)
C
Latest 60 of 70 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedRroshi Construction09/23/2026
DOB NOWPlumbingPermit IssuedBent Mechanical09/18/2026
DOB NOWGeneral ConstructionPermit IssuedD.s.c.construction05/11/2026
DOB NOWGeneral ConstructionSigned-offMaster Interiors08/16/2022
DOB NOWMechanical SystemsSigned-offOverall Renovation10/31/2021
DOB NOWPlumbingSigned-offDPH Plumbing & Heating01/04/2021
DOB NOWPlumbingPermit IssuedInfiniti Esc Plumbing08/19/2020
BISOTISSUEDOverall Renovation04/08/2021
BISOTISSUEDOhana Renovations03/08/2021
BISOTISSUEDOhana Renovations12/09/2020
BISOTISSUEDNew York Signs & Awnings12/23/2019
BISOTISSUEDI+D Solutions12/12/2019
BISSPISSUEDUniversal Fire Sprinkler09/06/2019
BISPLISSUEDHudson River Mechanical Group I09/03/2019
BISMHISSUEDBargain Plumbing and Heating05/22/2017
BISOTISSUEDBargain Plumbing and Heating05/22/2017
BISPLISSUEDHudson River Mechanical Group I02/17/2017
BISMHISSUEDBargain Plumbing and Heating01/23/2017
BISPLISSUEDHudson River Mechanical Group I12/14/2015
BISMHISSUEDBargain Plumbing and Heating11/25/2015
BISMHISSUEDBargain Plumbing and Heating07/10/2015
BISOTISSUEDWest New York Restoration of CT05/01/2007
BISEQISSUEDWest New York Restoration of CT12/08/2006
BISPLISSUEDRom Piping & Heating04/12/2005
BISOTISSUEDSantiago Betes and Sons02/28/2005
BISPLISSUEDThe Plumbing Co01/04/2005
2 projects · most recent 08/06/2026
Water/Sanitary Gas
FiledStatusContractorScope
08/06/2026Permit IssuedBent MechanicalGas, Water/Sanitary
01/26/2020Permit IssuedInfiniti Esc PlumbingWater/Sanitary
5 projects · most recent 09/26/2026
General Wiring Lighting
FiledStatusContractorScope
09/26/2026Permit Issued2AK Light ElectricGeneral Wiring
06/23/2022CompleteAmor ElectricGeneral Wiring
11/20/2020CompleteInfinity ElectricGeneral Wiring
02/12/2020Permit IssuedTorelco Electrical ContsGeneral Wiring, Lighting
10/02/2019CompleteMaven ElectricGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
08/05/2026Fire-Resistance Rated ConstructionELIZABETH HARDWICKprogress
07/24/2026Fire-Resistant Penetrations and JointsELIZABETH HARDWICKspecial
07/01/2026Energy Code Compliance InspectionsELIZABETH HARDWICKprogress
07/01/2026FinalELIZABETH HARDWICKprogress
07/01/2026Insulation placement and R values—energy_progress
07/01/2026Lighting in dwelling units—energy_progress
07/01/2026Interior lighting power—energy_progress
07/01/2026Lighting controls—energy_progress
07/01/2026Fire-Resistant Penetrations and JointsELIZABETH HARDWICKspecial
03/09/2026Fire-Resistant Penetrations and JointsCharlotte Dewaldspecial
03/09/2026Lighting controlsCharlotte Dewaldenergy_progress
03/09/2026Lighting in dwelling unitsCharlotte Dewaldenergy_progress
03/09/2026FinalCharlotte Dewaldprogress
10/29/2021Fire-Resistant Penetrations and JointsRadoslaw Kurekspecial
10/29/2021HVAC insulation and sealing Radoslaw Kurekenergy_progress
10/28/2021HVAC insulation and sealing Radoslaw Kurekenergy_progress
10/28/2021Fire-Resistant Penetrations and JointsRadoslaw Kurekspecial
11/05/2020Shutoff dampersRadoslaw Kurekenergy_progress
11/05/2020Duct leakage testing Radoslaw Kurekenergy_progress
01/26/2020Electrical energy consumptionANTHONY MONTALTOenergy_progress
01/06/2020Mechanical SystemsRadoslaw Kurekspecial
01/06/2020FinalAlfred Mierzejewskiprogress
▾Documents — 205 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch4
09/02/2026M00735397-I1Request digital key ↗
08/18/2026M01337406-I1Request digital key ↗
08/14/2026M01425444-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/05/2026M00201760-I1Request digital key ↗
08/15/2026M00245357-I1Request digital key ↗
08/15/2026M00201760-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00291756-I1Request digital key ↗
▸Applications & Permits30
▸BISPLAN / WORK APPROVAL APPLICATION15
04/30/2022140953234Open ↗
08/31/2021140836120Open ↗
11/12/2020140953234Open ↗
Showing 3 of 15 on file for this type
▸BISWORK PERMIT APPLICATION14
04/08/2021140953234Open ↗
12/09/2020140953234Open ↗
12/20/2019140881767Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWHPD Certification Letter or CPC Special Permit1
08/14/2026M01425444-I1Open ↗
▸Seals & Professional Certifications44
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
11/21/2019123791398Open ↗
08/22/2019140836120Open ↗
06/20/2017122459810Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/04/2026M00291756-I1Open ↗
09/02/2026M00735397-I1Open ↗
08/18/2026M01337406-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026M00201760-I1Open ↗
09/01/2026M00245357-I1Open ↗
08/24/2026M00201760-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026M00201760-I1Open ↗
08/24/2026M00201760-P1Open ↗
08/23/2026M01337406-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
12/20/2019140881767Open ↗
07/16/2015122459810Open ↗
▸BISAPPLICANT OWNER SIGNATURE2
09/29/2020140953234Open ↗
03/14/2019140836120Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
05/24/2017122459810Open ↗
