← Back
Walk-up apt, over six families with stores
522 MORRIS AVENUE
BRONX · Melrose · BIN 2091149
💬 Discuss this project
1931Year Built
5Stories
C7Building Class
C4-4Zoning
24,865 sfGross Floor Area
34Units
Rent Stabilized72 Open Violations 70 unresolved · 2 paperwork only ▸
Walk-up apt, over six families with stores · 5,608 sf lot · 4.43 FAR built · Flood zone X
Locations of Work
Mechanical
Floor 11p · 1 filing · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW YORK ENGINEERING ASSOC., P.C.401/25/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING ASSOCIATES P C803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CONSTANCE GARGIULOElectrical103/21/2026
ARCO PLBG AND HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851401/25/2024
Building Lifecycle
All (88)Filed (4)Permit Issued (2)Signed Off (2)Violation (60)Inspection (3)Special Inspection (17)
01/16/2025
Violation issued (HPD, closed)
C
01/16/2025
Violation issued (HPD, closed)
B
01/16/2025
Violation issued (HPD, closed)
B
01/16/2025
Violation issued (HPD, open)
B
01/16/2025
Violation issued (HPD, closed)
B
01/16/2025
Violation issued (HPD, closed)
B
01/16/2025
Violation issued (HPD, closed)
C
01/16/2025
Violation issued (HPD, closed)
C
01/16/2025
Violation issued (HPD, closed)
B
12/06/2024
Violation issued (HPD, closed)
I
11/27/2024
Violation issued (HPD, closed)
B
11/27/2024
Violation issued (HPD, closed)
B
11/27/2024
Violation issued (HPD, closed)
B
11/27/2024
Violation issued (HPD, closed)
C
11/27/2024
Violation issued (HPD, closed)
B
11/27/2024
Violation issued (HPD, closed)
A
11/27/2024
Violation issued (HPD, closed)
A
11/27/2024
Violation issued (HPD, open)
C
11/27/2024
Violation issued (HPD, open)
B
11/23/2024
Violation issued (HPD, closed)
A
11/23/2024
Violation issued (HPD, closed)
A
11/23/2024
Violation issued (HPD, open)
A
11/23/2024
Violation issued (HPD, closed)
A
11/23/2024
Violation issued (HPD, closed)
A
11/02/2024
Violation issued (ECB, closed)
Construction
11/02/2024
Violation issued (HPD, closed)
C
11/02/2024
Violation issued (HPD, closed)
B
11/02/2024
Violation issued (HPD, closed)
B
11/02/2024
Violation issued (HPD, closed)
C
11/02/2024
Violation issued (HPD, closed)
B
11/02/2024
Violation issued (HPD, closed)
A
03/11/2024
Signed off — Alteration
REPLACE BOILER AND OIL BURNER WITH BOILER AND GAS/OIL BURNER.
X07996762-I1
03/11/2024
Signed off — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING.
X07996806-I1
03/01/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/30/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
01/26/2024
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
01/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS ARENA
01/25/2024
Filed — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING.
X07996806-P1
01/17/2024
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
01/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS ARENA
01/05/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/21/2023
Permit issued — Plumbing
X07996806-I1-PL
08/21/2023
Permit issued — Boiler Equipment
X07996762-I1-BE
07/21/2023
Filed — Alteration
RELOCATE AND LEGALIZE AIR CONDITIONING UNITS.
X00897323-I1
06/28/2023
Special inspection requirement — Maintenance information
LOUIS ARENA
06/28/2023
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
06/28/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
06/28/2023
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
06/28/2023
Special inspection requirement — Mechanical Systems
LOUIS ARENA
06/28/2023
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
06/28/2023
Special inspection requirement — Final
LOUIS ARENA
06/28/2023
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
03/29/2023
Violation issued (HPD, closed)
A
11/03/2022
Violation issued (HPD, closed)
I
09/07/2022
Filed — Alteration
REPLACE BOILER AND OIL BURNER WITH BOILER AND GAS/OIL BURNER.
X07996762-I1
09/07/2022
Filed — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING.
