← Back
Condo, residential unit in 2-10 unit building
522 STATE STREET
BROOKLYN · BIN 3000776
💬 Discuss this project
1899Year Built
4Stories
R1Building Class
R6BZoning
5,348 sfGross Floor Area
4Units
Rent Stabilized2 Open Violations ▸
Condo, residential unit in 2-10 unit building · Owner of record: 522 STATE LLC · 3,400 sf lot · 1.57 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Roof3p · 1 filing · 15 docs
Floor 434p · 1 filing · 20 docs
Floor 335p · 2 filings · 20 docs
Floor 235p · 1 filing · 20 docs
Floor 136p · 2 filings · 20 docs
Cellar34p · 2 filings · 20 docs
Basement33p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DIVI507/08/2026
RELIABLE ENTERPRISES804/08/2026
PEEPS SERVICES103/22/2026
EXCEL DEVELOPMENT GROUP103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KMP DESIGN & ENGINEERING PLLC1209/10/2024
ENTHINK ENGINEERS LLC203/14/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KMP DESIGN ENGINEERING2403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PEEPS SERVICES INCGeneral Contractor607/08/2026
RELIABLE ENTERPRISES INCGeneral Contractor404/08/2026
NYC BUILDING SOLUTIONS COGeneral Contractor307/08/2026
MEGA PLBG CORPFire Protection107/08/2026
ULTIMATE PAVERS CORPGeneral Contractor104/08/2026
MEGA PLBG CORPPlumbing107/08/2026
VSP MECHANICAL INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IP CONCRETE TESTING AND I62521109/10/2024
Building Lifecycle
All (127)Filed (14)Permit Issued (13)Signed Off (7)Violation (7)Inspection (8)Objection (48)Special Inspection (30)
05/06/2026
Violation issued (HPD, open)
A
11/22/2024
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00831854-I1
11/22/2024
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00843670-I1
11/21/2024
Signed off — Alteration
FILING FOR SPRINKLER WORKTYPE IN CONJUNCTION WITH JOB # B00749796.
B00796332-I1
11/18/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
RENOVATE EXISTING 4-STORY RESIDENTIAL BUILDING TO CONVERT FROM 2-DWELLING UNITS TO 4-CLASS "A" APARTMENTS. RAISE BASEMENT FLOOR TO BECOME 1ST FLOOR AND CHANGE CONSTRUCTION CLASS TO 1B.
B00749796-S1
11/08/2024
Signed off — Alteration
B00766741-I1
10/18/2024
Signed off — Alteration
PLUMBING WORK TYPE ONLY ON RENOVATE EXIST. 4-STORY RESIDENTIAL BUILDING TO CONVERT FROM 2-DWELLING UNITS TO 4-CLASS "A"APARTMENTS. RAISE BASEMENT FLOOR TO BECOME 1ST FLOOR AND CHANGE CONSTRUCTION CLASS TO 1-B.
B00766877-I1
10/16/2024
Signed off — Alteration
INSTALLATION OF 8 F.T. TEMPORARY WOOD CONSTRUCTION FENCE.
B00700712-I1
10/02/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/19/2024
Objection resolved — Addressed
09/18/2024
Objection raised — Scope
09/10/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
RENOVATE EXISTING 4-STORY RESIDENTIAL BUILDING TO CONVERT FROM 2-DWELLING UNITS TO 4-CLASS "A" APARTMENTS. RAISE BASEMENT FLOOR TO BECOME 1ST FLOOR AND CHANGE CONSTRUCTION CLASS TO 1B.
B00749796-P5
09/09/2024
Special inspection requirement — Electrical motors and elevators
INDARDEO PARBHUNATH
09/09/2024
Special inspection requirement — Lighting controls
INDARDEO PARBHUNATH
09/09/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
INDARDEO PARBHUNATH
09/09/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
09/09/2024
Special inspection requirement — Air barrier - visual inspection
09/09/2024
Special inspection requirement — Energy Code Compliance Inspections
INDARDEO PARBHUNATH
09/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
09/09/2024
Special inspection requirement — Fenestration areas
09/09/2024
Special inspection requirement — Exterior lighting power
INDARDEO PARBHUNATH
09/09/2024
Special inspection requirement — Insulation placement and R values
INDARDEO PARBHUNATH
09/09/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
INDARDEO PARBHUNATH
09/09/2024
Special inspection requirement — HVAC-R and service water heating system controls
INDARDEO PARBHUNATH
09/09/2024
Special inspection requirement — HVAC-R and service water heating equipment
INDARDEO PARBHUNATH
09/09/2024
Special inspection requirement — Fenestration air leakage
09/03/2024
Special inspection requirement — Structural Steel - Details
INDARDEO PARBHUNATH
09/03/2024
Special inspection requirement — Masonry
INDARDEO PARBHUNATH
09/03/2024
Special inspection requirement — Post-installed Anchors
INDARDEO PARBHUNATH
09/03/2024
Special inspection requirement — Final
NAVEEN KUMAR
09/03/2024
Special inspection requirement — Structural Steel - Welding
INDARDEO PARBHUNATH
09/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
09/03/2024
Special inspection requirement — Structural Cold-Formed Steel
INDARDEO PARBHUNATH
09/03/2024
Special inspection requirement — Structural Steel - High Strength Bolting
INDARDEO PARBHUNATH
08/24/2024
Objection resolved — Addressed
08/06/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
RENOVATE EXISTING 4-STORY RESIDENTIAL BUILDING TO CONVERT FROM 2-DWELLING UNITS TO 4-CLASS "A" APARTMENTS. RAISE BASEMENT FLOOR TO BECOME 1ST FLOOR AND CHANGE CONSTRUCTION CLASS TO 1B.
