| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 04/30/2026 | Permit Issued | FOLOR INC | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Ventilation Greenheck SQ-100-VG 600 CFM · Exhaust Fan ×1 |
| 04/15/2026 | Signed-off | MSV BUILDERS LLC | Heating and Air Conditioning Systems | Heat / Cool |
| 11/25/2025 | Permit Issued | WHALEN CONSTRUCTION, INC | Heating and Air Conditioning Systems | Heat / Cool |
| 03/28/2025 | Signed-off | COLGATE RESTORATION CORP | Air Conditioning Systems, Ventilation Systems |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/30/2026 | Permit Issued | THOMAS FAY | Sprinkler System |
| 03/28/2025 | Signed-off | AGIUS PLUMBING & HTG INC | 47 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/25/2025 | Permit Issued | HYDRONIC CONCEPTS NY PLBG | Water/Sanitary |
| 03/28/2025 | Signed-off | COASTLINE PLUMBING & HTG | Gas, Water/Sanitary |
| 02/14/2025 | — | — | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/12/2026 | Permit Issued | CONTROL ELEC'L CONT'G COR | General Wiring |
| 04/21/2026 | Permit Issued | BIG SHOT ELECTRIC CORP. | General Wiring |
| 03/30/2026 | Permit Issued | JOSEPH WEINSTEIN ELECTRIC | General Wiring |
| 03/23/2026 | Permit Issued | CONTROL ELEC'L CONT'G COR | General Wiring |
| 10/02/2025 | Complete | EMPIRE STATE ELECTL CORP | General Wiring |
| 06/16/2025 | Complete | JORDEN-ASH ELECTRIC CORP | — |
| 08/13/2024 | Complete | ALBA ELECTRIC CORP | General Wiring |
| 06/05/2024 | Complete | ACCURATE ELEC'L CONTR'S C | General Wiring |
| 05/10/2024 | Complete | JOSEPH WEINSTEIN ELECTRIC | General Wiring |
| 03/07/2024 | Complete | ACCURATE ELEC'L CONTR'S C | General Wiring |
| 03/07/2024 | Complete | ACCURATE ELEC'L CONTR'S C | General Wiring |
| 03/07/2024 | Complete | ACCURATE ELEC'L CONTR'S C | General Wiring |
| 02/16/2024 | Complete | ACCURATE ELEC'L CONTR'S C | General Wiring |
| 02/16/2024 | Complete | ACCURATE ELEC'L CONTR'S C | General Wiring |
| 02/16/2024 | Complete | ACCURATE ELEC'L CONTR'S C | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/25/2025 | Permit Issued | WHALEN CONSTRUCTION, INC | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/15/2023 | Signed-off | ANDAMIO SCAFFOLDING LLC | Sidewalk Shed |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/25/2025 | Permit Issued | WHALEN CONSTRUCTION, INC | Tenant Protection Plan 72 Hour |
| Owner | Filings | Most Recent |
|---|---|---|
| RELIABLE ENTERPRISES | 6 | 03/22/2026 |
| 95-97 HORATIO | 205 | 03/22/2026 |
| ATLAS CONSTRUCTION LLC | 2 | 03/22/2026 |
| 97 ORATIO STREET COMPANY | 1 | 03/22/2026 |
| 97 HORATIO STREET CO | 2 | 03/22/2026 |
| ROCKROSE DEVELOPMENT | 26 | 03/22/2026 |
| URBAN FOUNDATION ENGINEER | 3 | 03/22/2026 |
| THE CHELSEA MERCANTILE CONDO | 2 | 03/21/2026 |
| 95-97 HORATIO LLC TF CORNERSTON | 9 | 03/21/2026 |
| 95 HORATIO LLC C/O ROCKROSE DEVE | 3 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| ROSINI ENGINEERING, PC | 3 | 04/30/2026 |
| DOWNTOWN ENGINEERS | 1 | 04/15/2026 |
| THOMAS W HUT ARCHITECT PLLC | 2 | 03/23/2026 |
| RAAD | 2 | 11/25/2025 |
| SCHNACKEL ENGINEERS | 12 | 10/22/2025 |
| ALLEN + KILLCOYNE ARCHITECTS LLP | 1 | 06/17/2025 |
| WALKER CONSULTANTS | 1 | 06/17/2025 |
| LAURENCE G. JONES ARCHITECTS, PLLC | 12 | 03/28/2025 |
