← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
The 5222 14th Avenue Condominium
5222 14 AVENUE · BIN 3427447
💬 Discuss this project
2023Year Built
6Stories
RMBuilding Class
R6Zoning
18,789 sfGross Floor Area
11Units
4 Open Violations ▸FDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: 5224 14TH AVE LLC · 4,000 sf lot · 4.7 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivilGeneral
Roof57p · 2 filings · 20 docs
Floor 658p · 1 filing · 20 docs
Floor 553p · 1 filing · 20 docs
Floor 453p · 1 filing · 20 docs
Floor 353p · 1 filing · 20 docs
Floor 255p · 1 filing · 20 docs
Floor 152p · 1 filing · 20 docs
Cellar61p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PARK3604/09/2026
OWNERS REP703/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXSPEEDIUM1603/21/2026
AE DESIGN SOLUTION803/21/2026
AVALON DESIGNS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KAUFMAN GROUP INCGeneral Contractor1804/09/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor603/21/2026
PRIME PIPING & HEATING INPlumbing207/08/2026
POWER DIRECT ELECTRIC INCElectrical103/22/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161508/02/2024
AA BUILDING & INSPECTION1519206/06/2023
Building Lifecycle
All (187)Filed (26)Permit Issued (13)Signed Off (10)Violation (22)Inspection (8)Objection (78)Special Inspection (30)
05/11/2026
Violation issued (HPD, open)
A
06/26/2025
Violation issued (HPD, closed)
C
11/27/2024
Violation issued (HPD, closed)
I
09/17/2024
Signed off — New Building
MECHANICAL PLANS FILED HEREWITH IN CONJUNCTION WITH DOB NOW APPLICATION JOB #: B08003030
B08003030-S2
08/22/2024
Signed off — New Building
MECHANICAL PLANS FILED HEREWITH IN CONJUNCTION WITH DOB NOW APPLICATION JOB #: B08003030
B08003030-S1
08/07/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/07/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
08/07/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
FAHAD FATEH
08/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
08/05/2024
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
08/05/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/02/2024
Filed — New Building
MECHANICAL PLANS FILED HEREWITH IN CONJUNCTION WITH DOB NOW APPLICATION JOB #: B08003030
B08003030-A2
08/02/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
08/02/2024
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
08/02/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
08/02/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
FAHAD FATEH
08/02/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
08/02/2024
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
08/02/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
07/30/2024
Signed off — New Building
MECHANICAL PLANS FILED HEREWITH IN CONJUNCTION WITH DOB NOW APPLICATION JOB #: B08003030
B08003030-S3
07/23/2024
Permit issued — Mechanical Systems
B08003030-S3-MS
07/23/2024
Permit issued — Plumbing
B08003030-S2-PL
07/22/2024
Permit issued — Sprinklers
B08003030-S1-EW-SP
07/15/2024
Filed — New Building
MECHANICAL PLANS FILED HEREWITH IN CONJUNCTION WITH DOB NOW APPLICATION JOB #: B08003030
B08003030-P8
07/12/2024
Objection resolved — Addressed
07/11/2024
Signed off — Alteration
Boiler plans filed herewith.
B01002301-I1
07/11/2024
Objection raised — Other
07/08/2024
Filed — New Building
MECHANICAL PLANS FILED HEREWITH IN CONJUNCTION WITH DOB NOW APPLICATION JOB #: B08003030
B08003030-P9
06/27/2024
Signed off — New Building
MECHANICAL PLANS FILED HEREWITH IN CONJUNCTION WITH DOB NOW APPLICATION JOB #: B08003030
B08003030-S4
06/25/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
06/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
06/18/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
06/18/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
06/18/2024
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
06/18/2024
Special inspection requirement — Heating Systems
FAHAD FATEH
06/18/2024
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
06/14/2024
Filed — Alteration
Boiler plans filed herewith.
