Floor 1328p · 1 filing · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
HSS 12: SPRINKLER AND PLUMBING MODIFICATIONS TO ACCOMMODATE ALTERATIONS TO THE EXISTING OFFICE AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
21 documents
Floor 1215p · 1 filing · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbing
HSS 12: SPRINKLER AND PLUMBING MODIFICATIONS TO ACCOMMODATE ALTERATIONS TO THE EXISTING OFFICE AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
21 documents · 15 drawing sheets
Floor 11
Floor 10
Floor 938p · 3 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
BELAIRE 8 - PLUMBING AND SPRINKLER MODIFICATIONS TO ACCOMMODATE ALTERATIONS AT COFO 9TH FL/ MARKETING 8TH FL AS INDICATED ON PLANS FILED HEREWITH.
On file for this project
13 documents · 2 drawing sheets
Belaire 8 -MODIFICATION OF INTERIOR PARTITIONS AND FINISHES TO ACCOMMODATE ALTERATION AT COFO 9TH FLOOR / MARKETING 8TH FLOOR AS INDICATED ON PLANS FILED HEREWITH.
On file for this project
13 documents · 4 drawing sheets
BELAIRE 8 - MODIFICATION OF HVAC EQUIPMENT AND DUCTWORK TO ACCOMMODATE ALTERATIONS AT COFO 9TH FL / MARKETING 8TH FLOOR AS INDICATED ON PLANS FILED HEREWITH.
On file for this project
5 documents
Floor 83p · 1 filing · 5 docs
Mechanical
BELAIRE 8 - MODIFICATION OF HVAC EQUIPMENT AND DUCTWORK TO ACCOMMODATE ALTERATIONS AT COFO 9TH FL / MARKETING 8TH FLOOR AS INDICATED ON PLANS FILED HEREWITH.
On file for this project
5 documents · 3 drawing sheets
Floor 7
Floor 6
Floor 511p · 1 filing · 5 docs
Mechanical
Issued Permit Scope
Mechanical Systems
Install a new AC unit and ductwork for existing 5th floor offices. (5th floor per DOB CO; 4th Floor per HSS designation on site)
On file for this project
5 documents
Floor 4
Floor 33p · 1 filing · 20 docs
Architecture
Issued Permit Scope
General Construction
Construct new CMU walls for a new electrical switchgear room in the cellar and a new bicycle storage room in the sub-cellar. Bike room is accessory to the hospital which is also located on this zonging lot (refer to ALT 121205579 - 537 East 71 Street)
On file for this project
28 documents
Floor 24p · 1 filing · 20 docs
Architecture
Issued Permit Scope
General Construction
Construct new CMU walls for a new electrical switchgear room in the cellar and a new bicycle storage room in the sub-cellar. Bike room is accessory to the hospital which is also located on this zonging lot (refer to ALT 121205579 - 537 East 71 Street)
On file for this project
28 documents · 1 drawing sheet
Floor 1Under Construction19p · 3 filings · 20 docs
ArchitectureStructural
Issued Permit Scope
General Construction · Structural
Garage repair including replacement of deteriorated sealant, vertica, overhead, topside, and full depth concrete repairs, and traffic coating replacement as per plans filed herewith only. No change to zoning, use, egress
On file for this project
9 documents · 1 drawing sheet
BELAIRE GARAGE -REPAIR WORK TO THE EXISTING REINFORCED CONCRETE PARKING GARAGE.
On file for this project
7 documents
Construct new CMU walls for a new electrical switchgear room in the cellar and a new bicycle storage room in the sub-cellar. Bike room is accessory to the hospital which is also located on this zonging lot (refer to ALT 121205579 - 537 East 71 Street)
On file for this project
28 documents
CellarUnder Construction40p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Structural
Garage repair including replacement of deteriorated sealant, vertica, overhead, topside, and full depth concrete repairs, and traffic coating replacement as per plans filed herewith only. No change to zoning, use, egress
On file for this project
9 documents · 1 drawing sheet
remove 5 sprinkler heads for new electrical switchgear room in cellar.
On file for this project
5 documents
BELAIRE GARAGE -REPAIR WORK TO THE EXISTING REINFORCED CONCRETE PARKING GARAGE.
On file for this project
7 documents · 5 drawing sheets
Latest 3 of 5 filings on this floor.
Sub-Cellar14p · 3 filings · 20 docs
ArchitectureFire ProtectionStructural
Issued Permit Scope
General Construction · Structural
remove 5 sprinkler heads for new electrical switchgear room in cellar.
On file for this project
5 documents · 2 drawing sheets
BELAIRE GARAGE -REPAIR WORK TO THE EXISTING REINFORCED CONCRETE PARKING GARAGE.
On file for this project
7 documents
Construct new CMU walls for a new electrical switchgear room in the cellar and a new bicycle storage room in the sub-cellar. Bike room is accessory to the hospital which is also located on this zonging lot (refer to ALT 121205579 - 537 East 71 Street)
On file for this project
28 documents · 1 drawing sheet
Filed — no permit issued5p · 1 filing · 5 docs
ArchitectureDMGeneral
No filed description on record for this project.
On file for this project
5 documents · 5 drawing sheets