B00749796-P4
08/05/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
INDARDEO PARBHUNATH
08/05/2024
Special inspection requirement — Air barrier - visual inspection
08/05/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
08/05/2024
Special inspection requirement — Exterior lighting power
INDARDEO PARBHUNATH
08/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
08/05/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
INDARDEO PARBHUNATH
08/05/2024
Special inspection requirement — Energy Code Compliance Inspections
INDARDEO PARBHUNATH
08/05/2024
Special inspection requirement — HVAC-R and service water heating system controls
INDARDEO PARBHUNATH
07/11/2024
Objection resolved — Addressed
07/01/2024
Permit issued — Plumbing
B00766877-I1-PL
06/05/2024
Objection resolved — Addressed
06/05/2024
Objection resolved — Addressed
05/07/2024
Objection raised — Fire_Protection
05/01/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/01/2024
Objection raised — Zoning
04/30/2024
Objection resolved — Addressed
04/29/2024
Objection raised — Accessibility
04/27/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/19/2024
Objection raised — Scope
04/18/2024
Objection raised — Scope
04/09/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
RENOVATE EXISTING 4-STORY RESIDENTIAL BUILDING TO CONVERT FROM 2-DWELLING UNITS TO 4-CLASS "A" APARTMENTS. RAISE BASEMENT FLOOR TO BECOME 1ST FLOOR AND CHANGE CONSTRUCTION CLASS TO 1B.
B00749796-P3
04/08/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
RENOVATE EXISTING 4-STORY RESIDENTIAL BUILDING TO CONVERT FROM 2-DWELLING UNITS TO 4-CLASS "A" APARTMENTS. RAISE BASEMENT FLOOR TO BECOME 1ST FLOOR AND CHANGE CONSTRUCTION CLASS TO 1B.
B00749796-P2
02/05/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/28/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
Latest 60 of 127 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offMEGA PLBG CORP07/01/2024
DOB NOWConstruction FenceSigned-offNYC BUILDING SOLUTIONS CO12/26/2023
DOB NOWMechanical SystemsSigned-offPEEPS SERVICES INC11/24/2023
DOB NOWStructuralSigned-offPEEPS SERVICES INC11/22/2023
DOB NOWGeneral ConstructionPermit IssuedPEEPS SERVICES INC08/18/2023
DOB NOWSprinklersSigned-offREAL PLUMBING CORP06/02/2023
DOB NOWSupported ScaffoldSigned-offRELIABLE ENTERPRISES INC03/14/2023
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC02/22/2023
DOB NOWConstruction FenceSigned-offNYC BUILDING SOLUTIONS CO01/05/2023
DOB NOWGeneral ConstructionPermit IssuedPEEPS SERVICES INC12/20/2022
DOB NOWPlumbingSigned-offEMR MECHANICAL CORP12/15/2022
DOB NOWGeneral ConstructionPermit IssuedULTIMATE PAVERS CORP10/24/2022
DOB NOWConstruction FenceSigned-offNYC BUILDING SOLUTIONS CO04/12/2022
2 projects · most recent 09/03/2023
General Wiring
FiledStatusContractorScope
09/03/2023CompleteACCURATE ELEC'L CORP.General Wiring
02/22/2023CompleteRICHARD NEU—
1 project · most recent 09/10/2024
Masonry
FiledStatusContractorScope
09/10/2024Signed-offPEEPS SERVICES INCMasonry
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
10/02/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/01/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/27/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/05/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/28/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/27/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/11/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/08/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 63
DateRequirementInspectorRole
09/09/2024Fenestration areas—energy_progress
09/09/2024Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
09/09/2024Structural Stability – Alterations of existing buildingsINDARDEO PARBHUNATHspecial
09/09/2024Energy Code Compliance InspectionsINDARDEO PARBHUNATHprogress
09/09/2024Insulation placement and R valuesINDARDEO PARBHUNATHenergy_progress
09/09/2024Air barrier - visual inspection—energy_progress
09/09/2024Exterior lighting powerINDARDEO PARBHUNATHenergy_progress
09/09/2024Lighting controlsINDARDEO PARBHUNATHenergy_progress