X07996806-I1
08/31/2022
Special inspection requirement — Maintenance information
LOUIS ARENA
08/31/2022
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
08/31/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
08/31/2022
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
Latest 60 of 88 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offARCO PLBG AND HTG INC08/21/2023
DOB NOWBoiler EquipmentSigned-offAPPROVED OIL CO OF BKLYN08/21/2023
BISPLISSUEDARANDA PLBG & HTG CORP06/14/2019
BISMHISSUEDACS ENVIRONMENTAL & CONST06/07/2019
BISOTISSUEDACS ENVIRONMENTAL & CONST05/22/2019
1 project · most recent 07/21/2023
Air Conditioning Systems Heating Systems Refrigeration Systems
FiledStatusContractorScopeMake / Model / Capacity
07/21/2023——Air Conditioning Systems, Heating Systems, Refrigeration Systems
Cooling
Mitsubishi Electric MSZ-GL24NA 22,400 BTU · Fan Coil Indoor ×2
MUZ-GL24NA 22,400 BTU · Heat Pump Outdoor ×2
Heating
Mitsubishi Electric MSZ-GL24NA 27,600 BTU · Fan Coil Indoor ×2
MUZ-GL24NA 27,600 BTU ×2
Refrigeration
Emerson XFAM-030Z-CFV-081 30,000 BTU · Refrigeration Unit ×1
XJAM-020Z-CFV-02 20,000 BTU · Refrigeration Unit ×1
1 project · most recent 08/29/2022
Boiler Controls
FiledStatusContractorScope
08/29/2022CompleteLAURA ELEC'L LIGHTING &Boiler Controls
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
03/01/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/30/2024Pass-Final Boiler Equipment InspectionPassView ↗
01/05/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
01/26/2024Energy Code Compliance InspectionsLOUIS ARENAprogress
01/26/2024Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
01/17/2024Energy Code Compliance InspectionsLOUIS ARENAprogress
01/17/2024Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
06/28/2023Maintenance informationLOUIS ARENAenergy_progress
06/28/2023HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
06/28/2023HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
06/28/2023HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
06/28/2023Mechanical SystemsLOUIS ARENAspecial
06/28/2023Tenant Protection Plan ComplianceLOUIS ARENAspecial
06/28/2023FinalLOUIS ARENAprogress
06/28/2023Energy Code Compliance InspectionsLOUIS ARENAprogress
08/31/2022Maintenance informationLOUIS ARENAenergy_progress
08/31/2022HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
08/31/2022HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
08/31/2022HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
08/31/2022Heating SystemsLOUIS ARENAspecial
▾Documents — 44 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/24/2026X07996806-I1Request digital key ↗
08/24/2026X07996806-P1Request digital key ↗
08/24/2026X07996762-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION3
08/12/2019220704101Open ↗
07/25/2019220704101Open ↗
05/24/2019220704101Open ↗
▸BISWORK PERMIT APPLICATION3
06/17/2019220704101Open ↗
06/07/2019220704101Open ↗
05/23/2019220704101Open ↗
▸Seals & Professional Certifications18
▸DOB NOWProgress Inspector Seal & Signature6
09/23/2026X07996762-I1Open ↗
09/23/2026X07996762-I1Open ↗
09/01/2026X07996806-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026X07996762-I1Open ↗
09/01/2026X07996806-P1Open ↗
08/27/2026X07996806-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/24/2026X07996806-P1Open ↗
08/24/2026X07996806-I1Open ↗
08/24/2026X07996762-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
05/24/2019220704101Open ↗
05/24/2019220704101Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
05/24/2019220704101Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
05/24/2019220704101Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
08/12/2019220704101Open ↗
07/25/2019220704101Open ↗
05/24/2019220704101Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
05/24/2019220704101Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/24/2026X07996806-P1Open ↗
08/24/2026X07996806-I1Open ↗
08/24/2026X07996762-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
05/24/2019220704101Open ↗
05/24/2019220704101Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
05/24/2019220704101Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026X07996762-I1Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026X07996762-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
05/24/2019220704101Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
08/12/2019220704101Open ↗
▸BISEFILING COVER SHEET1
05/24/2019220704101Open ↗