Elevator apt, fireproof with stores
The Village West
525 AVENUE OF THE AMERICAS · West Village · BIN 1091089
💬 Discuss this project
2024Year Built
13Stories
D6Building Class
C6-3AZoning
123,697 sfGross Floor Area
71Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Elevator apt, fireproof with stores · Owner of record: 525 6TH AVE LLC · 12,900 sf lot · 9.59 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Permit Issued — active, not yet Signed-off
Roof3p · 2 filings
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 41 filing
Floor 31 filing
Floor 22 filings
Floor 1Under Construction4 filings
CellarUnder Construction2 filings
Site & exterior4 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SKYLINE SCAFFOLDING GROUP404/12/2026
CONSTRUCTION SVS CON NY204/12/2026
ALBA SERVICES104/12/2026
525 6TH AVE LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
G.N.T. MECHANICAL LLCFire Protection807/08/2026
G.N.T. MECHANICAL LLCPlumbing507/08/2026
SKYLINE SCAFFOLDING GROUPGeneral Contractor404/12/2026
HUNTER ROBERTS CONSTRUCTIONGeneral Contractor304/12/2026
ALBA SERVICES INCGeneral Contractor204/12/2026
CONSTRUCTION SVS CON NYGeneral Contractor104/12/2026
R.C. STRUCTURES INCGeneral Contractor104/12/2026
TRI BOROUGH SCAFFOLDINGGeneral Contractor104/12/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ATLAS ATC ENGINEERING INC80111905/11/2026
DESIMONE CONSULTING ENGIN5942301/07/2025
LANGAN ENG, ENV, SURVEYIN1265501/07/2025
HIGHRISE GROUP NYC, INC6753106/23/2022
Building Lifecycle
All (205)Filed (49)Permit Issued (55)Signed Off (20)Violation (2)Inspection (31)Objection (18)Special Inspection (30)
09/04/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/16/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/08/2026
Signed off — New Building
Plumbing work in conjunction with new building # M08011197
M08011197-S4
06/22/2026
Signed off — New Building
Plumbing work in conjunction with new building # M08011197
M08011197-S6
05/14/2026
Special inspection requirement — Maintenance information
RONALD GRAPIN
05/14/2026
Special inspection requirement — HVAC-R and service water heating equipment
RONALD GRAPIN
05/14/2026
Special inspection requirement — HVAC-R and service water heating system controls
RONALD GRAPIN
05/14/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
RONALD GRAPIN
05/14/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
RONALD GRAPIN
05/11/2026
Filed — New Building
Plumbing work in conjunction with new building # M08011197
M08011197-B1
05/11/2026
Special inspection requirement — HVAC-R and service water heating system controls
RONALD GRAPIN
05/11/2026
Special inspection requirement — Maintenance information
RONALD GRAPIN
05/11/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
RONALD GRAPIN
05/11/2026
Special inspection requirement — HVAC-R and service water heating equipment
RONALD GRAPIN
05/11/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
RONALD GRAPIN
05/06/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/29/2026
Signed off — Alteration
Temporary Construction Field Office as shown per plan, filed in conjunction with new building M08011197-I1. No change in use, egress of occupancy.
M01102685-I1
04/24/2026
Signed off — Alteration
Installation of a temporarily heavy-duty sidewalk shed and construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application
M00967564-I1
04/21/2026
Objection raised — Other
04/21/2026
Objection resolved — Addressed
04/14/2026
Filed — New Building
Plumbing work in conjunction with new building # M08011197
M08011197-A9
04/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RONALD GRAPIN
04/11/2026
Special inspection requirement — Sprinkler Systems
RONALD GRAPIN
04/11/2026
Special inspection requirement — Standpipe Systems
RONALD GRAPIN
04/10/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
RONALD GRAPIN
04/10/2026
Special inspection requirement — HVAC-R and service water heating equipment
RONALD GRAPIN
04/10/2026
Special inspection requirement — Maintenance information
RONALD GRAPIN
04/10/2026
Special inspection requirement — HVAC-R and service water heating system controls
RONALD GRAPIN
04/10/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
RONALD GRAPIN
03/26/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/09/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/04/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/27/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
02/27/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/10/2026
Signed off — New Building
Plumbing work in conjunction with new building # M08011197
M08011197-S2
02/07/2026
Violation issued (ECB, closed)
Construction
02/06/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/06/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/03/2026
Permit issued — Sprinklers
M08011197-S6-EW-SP
02/03/2026
Permit issued — Sprinklers
M08011197-S6-EW-SD
02/03/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/03/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/02/2026
Signed off — New Building
Plumbing work in conjunction with new building # M08011197
M08011197-S7
01/30/2026
Objection resolved — Addressed
01/29/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/23/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01000945-I1
01/23/2026
Permit issued — General Construction
M01165676-I1-GC
01/21/2026
Permit issued — Supported Scaffold
M01000945-I1-SF
01/20/2026
Permit issued — General Construction
M08011197-I1-GC
01/13/2026
Signed off — Alteration
Mechanical work in conjunction with Temporary Sales Office. Application filed in conjunction with NB # M08011197.
