← Back
BuildNYC
Single or multiple dwelling with stores or offices
523 BAY STREET
STATEN ISLAND · BIN 5013182
💬 Discuss this project
1931Year Built
3Stories
S9Building Class
R6Zoning
6,750 sfGross Floor Area
6Units
Rent Stabilized3 Active Violations ▸
Single or multiple dwelling with stores or offices · Owner of record: Goodstuff of New York · 6,394 sf lot · 1.06 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofGoodstuff of NY7p · 2 filings · 14 docs
Floor 1Epsilon Enterprises Realty LLC8p · 3 filings · 20 docs
CellarEpsilon Enterprises Realty LLC5p · 1 filing · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Epsilon Enterprises Realty2407/08/2026
Goodstuff of New York203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Issa Khorasanchi P.E609/20/2023
Tectonic Engineering105/25/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Sologistics103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
New Wave Electric CoElectrical203/21/2026
Champion Mechanicalspecialty_contractor203/21/2026
Uge USAGeneral Contractor107/08/2026
American Standard P&H CororpPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IP Concrete Testing and I6252509/20/2023
Tectonic Engineering Cons106105/25/2021
Building Lifecycle
All (43)Filed (7)Permit Issued (3)Signed Off (1)Violation (22)Inspection (5)Objection (2)Special Inspection (3)
05/07/2026
Violation issued (HPD, open)
A
06/12/2025
Violation issued (HPD, closed)
A
04/16/2024
Violation issued (HPD, closed)
A
09/26/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/20/2023
Filed — Alteration
INSTALL NEW PLUMBING FIXTURES AND COOKING APPLIANCE INCLUDING ALL ASSOCIATED PIPING.
S00727350-P2
08/23/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/15/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/15/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/20/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/21/2023
Special inspection requirement — Mechanical Systems
INDARDEO PARBHUNATH
06/21/2023
Special inspection requirement — Final
ISSA KHORASANCHI
06/17/2023
Filed — Alteration
INSTALL NEW PLUMBING FIXTURES AND COOKING APPLIANCE INCLUDING ALL ASSOCIATED PIPING.
S00727350-P1
06/17/2023
Filed — Alteration
INSTALL NEW MECHANICAL VENTILATION OVER THE COMMERCIAL KITCHEN COOKING APPLIANCE.
S00727354-P1
06/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
03/29/2023
Violation issued (HPD, closed)
A
02/14/2023
Permit issued — Plumbing
S00727350-I1-PL
02/14/2023
Permit issued — Mechanical Systems
S00727354-I1-MS
05/12/2022
Filed — Alteration
INSTALL NEW PLUMBING FIXTURES AND COOKING APPLIANCE INCLUDING ALL ASSOCIATED PIPING.
S00727350-I1
05/12/2022
Filed — Alteration
S00727348-I1
05/12/2022
Filed — Alteration
INSTALL NEW MECHANICAL VENTILATION OVER THE COMMERCIAL KITCHEN COOKING APPLIANCE.
S00727354-I1
03/08/2022
Violation issued (HPD, closed)
I
03/08/2022
Violation issued (HPD, closed)
A
01/06/2022
Signed off — Alteration
INSTALLATION OF STEEL DUNNAGE TO SUPPORT BATTERY UNIT ON EXISTING ROOF STRUCTURE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
S00520044-I1
11/18/2021
Permit issued — Structural
S00520044-I1-ST
06/02/2021
Objection raised — Scope
06/02/2021
Objection resolved — Addressed
05/25/2021
Filed — Alteration
INSTALLATION OF STEEL DUNNAGE TO SUPPORT BATTERY UNIT ON EXISTING ROOF STRUCTURE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
S00520044-I1
04/16/2021
Violation issued (HPD, closed)
A
01/19/2017
Violation issued (HPD, open)
A
01/19/2017
Violation issued (HPD, open)
B
11/23/2016
Violation issued (HPD, closed)
I
03/02/2015
Violation issued (HPD, closed)
I
05/22/2014
Violation issued (ECB, closed)
Construction
01/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/25/2013
Violation issued (ECB, closed)
Construction
10/25/2013
Violation issued (ECB, closed)
Construction
05/18/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/19/2011
Violation issued (ECB, closed)
Construction
02/19/2011
Violation issued (ECB, closed)
Construction
12/12/2009
Violation issued (ECB, closed)
Construction
12/12/2009
Violation issued (ECB, closed)
Construction
06/20/2009
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAmerican Standard P&H Cororp02/14/2023
DOB NOWMechanical SystemsPermit IssuedChampion Mechanical02/14/2023
DOB NOWStructuralSigned-offUge USA11/18/2021
BISOTISSUEDBonomo & Sons12/03/2021
BISOTISSUEDBonomo & Sons10/19/2021
BISMHISSUEDNew Wave Electric Contracting11/06/2013
BISPLISSUEDLiberty Water & Sewer11/06/2013
BISMHISSUEDNew Wave Electric Contracting02/17/2011
BISMHISSUEDNew Wave Electric Contracting11/23/2010
BISPLISSUEDLiberty Water & Sewer10/28/2010
BISFPISSUEDAtlantic Fire03/13/1992
1 project · most recent 06/17/2023
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/17/2023Permit IssuedChampion MechanicalVentilation Systems
Ventilation
Captiveaire NCA14FA 3,500 CFM · Exhaust Fan ×2
1 project · most recent 09/20/2023
Gas Water/Sanitary
FiledStatusContractorScope
09/20/2023Signed-offAmerican Standard P&HGas, Water/Sanitary
2 projects · most recent 10/15/2021
General Wiring
FiledStatusContractorScope
10/15/2021CompleteLive Wire Electric 1—
03/04/2018Permit IssuedCentrum ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
09/26/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/23/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/15/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/15/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/20/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
