DOB06/11/2026TAMPERED WITH, REMOVED OR DEFACED A WRITTEN POSTED STOP WORK ORDER. AT TIME OF INSPECTION, THE PREVIOUS POSTED FULL STOP WORK ORDER HAS BEEN REMOVED FROM THE 1ST FLOOR ENTRY DOOR. NO STOP WORK ORDER POSTINGS OBSERVED ON THE PROPERTY.
ECB06/04/2026UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. AT TIME OF INSPECTION, OBSERVED WORK HAS CONTINUED WHILE FULL STOP WORK ORDER ISSUED ON 4/16/2026, STILL IN EFFECT. NOTED APPROX. 8 WORKERS ON SIT$10K due
ECB06/04/2026TAMPERED WITH, REMOVED OR DEFACED A WRITTEN POSTED STOP WORK ORDER. AT TIME OF INSPECTION, THE PREVIOUS POSTED FULL STOP WORK ORDER HAS BEEN REMOVED FROM THE 1ST FLOOR ENTRY DOOR. NO STOP WORK ORDER POSTINGS OB$5K due
ECB06/02/2026UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. AT EXPOSURE 1(FRONT) & 3(BACK) ILLEGAL WORK CONTINUED AFTER FSWO ON 04/16/2026, OBSERVED 5 WORKERS AT EXTERIOR FRONT & REAR FACADE & YARDS MASONRY$25K due
ECB05/20/2026UNLAWFULLY CONTINUED WORK WHILE UNDER STOP WORK ORDER ISSUED ON 04/16/2026, COMPLAINT #3A16765. AT TIME OF INSPECTION, OBSERVED WORKERS PERFORMING FLOORING WORK THROUGHOUT ALL FLOORS OF THE PREMISES. ADDITIONAL$10K due
ECB05/20/2026FAILURE TO SAFEGUARD PUBLIC AND ADJOINING PROPERTY DURING CONSTRUCTION OPERATIONS. AT EXPOSURE 3, WORKERS PERFORMING MASONRY TILE WORK ALLOWED CONSTRUCTION DEBRIS AND MATERIALS TO FALL ONTO ADJACENT PROPERTY AT$5K due
ECB05/20/2026FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING IN ACCORDANCE WITH CODE REQUIREMENTS. AT EXPOSURE 3, OBSERVED EXCESSIVE ACCUMULATION AND IMPROPER STORAGE OF CONSTRUCTION MATERIALS, DEBRIS, GARBAGE, AND POSSIBLE COMBU$2K due
ECB06/04/2026FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS. AT TIME OF INSPECTION, OBSERVED INADEQUATE HOUSEKEEPING AT REAR OF THE CONSTRUCTION SITE. NOTED AN EXCESSIVE AMOUNT OF DUST DEBRIS, PLASTER COHearing held — result not yet published$1K proposed
ECB05/20/2026FAILURE TO INSTITUTE AND MAINTAIN REQUIRED SAFETY MEASURES AND TEMPORARY CONSTRUCTION SAFEGUARDS. NO HANDRAILS OBSERVED AT STAIRWAY LEADING FROM BASEMENT TO CELLAR LEVEL. CONDITION CREATES UNSAFE MEANS OF ACCESHearing held — result not yet published$2K proposed
ECB04/16/2026TEMPORARY CONSTRUCTION EQUIPMENT OR INSTALLATION ON SITE EXPIRED: AT THE TIME OF INSPECTION, OBSERVED AT EXPOSURE #1, CONSTRUCTION FENCE INSTALLED UNDER JOB #B01118189 HAS BEEN EXPIRED SINCE 02/28/2025. DOB RECNothing owed — awaiting certificate of correction
ECB04/16/2026WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS: AT THE TIME OF INSPECTION,OBSERVED AT EXP. 3 VERTICAL ENLARGEMENT OF PROPERTY AND COMPLETE RENOVATION/REPLACEMENT OF EXTERIOR WALL CONTRARY TO JOB #B011Nothing owed — awaiting certificate of correction