← Back
BuildNYC
City university
John Jay College
524 WEST 59TH STREET · BIN 1027084
💬 Discuss this project
2011Year Built
13Stories
W5Building Class
C6-2Zoning
749,133 sfGross Floor Area
1Units
LL97 Covered2 Active Violations 3 likely answered 3 old, status unconfirmed ▸FISP: UNSAFE
City university · Owner of record: Dormitory Authority of the State of New York · 100,415 sf lot · 7.46 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionFire AlarmEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 5John Jay College of Criminal JusticeUnder Construction15p · 1 filing · 10 docs
Floor 4
Floor 3
Floor 2John Jay College of Criminal Justice34p · 5 filings · 17 docs
Floor 1John Jay College of Criminal Justice9p · 1 filing · 13 docs
Site & exteriorJohn Jay College of Criminal Justice4p · 1 filing · 3 docs
Filed — no permit issuedJohn Jay College of Criminal Justice26p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Dormitory Anthority State of New6503/22/2026
Dasny5404/09/2026
CUNY109/01/2026
NYC School Construction Authority103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RPO2603/21/2026
AE Design Solution203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
B&B Contracting GroupGeneral Contractor603/21/2026
Shakespeare Gordon Vlado ArchitectsGeneral Contractor403/22/2026
Senco MetalsGeneral Contractor406/28/2026
Northeast Electrical ContractorsGeneral Contractor303/22/2026
Par Plumbing CoPlumbing207/08/2026
Vik XS ServicesScaffold203/21/2026
Par Fire ProtectionFire Protection207/08/2026
A Tech Electric EnterprisesElectrical103/21/2026
Senco MetalsScaffold104/09/2026
Triple I Electrical Contracting IElectrical103/21/2026
Northeast Electrical ContractorsElectrical103/22/2026
Li KwokElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Future Tech Consultants O589609/26/2024
Building Lifecycle
All (175)Filed (16)Permit Issued (12)Signed Off (2)Facade (FISP) (6)Violation (60)Inspection (5)Objection (46)Special Inspection (28)
08/11/2026
Filed — Alteration
JJ College, Campus Bldg: Removal/replacement of cracked granite stone panels. Repair of spalled/cracked concrete. Partial retrofit of small sunshades. Partial Replacement of medium & large sunshades. Re-attach two-part metal flashing on the roof.
M01441442-I1
08/05/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
08/05/2026
Special inspection requirement — Post-installed Anchors
08/05/2026
Special inspection requirement — Final
Paul Millman
06/11/2026
Permit issued — General Construction
M01026681-I1-GC
06/11/2026
Permit issued — Structural
M01026681-S1-ST
03/03/2026
Violation issued (ECB, open)
Construction
11/19/2025
Filed — Alteration
Suspended Scaffold and Hoist Installation as per plans filed herewith. No change in use, egress or occupancy.
M01320858-I1
11/19/2025
Permit issued — Suspended Scaffold
M01320858-I1-SC
07/25/2025
Special inspection requirement — Public Assembly Emergency Lighting
Stephen Marchese
07/17/2025
Filed — No Work
M00349253-P4
07/15/2025
Special inspection requirement — Public Assembly Emergency Lighting
Stephen Marchese
06/06/2025
Permit issued — Structural
M01026681-S1-ST
06/06/2025
Permit issued — General Construction
M01026681-I1-GC
04/23/2025
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01201916-I1
04/23/2025
Permit issued — Sidewalk Shed
M01201916-I1-SH
11/15/2024
Signed off — Alteration
Modification of Plumbing systems and Sprinkler system. No change in occupancy, use or egress.
