Walk-up apt, over six families with stores
5224 8 AVENUE
BROOKLYN · BIN 3014108
💬 Discuss this project
1925Year Built
4Stories
C7Building Class
R6Zoning
5,696 sfGross Floor Area
9Units
Rent Stabilized2 Open Violations ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: CHUNG LEE LLC · 1,613 sf lot · 3.53 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 3 docs
Floor 31p · 1 filing · 2 docs
Floor 2
Floor 1Under Construction4p · 1 filing · 20 docs
CellarUnder Construction5p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GUL G CONTRACTING1107/08/2026
SAFE-SHIELD ENTERPRISES INC503/22/2026
CHUNG LEE LLC503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ELEVATED ENGINEERING, PLLC106/03/2026
CHUN FENG, ARCHITECT404/09/2026
JX FLAME SOLUTION INC108/05/2024
ASHRAF CORP412/21/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DANICO SERVICES803/21/2026
VIBEN BUILDING203/21/2026
HIGH QUALITY 338603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GUL & G CONTRACTING INCGeneral Contractor507/08/2026
SAFE-SHEILD ENTERPRISE INGeneral Contractor303/21/2026
HIGH QUALITY CONSTRUCTIONGeneral Contractor204/09/2026
JABBIE INDUSTRIES INCORP*General Contractor107/08/2026
HESCOTT, CARDINALElectrical103/21/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
LOUIS DEMICHELEElectrical103/21/2026
RAMSARRAN, RAMESHElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ELEVATED ENGINEERING PLLC3692106/03/2026
NKM ENGINEERING PLLC6244504/09/2026
JAY KAVI CORPORATION8500112/21/2022
Building Lifecycle
All (83)Filed (10)Permit Issued (8)Signed Off (3)Violation (24)Inspection (7)Objection (4)Special Inspection (27)
06/23/2026
Objection resolved — Resolved
06/16/2026
Objection raised — Other
06/03/2026
Filed — Alteration
Modification to T-Mobile site. Replace 6 antennas and 3 RRU's unit on the roof. Remove 6 RRU's on the roof. Remove 3 cabinets and install 2 cabinets on existing platform on the roof.
B01406015-I1
04/20/2026
Signed off — Alteration
GENERAL RENOVATION OF PROPOSED STORE TO REMOVE PARTITIONS, INSTALL NEW PARTITION, FLOOR TILES, PAINT AND MECHANICAL WORK OF SPLIT A/C SYSTEM AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01313738-I1
04/15/2026
Special inspection requirement — Insulation placement and R values
Chun Feng
04/15/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Chun Feng
04/15/2026
Special inspection requirement — HVAC-R and service water heating system controls
Chun Feng
04/15/2026
Special inspection requirement — Interior lighting power
Chun Feng
04/15/2026
Special inspection requirement — HVAC-R and service water heating equipment
Chun Feng
04/15/2026
Special inspection requirement — Mechanical Systems
NARESH MAHANGU
04/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
04/15/2026
Special inspection requirement — Tenant Protection Plan Compliance
NARESH MAHANGU
04/15/2026
Special inspection requirement — Energy Code Compliance Inspections
Chun Feng
04/15/2026
Special inspection requirement — Fire-Resistance Rated Construction
Chun Feng
04/15/2026
Special inspection requirement — Final
Chun Feng
04/09/2026
Filed — Alteration
GENERAL RENOVATION OF PROPOSED STORE TO REMOVE PARTITIONS, INSTALL NEW PARTITION, FLOOR TILES, PAINT AND MECHANICAL WORK OF SPLIT A/C SYSTEM AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01313738-P2
04/07/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Chun Feng
04/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
04/07/2026
Special inspection requirement — Mechanical Systems
NARESH MAHANGU
04/07/2026
Special inspection requirement — Tenant Protection Plan Compliance
NARESH MAHANGU
04/07/2026
Special inspection requirement — Energy Code Compliance Inspections
Chun Feng
04/07/2026
Special inspection requirement — Final
Chun Feng
04/07/2026
Special inspection requirement — Fire-Resistance Rated Construction
Chun Feng
04/07/2026
Special inspection requirement — Insulation placement and R values
Chun Feng
04/07/2026
Special inspection requirement — HVAC-R and service water heating equipment
Chun Feng
04/07/2026
Special inspection requirement — Interior lighting power
Chun Feng
04/07/2026
Special inspection requirement — HVAC-R and service water heating system controls
Chun Feng
04/03/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/31/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/19/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/08/2026
Special inspection requirement — Energy Code Compliance Inspections
Chun Feng
01/08/2026
Special inspection requirement — Tenant Protection Plan Compliance
NARESH MAHANGU
01/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
01/02/2026
Filed — Alteration
GENERAL RENOVATION OF PROPOSED STORE TO REMOVE PARTITIONS, INSTALL NEW PARTITION, FLOOR TILES, PAINT AND MECHANICAL WORK OF SPLIT A/C SYSTEM AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01313738-P1
12/04/2025
Permit issued — Plumbing
B01313738-S1-PL
11/24/2025
Permit issued — Mechanical Systems
B01313738-I1-MS
11/24/2025
Permit issued — Mechanical Systems
B01313738-I1-GC
11/17/2025
Objection resolved — Addressed
11/14/2025
Objection raised — Cost
11/12/2025
Filed — Alteration
GENERAL RENOVATION OF PROPOSED STORE TO REMOVE PARTITIONS, INSTALL NEW PARTITION, FLOOR TILES, PAINT AND MECHANICAL WORK OF SPLIT A/C SYSTEM AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01313738-I1
11/12/2025
Filed — Alteration
GENERAL RENOVATION OF PROPOSED STORE TO REMOVE PARTITIONS, INSTALL NEW PARTITION, FLOOR TILES, PAINT AND MECHANICAL WORK OF SPLIT A/C SYSTEM AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01313738-S1
10/21/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/11/2025
Violation issued (ECB, closed)
Construction
02/06/2025
Violation issued (ECB, closed)
Unknown
01/30/2025
Violation issued (FDNY_ORDER, closed)
01/30/2025
Violation issued (FDNY_ORDER, closed)
08/15/2024
Permit issued — General Construction
B01089617-I1-GC
08/05/2024
Filed — Alteration
B01089617-I1
03/21/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/01/2023
Signed off — Alteration
INSTALLATION OF MEDIUMDUTY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE. SIDEWALK SHED FILED UNDER SEPARATE APPLICATION.
