DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
DOB11/08/2019VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
DOB01/09/2019FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB01/09/2019FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB01/09/2019FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB09/28/2018WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS &/OR APPROVEDAMENDMENTS. OBSERVED WORK CONTRARY TO APPROVED PLANS#340287754 WHICH DOES NOT SHOW NEW ALTERATION OF FRONT STORE,BLDG ENTRANCE WAS ALTERED$2K due
ECB09/28/2018WORK W/O A PERMIT. NEWLY/RECENTLY INSTALLED SIGNS APPROX 40FEET X 3FEET IDENTIFYING STORE AS "ELNHORNS" SIGN HAS BEEN INSTALLED ON BLDG SOFFIT. REMEDY: OBTAIN ALL REQUIRED PERMITS.$1K due
ECB09/28/2018FAILURE TO MAINTAIN BLDG IN CODE COMPLAINT MANNER. NO FIRE STOPPING PER BC 712.3;27-345. NOTED: OBSERVED AT GROUND LEVEL COMMERCIAL SPACE,FIRE PROOFING PARTY WALL WAS COMPLETELY DEMOLISHED TO CONNECT THE BLDG$12K due
ECB09/28/2018WORK W/O A PERMIT. OBSERVED NEWLY/RECENTLY ERECTED CANOPY WHICH IS INSTALLED & ATTACHED TO THE BLDG,APPROX 6FEET X 40FEET IN LENGTH,CONSISTING OF TRANSPARENT ROOF PANEL & SUPPORTED W/4 POLES. PROJECTING APPROX$2K due
DOB04/06/2018VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
DOB02/24/2017VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
DOB10/01/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
DOB01/03/2008V-DOB VIOLATION - ACTIVE
DOB01/19/2007V-DOB VIOLATION - ACTIVE
DOB03/19/2003V-DOB VIOLATION - ACTIVE
DOB03/26/2002V-DOB VIOLATION - ACTIVE
DOB02/27/2001V-DOB VIOLATION - ACTIVE
DOB02/07/2000V-DOB VIOLATION - ACTIVE
DOB05/04/1998V-DOB VIOLATION - ACTIVE
DOB09/16/1997V-DOB VIOLATION - ACTIVE
DOB02/10/1997V-DOB VIOLATION - ACTIVE