ECB04/08/2021FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS.AT TIME OF INSPECTION OBSERVED;EXCESSIVE CONSTRUCTION GARBAGE DEBRIS SUCH AS COMBUSTIBLE WOOD DEBRIS AND GARBAGE BAGS AT EXP #4 AND #3 OF BUILD$312 due
ECB04/08/2021WORK WITHOUT PERMIT.AT TIME OF INSPECTION OBSERVED (1)AT EXP #3 OF THE BUILDING,CREATED HORIZONTAL EXTENSION AT 2ND FLOOR LEVEL WHICH PROJECTING FROM BUILDING EXISTING FACADE APROX 25' AND 16' WIDTH.THIS EXTENSNothing owed — awaiting certificate of correction
Two stories - detached, small or mid-size · 2,000 sf lot · 0.77 FAR built · Flood zone X