M00301476-I1
10/30/2024
Special inspection requirement — Public Assembly Emergency Lighting
Stephen Marchese
10/11/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/08/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/07/2024
Signed off — Alteration
Remove and install ductwork and related devices
M00301494-I1
10/04/2024
Special inspection requirement — Sprinkler Systems
MARISA HARTE
10/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARISA HARTE
10/03/2024
Filed — No Work
M00349227-P2
10/03/2024
Filed — No Work
M00349253-P1
10/01/2024
Special inspection requirement — Public Assembly Emergency Lighting
Stephen Marchese
10/01/2024
Special inspection requirement — Public Assembly Emergency Lighting
Stephen Marchese
09/26/2024
Filed — Alteration
Modification of Plumbing systems and Sprinkler system. No change in occupancy, use or egress.
M00301476-P1
09/25/2024
Special inspection requirement — Duct leakage testing
Stephen Marchese
09/25/2024
Special inspection requirement — Final
Stephen Marchese
09/25/2024
Special inspection requirement — Mechanical Systems
MARISA HARTE
09/25/2024
Special inspection requirement — Energy Code Compliance Inspections
Stephen Marchese
09/25/2024
Special inspection requirement — HVAC insulation and sealing
Stephen Marchese
09/19/2024
Filed — Alteration
Remove and install ductwork and related devices
M00301494-P1
08/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARISA HARTE
08/06/2024
Special inspection requirement — Mechanical Systems
MARISA HARTE
08/06/2024
Special inspection requirement — Energy Code Compliance Inspections
Stephen Marchese
08/06/2024
Special inspection requirement — Final
Stephen Marchese
08/06/2024
Special inspection requirement — Duct leakage testing
Stephen Marchese
08/06/2024
Special inspection requirement — HVAC insulation and sealing
Stephen Marchese
08/06/2024
Special inspection requirement — Sprinkler Systems
MARISA HARTE
07/24/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/24/2024
Cycle 9 facade report submitted
05/24/2024
Cycle 9 facade report signed — UNSAFE
05/24/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/22/2024
Permit issued — Sprinklers
M00301476-I1-EW-SP
05/07/2024
Cycle 9 facade inspection completed
04/09/2024
Filed — Alteration
M01026681-I1
04/09/2024
Filed — Alteration
M01026681-S1
03/28/2024
Special inspection requirement — Structural Steel - Details
MARISA HARTE
03/28/2024
Special inspection requirement — Structural Steel - High Strength Bolting
MARISA HARTE
03/28/2024
Special inspection requirement — Structural Steel - Welding
MARISA HARTE
03/28/2024
Special inspection requirement — Post-installed Anchors
MARISA HARTE
03/27/2024
Special inspection requirement — Final
Amy Shakespeare
03/14/2024
Permit issued — Plumbing
M00301476-I1-PL
02/29/2024
Permit issued — Mechanical Systems
M00301494-I1-MS
09/18/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/13/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/07/2023
Permit issued — Sprinklers
M00301476-I1-EW-SP
04/07/2023
Permit issued — Sprinklers
M00301476-I1-PL
Latest 60 of 175 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSenco Metals06/11/2026
DOB NOWStructuralPermit IssuedSenco Metals06/11/2026
DOB NOWSuspended ScaffoldPermit IssuedVik XS Services11/19/2025
DOB NOWStructuralPermit IssuedSenco Metals06/06/2025
DOB NOWGeneral ConstructionPermit IssuedSenco Metals06/06/2025
DOB NOWSidewalk ShedPermit IssuedSenco Metals04/23/2025
DOB NOWSprinklersSigned-offLawrence J. Levine05/22/2024
DOB NOWPlumbingSigned-offPar Plumbing Co03/14/2024
DOB NOWMechanical SystemsSigned-offB&B Contracting Group02/29/2024
DOB NOWSprinklersSigned-offLawrence J. Levine04/07/2023
DOB NOWPlumbingSigned-offPar Plumbing Co04/07/2023
DOB NOWMechanical SystemsSigned-offB&B Contracting Group04/04/2023
