525 EAST 82 STREET
MANHATTAN · Upper East Side-Yorkville · BIN 1051163
💬 Discuss this project
1962Year Built
13Stories
D4Building Class
R8BZoning
95,642 sfGross Floor Area
94Units
LL97 CoveredRent Stabilized7 Open Violations ▸FISP: SAFE
Elevator cooperative · Owner of record: 525 EAST 82 OWNERS CORP · 11,170 sf lot · 8.56 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Roof2p · 3 filings · 10 docs
Penthouse1 filing · 3 docs
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 42 filings · 9 docs
Floor 3
Floor 2
Floor 1
Cellar2 filings · 9 docs
Site & exterior3 filings · 8 docs
Filed — no permit issued3 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
525 EAST 82 OWNERS1503/22/2026
525 EAST 82ND ST OWNERS1403/21/2026
ROSEDALE MANAGEMENT803/21/2026
T-MOBILE407/08/2026
525 E 82ND ST OWNERS403/21/2026
Charter Communications203/22/2026
525 E 82 STREET OWNERS C O ROSED203/21/2026
RESIDENTIAL103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JACK JAFFA & ASSOCIATES103/21/2026
AE DESIGN SOLUTION603/21/2026
KC EXPEDITING1003/21/2026
THERESA VOLTAGGIO103/21/2026
J A EXPEDITING203/21/2026
CCM CONSULTING GROUP, INC.103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EMPIRE NY INSTALLATIONS INCGeneral Contractor903/21/2026
OFF THE WALLCOVERING INCGeneral Contractor303/21/2026
GW MECHANICAL CORPPlumbing308/12/2026
CRYSTAL COMFORT INCGeneral Contractor203/21/2026
S.A.L. ELECTRIC CO INC.Electrical103/22/2026
GIOVANNI DITURIElectrical103/21/2026
GOTHAM COMMUNICATIONS LLCGeneral Contractor107/08/2026
MZZ RENOVATION CORPGeneral Contractor107/08/2026
WATCH HILL WIRELESS SOLUGeneral Contractor107/08/2026
DEMARI SERVICES INCGeneral Contractor107/08/2026
HEMANCHAL DEONARINEElectrical103/21/2026
MICHAEL DAIDONEElectrical103/21/2026
NAUM VAYNERMANElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BIZ DESIGNS LLC6312105/16/2023
DOYUN KIM; RA7415305/18/2022
GROUP-S LLC5216102/27/2022
MARKANICS CORP4600101/21/2022
COWLEY ENGINEERING186104/08/2021
Building Lifecycle
All (124)Filed (14)Permit Issued (12)Signed Off (5)Facade (FISP) (12)Violation (60)Inspection (6)Objection (2)Special Inspection (13)
08/11/2026
Permit issued — Plumbing
M00873439-I1-PL
11/10/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/31/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
09/25/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/23/2025
Permit issued — Plumbing
M00873439-I1-PL
08/07/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/07/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/02/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/10/2024
Signed off — Alteration
INTERIOR RENOVATION OF HALLWAYS AT FLOORS 1-11 AND PENTHOUSE AS PER PLANS FILED HEREWITH
M00869430-I1
02/20/2024
Signed off — Alteration
M00574340-I1
09/18/2023
Permit issued — Plumbing
M00873439-I1-PL
07/12/2023
Permit issued — General Construction
M00873461-I1-GC
06/05/2023
Filed — Alteration
Plumbing work proposed for an existing apartment which has been combined. No change to use, occupancy or egress.
M00873439-I1
06/05/2023
Filed — Alteration
Combination and renovation of two class A apartments as per plans filed herewith. No change to use, occupancy or egress.
M00873461-I1
05/19/2023
Permit issued — General Construction
M00869430-I1-GC
05/16/2023
Filed — Alteration
INTERIOR RENOVATION OF HALLWAYS AT FLOORS 1-11 AND PENTHOUSE AS PER PLANS FILED HEREWITH
M00869430-I1
05/11/2023
Special inspection requirement — Final
Charlotte Dewald
05/11/2023
Special inspection requirement — Lighting in dwelling units
Charlotte Dewald
05/11/2023
Special inspection requirement — Interior lighting power
Charlotte Dewald
05/11/2023
Special inspection requirement — Tenant Protection Plan Compliance
Jeff Akerman
05/11/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeff Akerman
05/11/2023
Special inspection requirement — Energy Code Compliance Inspections
Jeff Akerman
05/03/2023
Special inspection requirement — Final
SHIMON GREENEBAUM
04/22/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/02/2022
Violation issued (HPD, closed)
C
09/02/2022
Violation issued (HPD, closed)
A
09/02/2022
Violation issued (HPD, closed)
A
09/02/2022
Violation issued (HPD, open)
B
08/28/2022
Violation issued (HPD, closed)
A
08/28/2022
Violation issued (HPD, closed)
C
08/21/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/20/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/19/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/26/2022
Signed off — Alteration
M00673932-I1
06/24/2022
Violation issued (HPD, open)
B
06/24/2022
Violation issued (HPD, open)
B
06/24/2022
Violation issued (HPD, closed)
C
06/24/2022
Violation issued (HPD, closed)
A
06/24/2022
Violation issued (HPD, closed)
C
06/24/2022
Violation issued (HPD, open)
B
05/18/2022
Filed — Alteration
FILING TO COMBINE APARTMENTS 10D AND 11C
M00663150-P1
05/18/2022
Filed — Alteration
FILING TO COMBINE APARTMENT 10D AND 11C AS PER TPPN0397
M00663176-P1
05/18/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
DOYUN KIM
05/18/2022
Special inspection requirement — Energy Code Compliance Inspections
DOYUN KIM
05/18/2022
Special inspection requirement — Fire-Resistance Rated Construction
DOYUN KIM
05/18/2022
Special inspection requirement — Final
DOYUN KIM
04/01/2022
Permit issued — General Construction
M00574340-I1-GC
03/02/2022
Permit issued — General Construction
M00673932-I1-GC-CX
02/27/2022
Filed — Alteration
M00673932-I1
01/21/2022
Filed — Alteration
NEW STAIR OPENING WITHIN 11th FLOOR SLAB (FOR NEW STAIR BETWEEN APARTMENTS 10D AND 11C).