| PAUL PERDEK, PROF. ENG. PLLC | 3 | 01/22/2025 |
| VALERIO ARCHITECTS | 7 | 10/21/2024 |
| STEVEN R. SAVINO ARCHITECT PC | 1 | 01/12/2024 |
| ALTAGRACIA ESTHER MARTINEZ, R.A. | 2 | 11/28/2023 |
| ALWAYS FAST SERVICES CORP | 1 | 06/15/2023 |
| JOSE M. LANDAURO, P.E. | 3 | 06/08/2023 |
| TWIG CONSULTING ENGINEERS PC | 7 | 01/20/2023 |
| DAN IONESCU | 2 | 11/23/2022 |
| ENTHINK ENGINEERS LLC | 7 | 02/25/2022 |
| MIRELLA BOSELLI ARCHITECT | 4 | 08/23/2021 |
| ANDREW FORMICHELLA | 1 | 06/20/2019 |
| Representative | Filings | Most Recent |
|---|---|---|
| VALERIO ARCHITECTS | 14 | 03/21/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 3 | 03/21/2026 |
| AE DESIGN SOLUTION | 10 | 03/21/2026 |
| JAM CONSULTANTS, INC. | 8 | 03/21/2026 |
| PAUL FUSCO CONSULTING | 24 | 03/21/2026 |
| RIGHT WAY SERVICES NYC | 6 | 03/21/2026 |
| DAN IONESCU ARCHITECTS | 7 | 03/21/2026 |
| RIP CC | 8 | 03/21/2026 |
| CODE | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| MICHILLI INC | General Contractor | 12 | 07/08/2026 |
| ANDAMIO SCAFFOLDING LLC | General Contractor | 11 | 08/27/2026 |
| ALL DIMENSION HOME IMPROVEMENT | General Contractor | 9 | 07/08/2026 |
| ATLAS CONSTRUCTION OF NY | General Contractor | 7 | 07/08/2026 |
| PDH DESIGN AND CONSTRUCT | General Contractor | 5 | 07/08/2026 |
| WHALEN CONSTRUCTION, INC | General Contractor | 4 | 08/12/2026 |
| AFFINITY BUILDING SOLUTIO | General Contractor | 3 | 07/08/2026 |
| XCLUSIVE KITCHEN VENTILAT | General Contractor | 3 | 03/21/2026 |
| RELIABLE ENTERPRISES INC | General Contractor | 3 | 03/21/2026 |
| FOLOR INC | General Contractor | 2 | 06/02/2026 |
| MASPETH CONTRACTING CORP | General Contractor | 2 | 04/09/2026 |
| FULL CAPACITY FIRE CORP | Fire Protection | 2 | 07/08/2026 |
| COASTLINE PLUMBING & HTG | Plumbing | 1 | 07/08/2026 |
| HYDROKINETIC PLBG & HTG I | Plumbing | 1 | 07/08/2026 |
| HYDRONIC CONCEPTS NY P&H | Plumbing | 1 | 07/08/2026 |
| HYDRONIC CONCEPTS NY PLBG | Plumbing | 1 | 07/08/2026 |
| ACCURATE ELEC'L CONTR'S C | Electrical | 1 | 03/22/2026 |
| SOLUTION MECH CONTNG LLC | Plumbing | 1 | 07/08/2026 |
| JLC ELEC'L CONTR'G INC | Electrical | 1 | 03/22/2026 |
| RICHARD NEU | Electrical | 1 | 03/22/2026 |
| AGGRESSIVE FIRE PROT LLC | Fire Protection | 1 | 07/08/2026 |
| AGIUS PLUMBING & HTG INC | Fire Protection | 1 | 07/08/2026 |
| ANESIS SERVICES CORP | Fire Protection | 1 | 07/08/2026 |
| AFGO MECHANICAL SVCS INC | General Contractor | 1 | 07/08/2026 |
| CHAMPION MECHANICAL INC | General Contractor | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| CHEN ENGINEERING SERVICES | 1826 | 5 | 04/30/2026 |
| ROSINI ENGINEERING, PC | 3282 | 2 | 04/30/2026 |
| DOWNTOWN ENGINEERS | 9711 | 1 | 04/15/2026 |
| PSI AGENCY INC. | 254 | 4 | 11/25/2025 |
| DOMANI INSPECTION SERVICE | 843 | 15 | 10/22/2025 |
| SCHNACKEL ENGINEERS | 1821 | 8 | 10/22/2025 |
| ALLEN+KILLCOYNE ARCHITECT | 2697 | 1 | 06/17/2025 |
| CHRISTIE ENGINEERING, P.C | 5795 | 3 | 03/28/2025 |
| TSF ENGINEERING, PC | 1274 | 8 | 03/28/2025 |
| LAURENCE G. JONES ARCHITE | 5560 | 6 | 02/11/2025 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sidewalk Shed | Signed-off | ANDAMIO SCAFFOLDING LLC | 08/26/2026 |
| DOB NOW | General Construction | Permit Issued | WHALEN CONSTRUCTION, INC | 08/11/2026 |