BIS—ISSUEDB&B Contracting Group02/29/2024
BIS—ISSUEDB&B Contracting Group04/05/2023
BISOTISSUEDWDF06/03/2020
BISMHISSUEDWDF06/03/2020
BISMHISSUEDWDF06/10/2019
BISOTISSUEDWDF06/10/2019
BISMHISSUEDWDF07/09/2018
BISOTISSUEDWDF07/09/2018
BISSPISSUEDWDF06/28/2018
BISOTISSUEDJemco Electrical Cont04/20/2018
BISSPISSUEDA&M Warshaw Services09/08/2017
BISOTISSUEDPro Con Group08/04/2017
BISOTISSUEDPro Con Group08/04/2017
BISMHISSUEDWDF06/06/2017
BISOTISSUEDWDF06/05/2017
BISOTISSUEDWDF06/05/2017
BISMHISSUEDWDF03/22/2017
BISOTISSUEDWDF03/22/2017
BISSPISSUEDWDF02/21/2017
BISMHISSUEDWDF06/10/2016
BISOTISSUEDWDF06/10/2016
BISSPISSUEDWDF03/02/2016
BISMHISSUEDPro Con Group03/01/2016
BISOTISSUEDPro Con Group03/01/2016
BISOTISSUEDWDF06/05/2015
BISMHISSUEDWDF06/05/2015
BISSPISSUEDWDF03/04/2015
BISSPISSUEDWDF, Inc Dba WDF Federate01/21/2015
+ 22 more permits on file
4 projects · most recent 03/04/2024
General Wiring
FiledStatusContractorScope
03/04/2024CompleteBigman BrothersGeneral Wiring
03/04/2024CompleteBigman Brothers—
04/03/2023CompleteNortheast Electrical ContractorsGeneral Wiring
04/26/2018Permit IssuedA Tech Electric Enterprises—
1 project · most recent 05/12/2020
Steel
FiledStatusContractorScope
05/12/2020——Steel
1 project · most recent 04/23/2025
Sidewalk Shed
FiledStatusContractorScope
04/23/2025Permit IssuedSenco MetalsSidewalk Shed
1 project · most recent 11/19/2025
Suspended Scaffold
FiledStatusContractorScope
11/19/2025Permit IssuedVik XS ServicesSuspended Scaffold
1 project · most recent 11/19/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
11/19/2025Permit IssuedVik XS ServicesSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
10/11/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/08/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/24/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/18/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/13/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
08/05/2026Wall Panels, Curtain Walls, and Veneers—special
08/05/2026Post-installed Anchors—special
08/05/2026FinalPaul Millmanprogress
07/25/2025Public Assembly Emergency LightingStephen Marcheseprogress
07/15/2025Public Assembly Emergency LightingStephen Marcheseprogress
10/30/2024Public Assembly Emergency LightingStephen Marcheseprogress
10/04/2024Sprinkler SystemsMARISA HARTEspecial
10/04/2024Fire-Resistant Penetrations and JointsMARISA HARTEspecial
10/01/2024Public Assembly Emergency LightingStephen Marcheseprogress
10/01/2024Public Assembly Emergency LightingStephen Marcheseprogress
09/25/2024Duct leakage testingStephen Marcheseenergy_progress
09/25/2024FinalStephen Marcheseprogress
09/25/2024Mechanical SystemsMARISA HARTEspecial
09/25/2024Energy Code Compliance InspectionsStephen Marcheseprogress
09/25/2024HVAC insulation and sealingStephen Marcheseenergy_progress
08/06/2024Fire-Resistant Penetrations and JointsMARISA HARTEspecial
08/06/2024Mechanical SystemsMARISA HARTEspecial
08/06/2024Energy Code Compliance InspectionsStephen Marcheseprogress
08/06/2024FinalStephen Marcheseprogress
08/06/2024Duct leakage testingStephen Marcheseenergy_progress
08/06/2024HVAC insulation and sealingStephen Marcheseenergy_progress
08/06/2024Sprinkler SystemsMARISA HARTEspecial
03/28/2024Structural Steel - DetailsMARISA HARTEspecial
03/28/2024Structural Steel - High Strength BoltingMARISA HARTEspecial
03/28/2024Structural Steel - WeldingMARISA HARTEspecial
Latest 25 of 28.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
John Jay College of Criminal JusticeEducationEntire building
Project M01441442 Alteration · Approved · 08/11/2026
Project M01320858 Alteration · Permit Entire · 11/19/2025
Project M01201916 Alteration · Permit Entire · 04/23/2025
Project M01026681 Alteration · Permit Entire · 04/09/2024
Project M00349227 No Work · PA Certificate of Operation Issued · 05/18/2020