B01002301-P1
06/14/2024
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
06/14/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
06/14/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
06/14/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
06/14/2024
Special inspection requirement — Heating Systems
FAHAD FATEH
06/14/2024
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
06/04/2024
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
06/04/2024
Special inspection requirement — HVAC-R and service water heating equipment
06/04/2024
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
06/04/2024
Special inspection requirement — Shutoff dampers
06/04/2024
Special inspection requirement — HVAC-R and service water heating system controls
06/04/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
06/04/2024
Special inspection requirement — Final
FAHAD FATEH
06/04/2024
Special inspection requirement — Mechanical Systems
FAHAD FATEH
05/10/2024
Permit issued — Boiler Equipment
B01002301-I1-BE
04/19/2024
Signed off — Alteration
B07996680-I1
04/17/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00931101-I1
04/17/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00929408-I1
04/03/2024
Violation issued (HPD, closed)
A
03/14/2024
Filed — New Building
MECHANICAL PLANS FILED HEREWITH IN CONJUNCTION WITH DOB NOW APPLICATION JOB #: B08003030
B08003030-P7
03/14/2024
Objection resolved — Addressed
03/07/2024
Permit issued — Construction Fence
B07996680-I1-FN
Latest 60 of 187 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offKAUFMAN GROUP INC07/23/2024
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN07/23/2024
DOB NOWSprinklersSigned-offA M B MECHANICAL INC07/22/2024
DOB NOWBoiler EquipmentSigned-offPRIME PIPING & HEATING IN05/10/2024
DOB NOWConstruction FenceSigned-offKAUFMAN GROUP INC03/07/2024
DOB NOWGeneral ConstructionPermit IssuedKAUFMAN GROUP INC12/08/2023
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC09/11/2023
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC09/07/2023
DOB NOWSupport of ExcavationSigned-offKAUFMAN GROUP INC07/19/2023
DOB NOWFoundationSigned-offKAUFMAN GROUP INC07/10/2023
DOB NOWStructuralSigned-offKAUFMAN GROUP INC07/10/2023
DOB NOWGeneral ConstructionPermit IssuedKAUFMAN GROUP INC06/30/2023
DOB NOWConstruction FenceSigned-offKAUFMAN GROUP INC03/13/2023
1 project · most recent 08/02/2024
Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/02/2024Signed-offKAUFMAN GROUP INCHeating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Heat / Cool
Gree GMV-V60WL/CT(U) 43,000 BTU · Vrf Outdoor ×26
Heating
Nti NTI-FTVN085C 85,000 BTU · Condensing Unit ×20
Ventilation
Panasonic FV-20VEC1 200 CFM · Erv ×20
Mitsubishi Electric LGH-F1200RVX2-E 1,200 CFM · Erv ×2
1 project · most recent 08/02/2024
Sprinkler System
FiledStatusContractorScope
08/02/2024Signed-offPRIME PIPING & HEATING INSprinkler System
1 project · most recent 08/02/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/02/2024Signed-offPRIME PIPING & HEATING INGas, Storm, Water/Sanitary
3 projects · most recent 11/02/2023
General Wiring
FiledStatusContractorScope
11/02/2023CompletePOWER DIRECT ELECTRIC INCGeneral Wiring
09/07/2023CompleteSOLAS ELECTRICAL CORP—
07/10/2023CompletePOWER DIRECT ELECTRIC INC—
1 project · most recent 08/02/2024
Concrete
FiledStatusContractorScope
08/02/2024Signed-offPRIME PIPING & HEATING INConcrete
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
08/07/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/05/2024Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
08/05/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/02/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/25/2024Pass-Final Boiler Equipment InspectionPassView ↗
02/21/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/09/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
01/12/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 116
DateRequirementInspectorRole
08/07/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
08/07/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
08/07/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
08/02/2024HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
08/02/2024Maintenance informationFAHAD FATEHenergy_progress
08/02/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
08/02/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
08/02/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
08/02/2024HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
08/02/2024HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
06/18/2024Heating SystemsFAHAD FATEHspecial
06/18/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
06/18/2024HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
06/18/2024HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
06/18/2024HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
06/18/2024Maintenance informationFAHAD FATEHenergy_progress
06/14/2024Heating SystemsFAHAD FATEHspecial
06/14/2024HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
06/14/2024Maintenance informationFAHAD FATEHenergy_progress
06/14/2024HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
06/14/2024HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
06/14/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
06/04/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
06/04/2024Mechanical SystemsFAHAD FATEHspecial
06/04/2024FinalFAHAD FATEHprogress
Latest 25 of 116.