B00229743-I1
07/12/2023
Signed off — Alteration
HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 BUIILDING CODE.
B00229335-I1
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/06/2023
Permit issued — General Construction
B00800339-I1-GC
12/21/2022
Filed — Alteration
FACADE REPAIR WHICH INCLUDES STUCCO REPAIR AS PER PLANS.
B00800339-I1
12/17/2022
Filed — Alteration
HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 BUIILDING CODE.
B00229335-P1
12/16/2022
Permit issued — Sidewalk Shed
B00229335-I1-SH
12/16/2022
Special inspection requirement — Tenant Protection Plan Compliance
Jay Kavi
Latest 60 of 83 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedAMERICAN STANDARD P&H CORORP.12/04/2025
DOB NOWMechanical SystemsSigned-offHIGH QUALITY CONSTRUCTION11/24/2025
DOB NOWMechanical SystemsSigned-offHIGH QUALITY CONSTRUCTION11/24/2025
DOB NOWGeneral ConstructionPermit IssuedJABBIE INDUSTRIES INCORP*08/15/2024
DOB NOWGeneral ConstructionPermit IssuedSAFE-SHEILD ENTERPRISE IN01/06/2023
DOB NOWSidewalk ShedSigned-offGUL & G CONTRACTING INC12/16/2022
DOB NOWSupported ScaffoldSigned-offGUL & G CONTRACTING INC10/01/2019
DOB NOWSidewalk ShedSigned-offGUL & G CONTRACTING INC09/20/2019
BISOTISSUEDSQUAN CONSTRUCTION SERVIC10/21/2015
BISOTISSUEDSQUAN CONSTRUCTION SERVIC05/18/2015
BISFPISSUEDNY FIRE LLC07/19/2013
BISOTISSUEDK&C BROTHERS CONSTRUCTION07/17/2013
BISMHISSUEDHONG KONG STYLE CONSTRUCT06/17/2013
BISPLISSUEDCATMAN PLUMBING INC06/17/2013
BISEQISSUEDHONG KONG STYLE CONSTRUCT06/17/2013
BISOTISSUEDHENRYSMITH PROPERTY MGMT12/21/2007
BISFPISSUEDNY BUSINESS FIRE SYSTEM INC.08/01/2007
BISFPISSUEDNEW YORK BUSINESS FIRE SYSTEMS08/01/2006
BISPLISSUEDB.H. PL & HTG CORP07/05/2006
BISMHISSUEDKINGS ASSOCIATES INC.06/08/2006
BISEQISSUEDKINGS ASSOCIATES INC.06/08/2006
BISOTISSUEDODYSSIA GLOBAL COMM. CORP09/07/2005
BISPLISSUEDEP PLUMBING CO.02/05/2004
BIS—ISSUEDPENNACCHIO REMODELING07/21/2003
BISEQISSUEDCD HOUSING CONSTRUCTION CORP08/01/2000
1 project · most recent 04/09/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/09/2026Signed-offHIGH QUALITY CONSTRUCTIONAir Conditioning Systems
Cooling
Gree LIV24HP230V1R32AO 24,000 BTU · Heat Pump Outdoor ×4
1 project · most recent 04/09/2026
Gas Water/Sanitary
FiledStatusContractorScope
04/09/2026Permit IssuedAMERICAN STANDARD P&H CORGas, Water/Sanitary
3 projects · most recent 11/17/2025
General Wiring
FiledStatusContractorScope
11/17/2025Permit IssuedKWONG MING ELECTRIC INCGeneral Wiring
04/13/2025Permit IssuedERIC & NG ELEC'L, INC.General Wiring
09/12/2019Permit IssuedWCK ELECTRIC CORP.—
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
04/03/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/31/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/19/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/13/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/13/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/21/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/21/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
04/15/2026Insulation placement and R valuesChun Fengenergy_progress
04/15/2026HVAC-R and service water piping design and insulationChun Fengenergy_progress
04/15/2026HVAC-R and service water heating system controlsChun Fengenergy_progress
04/15/2026Interior lighting powerChun Fengenergy_progress
04/15/2026HVAC-R and service water heating equipmentChun Fengenergy_progress
04/15/2026Mechanical SystemsNARESH MAHANGUspecial
04/15/2026Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
04/15/2026Tenant Protection Plan ComplianceNARESH MAHANGUspecial
04/15/2026Energy Code Compliance InspectionsChun Fengprogress
04/15/2026Fire-Resistance Rated ConstructionChun Fengprogress
04/15/2026FinalChun Fengprogress
04/07/2026HVAC-R and service water piping design and insulationChun Fengenergy_progress
04/07/2026Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
04/07/2026Mechanical SystemsNARESH MAHANGUspecial
04/07/2026Tenant Protection Plan ComplianceNARESH MAHANGUspecial
04/07/2026Energy Code Compliance InspectionsChun Fengprogress
04/07/2026FinalChun Fengprogress
