← Back
BuildNYC
Two family frame
522 DRUMGOOLE ROAD EAST
STATEN ISLAND · BIN 5174462
💬 Discuss this project
2020Year Built
2Stories
B2Building Class
R3AZoning
2,958 sfGross Floor Area
2Units
Two family frame · 4,950 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 22p · 1 filing · 7 docs
Floor 1Curb cut installation on Drumgoole Rd East4p · 2 filings · 9 docs
Cellar1p · 1 filing · 7 docs
Sub-Basement2p · 1 filing · 7 docs
Site & exterior1p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NC 526203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Anselmo S. Genovese Architect409/08/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Fatima Falconetti Expeditor403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Brooklyn Block HoldingScaffold303/21/2026
Fine MechanicalPlumbing207/08/2026
Brooklyn Block HoldingGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A Tech Engineering NYC, P6738209/08/2021
Building Lifecycle
01/05/2022
Signed off — Alteration
INSTALLATION OF NEW 14'-0" CURB CUT WITH (2) 18" SPLAYS FOR A TOTAL OF 17'-0"
S00335125-I1
01/04/2022
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
12/16/2021
Permit issued — Curb Cut
S00335125-I1-CC
11/30/2021
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
11/17/2021
Signed off — Alteration
S00335204-I1
16 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offBrooklyn Block Holding12/16/2021
DOB NOWPlumbingSigned-offFine Mechanical11/03/2021
DOB NOWPlumbingSigned-offFine Mechanical09/23/2020
DOB NOWConstruction FenceSigned-offBrooklyn Block Holding07/02/2020
BIS—ISSUEDBrooklyn Block Holding06/29/2021
BIS—ISSUEDBrooklyn Block Holding07/02/2020
1 project · most recent 09/20/2020
General Wiring
FiledStatusContractorScope
09/20/2020CompleteA. J. Caruso Electrical IGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
01/04/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
11/30/2021Pass-Final Boiler Equipment InspectionPassView ↗
60 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account