| DOB NOW | Mechanical Systems | Signed-off | MSV BUILDERS LLC | 06/10/2026 |
| DOB NOW | Sidewalk Shed | Signed-off | ANDAMIO SCAFFOLDING LLC | 06/01/2026 |
| DOB NOW | Sprinklers | Permit Issued | ANESIS SERVICES CORP | 05/07/2026 |
| DOB NOW | Plumbing | Signed-off | HYDROKINETIC PLBG & HTG I | 05/06/2026 |
| DOB NOW | General Construction | Permit Issued | YATZIV CORP | 04/21/2026 |
| DOB NOW | Structural | Signed-off | COLGATE RESTORATION CORP | 04/09/2026 |
| DOB NOW | General Construction | Permit Issued | FOLOR INC | 03/20/2026 |
| DOB NOW | Structural | Permit Issued | WHALEN CONSTRUCTION, INC | 03/03/2026 |
| DOB NOW | Plumbing | Permit Issued | HYDRONIC CONCEPTS NY PLBG | 02/18/2026 |
| DOB NOW | General Construction | Permit Issued | WHALEN CONSTRUCTION, INC | 02/05/2026 |
| DOB NOW | Plumbing | Permit Issued | HYDRONIC CONCEPTS NY P&H | 01/22/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | WHALEN CONSTRUCTION, INC | 01/20/2026 |
| DOB NOW | Mechanical Systems | Signed-off | MICHILLI INC | 10/30/2025 |
| DOB NOW | General Construction | Signed-off | ATLAS CONSTRUCTION OF NY | 06/11/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | ATLAS CONSTR OF NY , INC | 06/10/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | ANDAMIO SCAFFOLDING LLC | 06/02/2025 |
| DOB NOW | Sprinklers | Signed-off | FULL CAPACITY FIRE CORP | 03/14/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | ATLAS CONSTRUCTION OF NY | 02/27/2025 |
| DOB NOW | Structural | Signed-off | SOVA CONSTRUCTION INC | 02/26/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | ATLAS CONSTR OF NY , INC | 02/10/2025 |
| DOB NOW | General Construction | Signed-off | MICHILLI INC | 01/15/2025 |
| DOB NOW | Mechanical Systems | Signed-off | MICHILLI INC | 01/10/2025 |
| DOB NOW | General Construction | Signed-off | MICHILLI INC | 01/10/2025 |
| DOB NOW | Mechanical Systems | Signed-off | MICHILLI INC | 11/02/2024 |
| DOB NOW | Sprinklers | Signed-off | AGIUS PLUMBING & HTG INC | 10/31/2024 |
| DOB NOW | Construction Fence | Signed-off | MICHILLI INC | 10/22/2024 |
| DOB NOW | Mechanical Systems | Signed-off | CHAMPION MECHANICAL | 10/15/2024 |
| DOB NOW | Sprinklers | Signed-off | FULL CAPACITY FIRE CORP | 10/09/2024 |
| DOB NOW | Plumbing | Signed-off | COASTLINE PLUMBING & HTG | 08/15/2024 |
| DOB NOW | Mechanical Systems | Signed-off | PDH DESIGN AND CONSTRUCT | 08/14/2024 |
| DOB NOW | General Construction | Signed-off | PDH DESIGN AND CONSTRUCT | 08/02/2024 |
| DOB NOW | Suspended Scaffold | Permit Issued | ATLAS CONSTR OF NY , INC | 07/30/2024 |
| DOB NOW | General Construction | Signed-off | MICHILLI INC | 07/26/2024 |
| DOB NOW | General Construction | Signed-off | MICHILLI INC | 07/26/2024 |
| DOB NOW | Sidewalk Shed | Signed-off | ANDAMIO SCAFFOLDING LLC | 06/12/2024 |
| DOB NOW | General Construction | Signed-off | ATLAS CONSTRUCTION OF NY | 06/05/2024 |
| DOB NOW | Supported Scaffold | Signed-off | ATLAS CONSTRUCTION OF NY | 06/05/2024 |
| DOB NOW | General Construction | Signed-off | PDH DESIGN AND CONSTRUCT | 04/19/2024 |
| Date | Type | Result | Report |
|---|---|---|---|