M01165676-S2
01/07/2026
Special inspection requirement — Exterior lighting power
RONALD GRAPIN
01/07/2026
Special inspection requirement — Maintenance information
RONALD GRAPIN
01/07/2026
Special inspection requirement — Metering
RONALD GRAPIN
01/07/2026
Special inspection requirement — Lighting controls
RONALD GRAPIN
01/07/2026
Special inspection requirement — Electrical motors and elevators
RONALD GRAPIN
01/07/2026
Special inspection requirement — Interior lighting power
RONALD GRAPIN
01/07/2026
Special inspection requirement — HVAC-R and service water heating equipment
RONALD GRAPIN
01/07/2026
Special inspection requirement — Energy Code Compliance Inspections
RONALD GRAPIN
01/07/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
RONALD GRAPIN
01/07/2026
Special inspection requirement — Shutoff dampers
RONALD GRAPIN
Latest 60 of 205 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offG.N.T. MECHANICAL LLC02/03/2026
DOB NOWSprinklersSigned-offG.N.T. MECHANICAL LLC02/03/2026
DOB NOWGeneral ConstructionPermit IssuedHUNTER ROBERTS CONSTRUCTION01/23/2026
DOB NOWSupported ScaffoldSigned-offBPRT CONSTRUCTION OF NY01/21/2026
DOB NOWGeneral ConstructionPermit IssuedHUNTER ROBERTS CONSTRUCTION01/20/2026
DOB NOWMechanical SystemsSigned-offHUNTER ROBERTS CONSTRUCTION09/29/2025
DOB NOWSupported ScaffoldSigned-offBAYPORT CONSTRUCTION CORP08/06/2025
DOB NOWPlumbingSigned-offG.N.T. MECHANICAL LLC07/21/2025
DOB NOWProtection and Mechanical MethodsSigned-offSKYLINE SCAFFOLDING GROUP05/15/2025
DOB NOWSidewalk ShedSigned-offSKYLINE SCAFFOLDING GROUP05/01/2025
DOB NOWSidewalk ShedSigned-offSKYLINE SCAFFOLDING GROUP05/01/2025
DOB NOWGeneral ConstructionPermit IssuedHUNTER ROBERTS CONSTRUCTION04/25/2025
DOB NOWMechanical SystemsSigned-offBREFFNI MECHANICAL04/11/2025
DOB NOWProtection and Mechanical MethodsSigned-offSKYLINE SCAFFOLDING GROUP03/27/2025
DOB NOWMechanical SystemsSigned-offBREFFNI MECHANICAL03/20/2025
DOB NOWProtection and Mechanical MethodsSigned-offSKYLINE SCAFFOLDING GROUP03/19/2025
DOB NOWPlumbingSigned-offG.N.T. MECHANICAL LLC03/17/2025
DOB NOWGeneral ConstructionPermit IssuedHUNTER ROBERTS CONSTRUCTION02/28/2025
DOB NOWPlumbingSigned-offG.N.T. MECHANICAL LLC01/27/2025
DOB NOWStandpipeSigned-offG.N.T. MECHANICAL LLC01/27/2025
DOB NOWStandpipeSigned-offG.N.T. MECHANICAL LLC01/27/2025
DOB NOWSprinklersSigned-offG.N.T. MECHANICAL LLC01/27/2025
DOB NOWSupported ScaffoldSigned-offBAYPORT CONSTRUCTION CORP12/31/2024
DOB NOWSupported ScaffoldSigned-offALPHA SCAFFOLDING INC12/02/2024
DOB NOWMechanical SystemsSigned-offHUNTER ROBERTS CONSTRUCTION11/25/2024
DOB NOWSupported ScaffoldSigned-offBAYPORT CONSTRUCTION CORP10/07/2024
DOB NOWProtection and Mechanical MethodsSigned-offHUNTER ROBERTS CONSTRUCTION09/09/2024
DOB NOWPlumbingSigned-offG.N.T. MECHANICAL LLC08/22/2024
DOB NOWSupported ScaffoldSigned-offBAYPORT CONSTRUCTION CORP07/26/2024
DOB NOWProtection and Mechanical MethodsSigned-offR.C. STRUCTURES INC05/17/2024
DOB NOWProtection and Mechanical MethodsSigned-offR.C. STRUCTURES INC05/17/2024
DOB NOWSidewalk ShedSigned-offSKYLINE SCAFFOLDING GROUP05/10/2024
DOB NOWSidewalk ShedSigned-offSKYLINE SCAFFOLDING GROUP05/10/2024
DOB NOWGeneral ConstructionPermit IssuedHUNTER ROBERTS CONSTRUCTION04/26/2024
DOB NOWProtection and Mechanical MethodsSigned-offSKYLINE SCAFFOLDING GROUP04/25/2024
DOB NOWProtection and Mechanical MethodsSigned-offSKYLINE SCAFFOLDING GROUP04/18/2024