▾Documents — 140 on file (BIS + DOB NOW)
▸Plans & Drawings26
▸DOB NOWPlans/Sketch26
08/28/2026B07996680-P1Request digital key ↗
08/28/2026B07996680-I1Request digital key ↗
08/26/2026B00929408-P1Request digital key ↗
Showing 3 of 26 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
07/05/2023340872210Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
07/05/2023340872210Open ↗
▸Zoning, Tax Lot & Property Records11
▸DOB NOWZD1: DOB Zoning Diagram5
08/13/2026B08003030-P6Open ↗
08/13/2026B08003030-I1Open ↗
08/13/2026B08003030-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/13/2026B08003030-P5Open ↗
08/13/2026B08003030-P1Open ↗
08/13/2026B08003030-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B08003030-I1Open ↗
▸Seals & Professional Certifications56
▸DOB NOWDPL-1: Design Professional Seal & Signature26
08/28/2026B07996680-P1Open ↗
08/28/2026B07996680-I1Open ↗
08/26/2026B00929408-I1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/23/2026B01002301-I1Open ↗
09/02/2026B08003030-S4Open ↗
09/01/2026B08003030-P9Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/23/2026B01002301-I1Open ↗
09/02/2026B08003030-S4Open ↗
09/01/2026B08003030-P9Open ↗
Showing 3 of 14 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
07/05/2023340872210Open ↗
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
08/13/2026B08003030-P5Open ↗
08/13/2026B08003030-P6Open ↗
08/13/2026B08003030-P1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection12
▸DOB NOWStreet Tree Checklist5
08/24/2026B08003030-P5Open ↗
08/15/2026B08003030-P2Open ↗
08/15/2026B08003030-I1Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREES SITE PLAN1
07/05/2023340872210Open ↗
▸BISBPP: STREET TREES SITE PLAN1
07/05/2023340872210Open ↗
▸BISSTREET TREE CHECKLIST1
07/05/2023340872210Open ↗
▸BISSTREET TREE SIGNOFF1
09/04/2024340872210Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B08003030-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B08003030-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B08003030-I1Open ↗
▸Energy Compliance3
▸DOB NOWPreliminary Commissioning Report Certification3
08/13/2026B01002301-I1Open ↗
08/13/2026B08003030-S2Open ↗
08/13/2026B08003030-S3Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B08003030-S5Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B08003030-S5Open ↗
▸Approvals, Objections & Sign-offs1
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
09/03/2024340872210Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
07/05/2023340872210Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
07/05/2023340872210Open ↗
▸Other Documents20
▸DOB NOWSite Survey: Initial5
08/13/2026B08003030-P2Open ↗
08/13/2026B08003030-P6Open ↗
08/13/2026B08003030-P5Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/13/2026B08003030-P5Open ↗
08/13/2026B08003030-P1Open ↗
08/13/2026B08003030-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification5
08/24/2026B08003030-P5Open ↗
08/15/2026B08003030-P2Open ↗
08/15/2026B08003030-I1Open ↗
Showing 3 of 5 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
07/05/2023340872210Open ↗
07/05/2023340872210Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
07/05/2023340872210Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B08003030-S6Open ↗
▸DOB NOWFinal Survey1
08/13/2026B08003030-I1Open ↗