| 07/24/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 07/22/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 06/24/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/23/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 06/05/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/27/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/27/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/27/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 05/12/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/18/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 03/11/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/31/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 12/29/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 10/21/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 10/08/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 05/07/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 05/02/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 02/02/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 01/14/2025 | Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test | Certified | View ↗ |
| 12/09/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 11/14/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/15/2024 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 02/02/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/02/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 11/29/2022 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 04/30/2026 | Tenant Protection Plan Compliance | HENLIA CHEN | special |
| 04/11/2026 | Tenant Protection Plan Compliance | Raimundo Ramos | special |
| 04/06/2026 | HVAC-R and service water heating equipment | Raimundo Ramos | energy_progress |
| 04/06/2026 | Maintenance information | Raimundo Ramos | energy_progress |
| 04/06/2026 | Energy Code Compliance Inspections | Raimundo Ramos | progress |
| 04/06/2026 | HVAC-R and service water heating system controls | Raimundo Ramos | energy_progress |
| 04/02/2026 | Post-installed Anchors | Raimundo Ramos | special |
| 03/31/2026 | Mechanical Systems | Raimundo Ramos | special |
| 03/31/2026 | Final | Raimundo Ramos | progress |
| 03/13/2026 | Fire-Resistance Rated Construction | HENLIA CHEN | progress |
| 03/09/2026 | Tenant Protection Plan Compliance | HENLIA CHEN | special |
| 03/09/2026 | Fire-Resistant Penetrations and Joints | HENLIA CHEN | special |
| 03/09/2026 | Final | Thomas Hut | progress |
| 10/31/2025 | Fire-Resistant Penetrations and Joints | MAURICIO ANDRADE | special |
| 10/31/2025 | Fire-Resistant Penetrations and Joints | MAURICIO ANDRADE | special |
| 09/09/2025 | Tenant Protection Plan Compliance | JOHN MCMONAGLE | special |
| 09/09/2025 | Sprinkler Systems | Gregory Schnackel | special |
| 06/27/2025 | Sprinkler Systems | Gregory Schnackel | special |
| 06/27/2025 | Tenant Protection Plan Compliance | JOHN MCMONAGLE | special |
| 06/16/2025 | Structural Steel - Welding | MAURICIO ANDRADE | special |
| 06/16/2025 | Structural Stability – Alterations of existing buildings | MAURICIO ANDRADE | special |
| 06/16/2025 | Structural Steel - High Strength Bolting | MAURICIO ANDRADE | special |
| 06/12/2025 | Final | MAURICIO ANDRADE | progress |
| 06/12/2025 | Mechanical Systems | MAURICIO ANDRADE | special |
| 06/12/2025 | Structural Steel - Details | MAURICIO ANDRADE | special |