DOB NOWFoundationSigned-offHUNTER ROBERTS CONSTRUCTION04/18/2024
DOB NOWSupported ScaffoldSigned-offBAYPORT CONSTRUCTION CORP04/15/2024
DOB NOWStandpipeSigned-offG.N.T. MECHANICAL LLC02/27/2024
DOB NOWPlumbingSigned-offG.N.T. MECHANICAL LLC02/26/2024
+ 10 more permits on file
1 project · most recent 03/03/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/03/2025Permit IssuedHUNTER ROBERTS CONSTRUCTIHeating and Air Conditioning Systems
Heat / Cool
Daikin FDMQ15WVJU9 18,000 BTU · Split System ×1
RX15WMVJU9 18,000 BTU · Condensing Unit ×1
2 projects · most recent 05/11/2026
Sprinkler System
FiledStatusContractorScope
05/11/2026Signed-offG.N.T. MECHANICAL LLCSprinkler System
03/03/2025——Sprinkler System
2 projects · most recent 05/11/2026
Water/Sanitary Gas Storm Plumbing-Sprinkler
FiledStatusContractorScope
05/11/2026Signed-offG.N.T. MECHANICAL LLCGas, Storm, Water/Sanitary
03/03/2025Signed-offG.N.T. MECHANICAL LLCPlumbing-Sprinkler, Water/Sanitary
11 projects · most recent 09/23/2026
General Wiring
FiledStatusContractorScope
09/23/2026Permit IssuedEMCO ELECTRIC SVCS LLCGeneral Wiring
08/12/2026CompleteDAVEN ELECTRIC CORP—
08/11/2026Permit IssuedPOWER SURGE ELECTRIC, INCGeneral Wiring
08/03/2026CompleteEIS ELECTRIC CORP DBA—
07/29/2026Permit IssuedPW & SONS ELECTRICAL CORPGeneral Wiring
12/15/2025Permit IssuedCENTRIFUGAL ELECTRIC LLCGeneral Wiring
10/16/2024Permit IssuedTF ELECTRICAL CORPGeneral Wiring
10/16/2024Permit IssuedTF ELECTRICAL CORPGeneral Wiring
07/29/2024CompleteCENTRIFUGAL ELECTRIC LLC—
07/08/2024CompleteTOP SHELF ELECTRIC CORP—
03/13/2024CompleteCENTRIFUGAL ELECTRIC LLC—
1 project · most recent 05/11/2026
Steel Concrete
FiledStatusContractorScope
05/11/2026Signed-offG.N.T. MECHANICAL LLCSteel, Concrete
1 project · most recent 01/05/2026
Fence Sidewalk Shed
FiledStatusContractorScope
01/05/2026Signed-offSKYLINE SCAFFOLDING GROUPFence, Sidewalk Shed
▾Field Inspections (DOB CAP) — 31
DateTypeResultReport
09/04/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/16/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/06/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/26/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/09/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/04/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/27/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/27/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/06/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/06/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/03/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/03/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/29/2026Pass-Final CND-Occupancy InspectionPassView ↗
10/31/2025Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
10/31/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
10/28/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
06/05/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/12/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/09/2025Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
04/11/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/04/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/01/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/12/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/12/2025Pass-Final PL - More than 10 Requested FloorsPassView ↗
01/08/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
Latest 25 of 31.