Project M00349253 No Work · PA Certificate of Operation Issued · 05/18/2020
Project M00301476 Alteration · LOC Issued · 05/12/2020
Project M00301494 Alteration · LOC Issued · 05/12/2020
Project M00326964 Alteration · Incomplete · 05/12/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 615 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch - Place of Assembly6
09/04/2026M00349253-I1Request digital key ↗
09/04/2026M00349253-P1Request digital key ↗
09/04/2026M00349253-P4Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch4
08/27/2026M01026681-I1Request digital key ↗
08/27/2026M01026681-S1Request digital key ↗
08/24/2026M01201916-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/04/2026M00301494-I1Request digital key ↗
09/04/2026M00301494-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
09/04/2026M00301476-I1Request digital key ↗
09/04/2026M00301476-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/04/2026M00301476-P1Request digital key ↗
09/04/2026M00301476-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/04/2026M00326964-I1Request digital key ↗
▸Applications & Permits143
▸BISPLAN / WORK APPROVAL APPLICATION60
04/25/2025121207684Open ↗
04/23/2025121207684Open ↗
04/22/2025121207684Open ↗
Showing 3 of 60 on file for this type
▸BISWORK PERMIT APPLICATION59
04/06/2023121207684Open ↗
06/11/2019121683268Open ↗
06/11/2019121683268Open ↗
Showing 3 of 59 on file for this type
▸BISPLACE OF ASSEMBLY17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPLACE OF ASSEMBLY APPLICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
07/26/2024121207684Open ↗
▸DOB NOWHPD Certification Letter or CPC Special Permit1
08/17/2026M01441442-I1Open ↗
▸Seals & Professional Certifications153
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION90
04/06/2023121207684Open ↗
04/06/2023121207684Open ↗
12/06/2018123326800Open ↗
Showing 3 of 90 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
09/04/2026M00301494-P1Open ↗
09/04/2026M00301494-I1Open ↗
08/27/2026M01026681-S1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
08/31/2026M01441442-I1Open ↗
08/30/2026M01026681-S1Open ↗
08/29/2026M00349253-I1Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST13
01/16/2016122638468Open ↗
01/14/2016122605056Open ↗
Showing 2 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
08/30/2026M01026681-S1Open ↗
08/22/2026M00301494-I1Open ↗
08/22/2026M00301476-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
01/16/2016122638468Open ↗
01/14/2016122605056Open ↗
▸Trade Schedules & Equipment25
▸BISSELF-CERT PLUMBING NOTICE8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
11/03/2016122860109Open ↗
01/16/2016122638468Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA2
12/28/2017122608963Open ↗
Showing 1 of 2 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSPRINKLER SYSTEMS1
09/12/2024122860109Open ↗
▸Safety & Tenant Protection17
▸DOB NOWHPD-2: Clinton Special District Anti-Harassment Checklist9
09/04/2026M00301494-P1Open ↗
08/17/2026M01441442-I1Open ↗
08/13/2026M00301476-P1Open ↗
Showing 3 of 9 on file for this type
▸BISANTI-HARASSMENT CHECKLIST: CLINTON4
07/11/2017123326800Open ↗
03/23/2017122860109Open ↗
01/16/2016122638468Open ↗
Showing 3 of 4 on file for this type
▸BISHPD-1 - Anti-Harassment Area Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTREET TREE CHECKLIST1
07/21/2020121207684Open ↗
▸BISCLINTON DISTRICT: ANTI-HARASSMENT CHECKLIST1
10/26/2020121207684Open ↗
▸DOB NOWCertificate of No Harassment1
08/17/2026M01441442-I1Open ↗
▸Environmental & Asbestos27
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸DOB NOWOER: Notice to Proceed4
08/13/2026M00301476-P1Open ↗
08/13/2026M01026681-I1Open ↗
08/13/2026M01026681-S1Open ↗
Showing 3 of 4 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION2