09/09/2024Fenestration air leakage—energy_progress
09/09/2024Fenestration and door U-factor and product ratings—energy_progress
09/09/2024HVAC-R and service water piping design and insulationINDARDEO PARBHUNATHenergy_progress
09/09/2024HVAC-R and service water heating equipmentINDARDEO PARBHUNATHenergy_progress
09/09/2024HVAC-R and service water heating system controlsINDARDEO PARBHUNATHenergy_progress
09/09/2024Electrical motors and elevatorsINDARDEO PARBHUNATHenergy_progress
09/03/2024MasonryINDARDEO PARBHUNATHspecial
09/03/2024FinalNAVEEN KUMARprogress
09/03/2024Structural Steel - WeldingINDARDEO PARBHUNATHspecial
09/03/2024Structural Steel - High Strength BoltingINDARDEO PARBHUNATHspecial
09/03/2024Structural Cold-Formed SteelINDARDEO PARBHUNATHspecial
09/03/2024Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
09/03/2024Structural Steel - DetailsINDARDEO PARBHUNATHspecial
09/03/2024Post-installed AnchorsINDARDEO PARBHUNATHspecial
08/05/2024Exterior lighting powerINDARDEO PARBHUNATHenergy_progress
08/05/2024Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
08/05/2024Structural Stability – Alterations of existing buildingsINDARDEO PARBHUNATHspecial
Latest 25 of 63.
▾Documents — 140 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/28/2026B00766877-I1Request digital key ↗
08/28/2026B00766877-P1Request digital key ↗
08/28/2026B00766741-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION2
10/10/2024322117124Open ↗
04/24/2024322117124Open ↗
▸Zoning, Tax Lot & Property Records15
▸DOB NOWZD1: DOB Zoning Diagram5
08/13/2026B00749796-P5Open ↗
08/13/2026B00749796-P3Open ↗
08/13/2026B00749796-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWRestrictive Declaration/Easement 15
08/13/2026B00749796-P3Open ↗
08/13/2026B00749796-P1Open ↗
08/13/2026B00749796-P4Open ↗
Showing 3 of 5 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
10/23/2024322117124Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
10/23/2024322117124Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
10/23/2024322117124Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
10/23/2024322117124Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00749796-I1Open ↗
▸Seals & Professional Certifications69
▸DOB NOWProgress Inspector Seal & Signature32
09/01/2026B00749796-P5Open ↗
09/01/2026B00749796-P5Open ↗
09/01/2026B00749796-P5Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature23
09/01/2026B00749796-P5Open ↗
09/01/2026B00749796-P5Open ↗
08/29/2026B00749796-P3Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/28/2026B00766877-I1Open ↗
08/28/2026B00766877-P1Open ↗
08/28/2026B00766741-I1Open ↗
Showing 3 of 14 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00749796-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00749796-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00749796-I1Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/28/2026B00766877-I1Open ↗
08/28/2026B00766877-P1Open ↗
08/28/2026B00766741-I1Open ↗
Showing 3 of 11 on file for this type
▸Energy Compliance4
▸DOB NOWEN2: As Built Energy Analysis3
08/13/2026B00766741-I1Open ↗
08/13/2026B00766877-I1Open ↗
08/13/2026B00749796-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00766741-I1Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
10/23/2024322117124Open ↗
▸BISEFILING COVER SHEET1
04/24/2024322117124Open ↗
▸Other Documents20
▸DOB NOWSite Survey: Initial5
08/13/2026B00749796-P5Open ↗
08/13/2026B00749796-I1Open ↗
08/13/2026B00749796-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/13/2026B00749796-I1Open ↗
08/13/2026B00749796-P3Open ↗
08/13/2026B00749796-P5Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification5
08/28/2026B00749796-P5Open ↗
08/28/2026B00749796-P1Open ↗
08/28/2026B00749796-P4Open ↗
Showing 3 of 5 on file for this type
▸BISVERIFY DOB PLAN NAMING STANDARD IS MET1
10/23/2024322117124Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
04/24/2024322117124Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
10/23/2024322117124Open ↗
▸BISPLOT DIAGRAM1
10/23/2024322117124Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00749796-I1Open ↗