▾Special Inspection Requirements (DOB NOW) — 126
DateRequirementInspectorRole
05/14/2026HVAC-R and service water piping design and insulationRONALD GRAPINenergy_progress
05/14/2026HVAC-R and service water heating equipmentRONALD GRAPINenergy_progress
05/14/2026HVAC-R and service water heating system controlsRONALD GRAPINenergy_progress
05/14/2026Maintenance informationRONALD GRAPINenergy_progress
05/14/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationRONALD GRAPINspecial
05/11/2026Maintenance informationRONALD GRAPINenergy_progress
05/11/2026HVAC-R and service water piping design and insulationRONALD GRAPINenergy_progress
05/11/2026HVAC-R and service water heating system controlsRONALD GRAPINenergy_progress
05/11/2026HVAC-R and service water heating equipmentRONALD GRAPINenergy_progress
05/11/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationRONALD GRAPINspecial
04/11/2026Fire-Resistant Penetrations and JointsRONALD GRAPINspecial
04/11/2026Standpipe SystemsRONALD GRAPINspecial
04/11/2026Sprinkler SystemsRONALD GRAPINspecial
04/10/2026HVAC-R and service water heating system controlsRONALD GRAPINenergy_progress
04/10/2026Maintenance informationRONALD GRAPINenergy_progress
04/10/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationRONALD GRAPINspecial
04/10/2026HVAC-R and service water piping design and insulationRONALD GRAPINenergy_progress
04/10/2026HVAC-R and service water heating equipmentRONALD GRAPINenergy_progress
01/07/2026HVAC-R and service water heating equipmentRONALD GRAPINenergy_progress
01/07/2026HVAC-R and service water piping design and insulationRONALD GRAPINenergy_progress
01/07/2026Lighting in dwelling unitsRONALD GRAPINenergy_progress
01/07/2026MeteringRONALD GRAPINenergy_progress
01/07/2026Exterior lighting powerRONALD GRAPINenergy_progress
01/07/2026Maintenance informationRONALD GRAPINenergy_progress
01/07/2026Lighting controlsRONALD GRAPINenergy_progress
Latest 25 of 126.
▾Documents — 165 on file (BIS + DOB NOW)
▸Plans & Drawings47
▸DOB NOWPlans/Sketch47
09/02/2026M00736820-I1Request digital key ↗
09/01/2026M08011243-I1Request digital key ↗
08/31/2026M00853291-I1Request digital key ↗
Showing 3 of 47 on file for this type
▸Seals & Professional Certifications111
▸DOB NOWDPL-1: Design Professional Seal & Signature48
09/02/2026M00736820-I1Open ↗
09/01/2026M08011243-I1Open ↗
08/27/2026M01052138-I1Open ↗
Showing 3 of 48 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature36
09/22/2026M08011197-P1Open ↗
09/22/2026M08011197-P1Open ↗
09/01/2026M08011197-S2Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWProgress Inspector Seal & Signature27
09/01/2026M08011197-S2Open ↗
09/01/2026M08011197-P6Open ↗
09/01/2026M08011197-I1Open ↗
Showing 3 of 27 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Sign Off1
08/17/2026M08011197-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
09/02/2026M00736820-I1Open ↗
▸Other Documents5
▸DOB NOWProperty Ownership Certification4
08/17/2026M08011197-P7Open ↗
08/17/2026M08011197-I1Open ↗
08/17/2026M08011197-P5Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey1
08/17/2026M08011197-I1Open ↗