05/12/2017122459810Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
09/29/2020140953234Open ↗
12/20/2019140881767Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
12/20/2019140881767Open ↗
▸Trade Schedules & Equipment12
▸BISEQUIPMENT USE APPLICATION/PERMIT6
06/27/2017122459810Open ↗
06/27/2017122459810Open ↗
06/27/2017122459810Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
10/21/2016122459810Open ↗
10/20/2016122459810Open ↗
07/01/2016122459810Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING1
03/14/2019140836120Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
06/22/2022140953234Open ↗
▸Safety & Tenant Protection21
▸DOB NOWHPD-2: Clinton Special District Anti-Harassment Checklist7
09/04/2026M00291756-I1Open ↗
08/14/2026M01425444-S1Open ↗
08/14/2026M01425444-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES4
11/22/2020140953234Open ↗
12/20/2019140881767Open ↗
03/14/2019140836120Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTenant Protection Plan4
09/04/2026M00291756-I1Open ↗
08/13/2026M00201760-P1Open ↗
08/13/2026M00245357-I1Open ↗
Showing 3 of 4 on file for this type
▸BISCLINTON DISTRICT: ANTI-HARASSMENT CHECKLIST2
11/22/2020140953234Open ↗
12/20/2019140881767Open ↗
▸BISANTI-HARASSMENT CHECKLIST: CLINTON1
07/23/2015122459810Open ↗
▸BISANTI-HARASSMENT CHECKLIST1
06/10/2019140836120Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
11/22/2020140953234Open ↗
▸DOB NOWCertificate of No Harassment1
08/14/2026M01425444-I1Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/04/2026M00291756-I1Open ↗
09/02/2026M00735397-I1Open ↗
08/18/2026M01337406-I1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
11/12/2020140953234Open ↗
12/13/2019123791398Open ↗
03/14/2019140836120Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance26
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
10/05/2021140836120Open ↗
05/21/2021123791398Open ↗
12/09/2020140953234Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
11/21/2019123791398Open ↗
08/22/2019140836120Open ↗
06/20/2017122459810Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
06/22/2022140953234Open ↗
05/21/2021123791398Open ↗
08/17/2020140881767Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
09/29/2020140953234Open ↗
12/20/2019140881767Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
10/05/2021140836120Open ↗
06/20/2017122459810Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
06/22/2022140953234Open ↗
▸BISFENESTRATION AREAS1
06/22/2022140953234Open ↗
▸BISFENESTRATION AIR LEAKAGE1
06/22/2022140953234Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
06/22/2022140953234Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
06/22/2022140953234Open ↗
▸BISLIGHTING CONTROLS1
06/22/2022140953234Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
06/22/2022140953234Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
11/22/2020140953234Open ↗
▸BISINTERIOR LIGHTING POWER1
06/22/2022140953234Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026M00735397-I1Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY7
10/05/2021140836120Open ↗
05/21/2021123791398Open ↗
12/09/2020140953234Open ↗
Showing 3 of 7 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
06/22/2022140953234Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
06/22/2022140953234Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
06/22/2022140953234Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
06/22/2022140953234Open ↗
▸BISMECHANICAL SYSTEMS1
06/22/2022140953234Open ↗
▸Approvals, Objections & Sign-offs13
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
06/23/2022140953234Open ↗
11/15/2021140836120Open ↗
10/05/2021140836120Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
05/31/2019140836120Open ↗
08/01/2017122459810Open ↗
08/01/2017122459810Open ↗
▸BISFINAL2
06/22/2022140953234Open ↗
08/17/2020140881767Open ↗
▸BISSUPERSEDING LETTER1
04/08/2021140953234Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT7
10/05/2021140836120Open ↗
09/29/2020140953234Open ↗
12/20/2019140881767Open ↗
Showing 3 of 7 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
06/22/2022140953234Open ↗
05/21/2021123791398Open ↗
08/17/2020140881767Open ↗
▸Filing & Intake Forms12
▸BISADDITIONAL INFORMATION6
09/10/2021140836120Open ↗
12/03/2020140953234Open ↗
06/10/2019140836120Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
09/29/2020140953234Open ↗
12/20/2019140881767Open ↗
03/14/2019140836120Open ↗
▸BISEFILING COVER SHEET2
11/21/2019123791398Open ↗
07/17/2015122459810Open ↗
▸BISBOROUGH INTAKE FORM1
04/08/2021140953234Open ↗
▸Other Documents5
▸BISCLINTON DIST: HPD CERT COMPLETION LOW-INCOME HOUSING1
12/13/2019123791398Open ↗
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
06/22/2022140953234Open ↗
▸BISDUCT DESIGN, INSULATION AND LEAKAGE TESTING1
06/22/2022140953234Open ↗
▸BISSMOKE CONTROL SYSTEMS1
06/22/2022140953234Open ↗
▸BISSHUTOFF DAMPERS1
06/22/2022140953234Open ↗