11/05/2024122860109Open ↗
10/10/2024121207684Open ↗
▸DOB NOWOER: Notice of Satisfaction2
08/13/2026M00301494-I1Open ↗
08/13/2026M00301476-I1Open ↗
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/15/2016122638468Open ↗
▸Energy Compliance20
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
04/06/2023121207684Open ↗
12/06/2018123326800Open ↗
07/11/2017123326800Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
10/26/2020121207684Open ↗
10/26/2020121207684Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
11/05/2024122860109Open ↗
10/10/2024121207684Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
12/06/2018123326800Open ↗
06/07/2017122605056Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
11/05/2024122860109Open ↗
09/17/2024121207684Open ↗
▸BISLIGHTING CONTROLS1
09/17/2024121207684Open ↗
▸BISINTERIOR LIGHTING POWER1
09/17/2024121207684Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY3
10/26/2020121207684Open ↗
10/26/2020121207684Open ↗
10/26/2020121207684Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION2
09/17/2024121207684Open ↗
09/12/2024122860109Open ↗
▸BISSTRUCTURAL STEEL - WELDING2
09/17/2024121207684Open ↗
09/12/2024122860109Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING2
09/17/2024121207684Open ↗
09/12/2024122860109Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
09/17/2024121207684Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
09/12/2024122860109Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
09/17/2024121207684Open ↗
▸Approvals, Objections & Sign-offs93
▸BISADMINISTRATIVE OBJECTIONS32
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 32 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST22
12/06/2018123326800Open ↗
06/07/2017122605056Open ↗
05/27/2014121385722Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter15
09/04/2026M00301494-P1Open ↗
08/26/2026M00349227-I1Open ↗
08/17/2026M01441442-I1Open ↗
Showing 3 of 15 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE9
04/25/2025121207684Open ↗
04/23/2025121207684Open ↗
04/22/2025121207684Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
06/07/2017122605056Open ↗
Showing 1 of 6 on file for this type
▸BISSUPERSEDING LETTER4
04/03/2017121683268Open ↗
03/11/2015121683268Open ↗
09/26/2014121683268Open ↗
Showing 3 of 4 on file for this type
▸BISSHED LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Cost, Insurance & Ownership30
▸BISCOST AFFIDAVIT27
10/26/2020121207684Open ↗
12/06/2018123326800Open ↗
07/11/2017123326800Open ↗
Showing 3 of 27 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
11/05/2024122860109Open ↗
10/15/2024121207684Open ↗
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
10/26/2020121207684Open ↗
▸Filing & Intake Forms53
▸BISEFILING COVER SHEET30
06/24/2020121207684Open ↗
06/01/2020121207684Open ↗
07/11/2017123326800Open ↗
Showing 3 of 30 on file for this type
▸BISADDITIONAL INFORMATION19
02/03/2025121207684Open ↗
07/21/2020121207684Open ↗
06/01/2016122605056Open ↗
Showing 3 of 19 on file for this type
▸BISeFiling Job Application Cover Sheet3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISBOROUGH INTAKE FORM1
12/06/2018123326800Open ↗
▸Other Documents18
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION8
12/06/2018123326800Open ↗
07/11/2017123326800Open ↗
01/14/2016122605056Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWAlternate Plan 13
08/26/2026M00349227-P2Open ↗
08/26/2026M00349227-I1Open ↗
08/26/2026M00349227-P1Open ↗
▸BISPLOT DIAGRAM2
10/26/2020121207684Open ↗
10/26/2020121207684Open ↗
▸BISSupporting Document: Fee Deferment2
01/12/2016122608963Open ↗
01/12/2016122638468Open ↗
▸BISENVIRONMENTAL "E" DEP NOTICE TO PROCEED1
03/20/2017122860109Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01320858-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01320858-I1Open ↗