04/07/2026Fire-Resistance Rated ConstructionChun Fengprogress
04/07/2026Insulation placement and R valuesChun Fengenergy_progress
04/07/2026HVAC-R and service water heating equipmentChun Fengenergy_progress
04/07/2026Interior lighting powerChun Fengenergy_progress
04/07/2026HVAC-R and service water heating system controlsChun Fengenergy_progress
01/08/2026Energy Code Compliance InspectionsChun Fengprogress
01/08/2026Tenant Protection Plan ComplianceNARESH MAHANGUspecial
01/08/2026Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
Latest 25 of 27.
▾Documents — 103 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch7
08/28/2026B00800339-I1Request digital key ↗
08/24/2026B01089617-I1Request digital key ↗
08/17/2026B01313738-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/02/2026B00229335-I1Request digital key ↗
09/02/2026B00229335-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/02/2026B00229743-I1Request digital key ↗
▸Applications & Permits15
▸BISWORK PERMIT APPLICATION9
10/17/2019321999735Open ↗
11/10/2015321116449Open ↗
05/19/2015321116449Open ↗
Showing 3 of 9 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION5
10/17/2019321999735Open ↗
10/12/2018321116449Open ↗
04/23/2015321116449Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
10/09/2018321116449Open ↗
▸Seals & Professional Certifications33
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/24/2026B01089617-I1Open ↗
08/17/2026B01313738-P2Open ↗
08/17/2026B01313738-S1Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
10/17/2019321999735Open ↗
01/09/2019321116449Open ↗
04/23/2015321116449Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
08/31/2026B01313738-S1Open ↗
08/26/2026B00800339-I1Open ↗
08/23/2026B01313738-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/31/2026B01313738-S1Open ↗
08/26/2026B00800339-I1Open ↗
08/23/2026B01313738-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
10/17/2019321999735Open ↗
06/14/2013320772614Open ↗
12/21/2007310074077Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
06/14/2013320772614Open ↗
12/21/2007310074077Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/17/2019321999735Open ↗
▸BISPC FULL REPORT1
12/21/2007310074077Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING2
10/29/2013320772614Open ↗
06/14/2013320772614Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
07/10/2014320772614Open ↗
12/27/2013320772614Open ↗
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
12/26/2013320772614Open ↗
▸Safety & Tenant Protection4
▸DOB NOWTenant Protection Plan3
08/13/2026B00229335-I1Open ↗
08/13/2026B00229743-I1Open ↗
08/13/2026B00229335-P1Open ↗
▸BISTenant Protection Plan and Notes1
10/17/2019321999735Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/17/2026B01313738-P2Open ↗
08/17/2026B01313738-S1Open ↗
08/15/2026B01406015-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
10/17/2019321999735Open ↗
06/14/2013320772614Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
12/21/2007310074077Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
10/17/2019321999735Open ↗
01/09/2019321116449Open ↗
04/23/2015321116449Open ↗
Showing 3 of 4 on file for this type
▸BISEN2 - As Built Energy Analysis2
05/31/2014320772614Open ↗
01/09/2019321116449Open ↗
▸BISTR8: Energy Code Progress Inspections1
05/31/2014320772614Open ↗
▸Approvals, Objections & Sign-offs7
▸BISADMINISTRATIVE OBJECTIONS3
04/23/2015321116449Open ↗
06/14/2013320772614Open ↗
12/21/2007310074077Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
05/31/2014320772614Open ↗
05/31/2014320772614Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
01/09/2019321116449Open ↗
05/31/2014320772614Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
10/17/2019321999735Open ↗
01/09/2019321116449Open ↗
04/23/2015321116449Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms7
▸BISEFILING COVER SHEET3
10/17/2019321999735Open ↗
04/23/2015321116449Open ↗
06/14/2013320772614Open ↗
▸BISADDITIONAL INFORMATION3
11/16/2018321116449Open ↗
11/09/2013320772614Open ↗
10/23/2013320772614Open ↗
▸BISBOROUGH INTAKE FORM1
01/09/2019321116449Open ↗