06/21/2023Mechanical SystemsINDARDEO PARBHUNATHspecial
06/21/2023FinalISSA KHORASANCHIprogress
06/08/2023Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Goodstuff of NYOtherRoof
Project S00520044 Alteration · LOC Issued · 05/25/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 138 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/24/2026S00727348-I1Request digital key ↗
08/23/2026S00727354-I1Request digital key ↗
08/23/2026S00727354-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits20
▸BISWORK PERMIT APPLICATION10
12/03/2021540200450Open ↗
10/19/2021540200441Open ↗
11/07/2013520164795Open ↗
Showing 3 of 10 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION10
11/02/2022540200441Open ↗
06/07/2021540200450Open ↗
05/19/2021540200441Open ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records4
▸BISFLOOD ZONE COMPLIANCE2
12/30/2022540200441Open ↗
10/05/2022540200450Open ↗
▸BISFLOOD ZONE DESIGN CERTIFICATION2
06/07/2021540200450Open ↗
05/19/2021540200441Open ↗
▸Seals & Professional Certifications20
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/23/2026S00727354-P1Open ↗
08/23/2026S00727354-I1Open ↗
08/23/2026S00727350-P2Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
05/16/2014520164795Open ↗
10/10/2013520164795Open ↗
07/06/2011520050113Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
06/07/2021540200450Open ↗
05/19/2021540200441Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
06/07/2021540200450Open ↗
05/19/2021540200441Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026S00727354-I1Open ↗
08/24/2026S00727350-P1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/10/2013520164795Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/10/2013520164795Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/26/2026S00727354-I1Open ↗
▸Trade Schedules & Equipment15
▸BISSELF-CERT PLUMBING NOTICE6
05/01/2014520164795Open ↗
04/22/2014520164795Open ↗
01/28/2014520164795Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING4
10/10/2013520164795Open ↗
04/13/2011520050113Open ↗
04/05/2011520050113Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
03/31/2014520164795Open ↗
01/06/2014520164795Open ↗
▸BISWATER METER PERMIT : DEP-METER1
06/20/2011520050113Open ↗
▸BISRPZ/DDCV TEST REPORT : GEN215B1
06/20/2011520050113Open ↗
▸BISGAS CUT-OFF1
05/02/2014520164795Open ↗
▸Safety & Tenant Protection2
▸BISTPP1: TENANT PROTECTION PLAN2
08/10/2021540200441Open ↗
06/07/2021540200450Open ↗
▸Environmental & Asbestos20
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/23/2026S00727354-P1Open ↗
08/23/2026S00727354-I1Open ↗
08/23/2026S00727350-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWOER: Notice to Proceed4
08/13/2026S00727350-I1Open ↗
08/13/2026S00727348-I1Open ↗
08/13/2026S00727354-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
06/07/2021540200450Open ↗
05/19/2021540200441Open ↗
10/10/2013520164795Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION2
12/30/2022540200441Open ↗
10/05/2022540200450Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
06/07/2021540200450Open ↗
05/19/2021540200441Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
10/12/2010520050113Open ↗
▸DOB NOWOER: Notice of Satisfaction1
08/13/2026S00520044-I1Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
12/30/2022540200441Open ↗
10/19/2021540200441Open ↗
06/07/2021540200450Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
05/16/2014520164795Open ↗
10/10/2013520164795Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
12/30/2022540200441Open ↗
10/05/2022540200450Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
06/07/2021540200450Open ↗
05/19/2021540200441Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
05/16/2014520164795Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
10/05/2022540200450Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY4
12/30/2022540200441Open ↗
10/19/2021540200441Open ↗
06/07/2021540200450Open ↗
Showing 3 of 4 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
12/02/2021540200450Open ↗
▸BISHYDRO FLOW TEST LETTER1
10/18/2010520050113Open ↗
▸Approvals, Objections & Sign-offs9
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
01/03/2023540200441Open ↗
10/06/2022540200450Open ↗
05/16/2014520164795Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
10/10/2013520164795Open ↗
10/12/2010520050113Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM1
06/20/2011520050113Open ↗
▸BISFINAL1
10/05/2022540200450Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT7
12/30/2022540200441Open ↗
06/07/2021540200450Open ↗
05/19/2021540200441Open ↗
Showing 3 of 7 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
12/30/2022540200441Open ↗
10/05/2022540200450Open ↗
▸Filing & Intake Forms10
▸BISADDITIONAL INFORMATION6
11/22/2022540200441Open ↗
07/27/2021540200441Open ↗
12/15/2015520164795Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
06/07/2021540200450Open ↗
05/19/2021540200441Open ↗
▸BISEFILING COVER SHEET2
10/10/2013520164795Open ↗
10/12/2010520050113Open ↗
▸Other Documents4
▸BISSUBSTANTIAL IMPROVEMENT CALCULATIONS2
06/07/2021540200450Open ↗
05/19/2021540200441Open ↗
▸BISEMERGENCY & STANDBY POWER SYSTEMS (GENERATORS)1
10/05/2022540200450Open ↗
▸BISMAINTENANCE INFORMATION1
10/05/2022540200450Open ↗