M00663824-I1
01/19/2022
Filed — Alteration
FILING TO COMBINE APARTMENT 10D AND 11C AS PER TPPN0397
M00663176-I1
01/19/2022
Filed — Alteration
FILING TO COMBINE APARTMENTS 10D AND 11C
M00663150-I1
01/19/2022
Objection raised — Energy
01/19/2022
Objection resolved — Addressed
11/05/2021
Permit issued — General Construction
M00574340-I1-GC
08/31/2021
Signed off — Alteration
Facade repairs as per plans filed herewith. No change to use, egress, or occupancy.
M00481859-I1
08/20/2021
Filed — Alteration
M00574340-I1
08/10/2021
Special inspection requirement — Final
Gregory Nowak
04/24/2021
Permit issued — General Construction
M00481859-I1-GC
04/08/2021
Filed — Alteration
Facade repairs as per plans filed herewith. No change to use, egress, or occupancy.
M00481859-I1
Latest 60 of 124 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offGW MECHANICAL CORP08/11/2026
DOB NOWPlumbingSigned-offGW MECHANICAL CORP07/23/2025
DOB NOWPlumbingSigned-offGW MECHANICAL CORP09/18/2023
DOB NOWGeneral ConstructionPermit IssuedMZZ RENOVATION CORP07/12/2023
DOB NOWGeneral ConstructionSigned-offOFF THE WALLCOVERING INC05/19/2023
DOB NOWGeneral ConstructionSigned-offWATCH HILL WIRELESS SOLU04/01/2022
DOB NOWGeneral ConstructionSigned-offCRYSTAL COMFORT03/02/2022
DOB NOWGeneral ConstructionSigned-offGOTHAM COMMUNICATIONS LLC11/05/2021
DOB NOWGeneral ConstructionSigned-offDEMARI SERVICES INC04/24/2021
DOB NOWSidewalk ShedPermit IssuedEMPIRE NY INSTALLATIONS I03/26/2021
DOB NOWSidewalk ShedSigned-offEMPIRE NY INSTALLATIONS I03/26/2018
DOB NOWSupported ScaffoldPermit IssuedEMPIRE NY INSTALLATIONS I03/22/2018
BISOTISSUEDDEMARI SERVICES INC12/04/2019
BISOTISSUEDDEMARI SERVICES INC04/16/2018
BISOTISSUEDSAL ANTHONY INTERIOR INC03/20/2017
BISOTISSUEDA L EASTMOND & SONS INC12/09/2016
BISPLISSUEDL&J PLG & HTG CO OF NY IN08/30/2016
BISOTISSUEDNICHIBI ORGANIZATION INC08/17/2016
BISOTISSUEDFIRST CNSTRCTION ZONE INC02/24/2016
BISPLISSUEDACCESS PLUMBING CORP12/08/2015
BISOTISSUEDFIRST CNSTRCTION ZONE INC11/25/2015
BISPLISSUEDA.M.N. CORPORATION11/19/2015
BISOTISSUEDANDREJ RINKOVSKY10/29/2015
BISPLISSUEDACCESS PLUMBING CORP07/09/2015
BISOTISSUEDFIRST CNSTRCTION ZONE INC06/18/2015
BISOTISSUEDSQUAN CONSTRUCTION SERVIC03/11/2015
BISOTISSUEDSQUAN CONSTRUCTION SERVIC11/18/2014
BISFBISSUEDC C CONTROLLED COMBUSTION11/21/2013
BISPLISSUEDCC CONTROLLED PLBG CO INC11/21/2013
BISEQISSUEDALPINE CONSTRUCTION SVC04/12/2011
BISOTISSUEDALPINE CONSTRUCTION SVC12/16/2010
BISEQISSUEDROCKLEDGE SCAFFOLD CORP09/16/2010
BISOTISSUEDRAMAPO COMMUNICATION CORP06/25/2010
BISEQISSUEDROCKLEDGE SCAFFOLD CORP09/11/2009
BISBLISSUEDC C CONTROLLED COMBUSTION01/30/2009
BISOTISSUEDBCI COMMUNICATIONS INC01/20/2009
BISOTISSUEDALPINE CONSTRUCTION SVC09/05/2008
BISOTISSUEDBCI COMMUNICATIONS, INC.03/26/2008
BISOTISSUEDDHI ASSOICATES03/19/2007
BISMHISSUEDDHI ASSOCIATES02/23/2007
+ 16 more permits on file
2 projects · most recent 06/05/2023
Gas Water/Sanitary
FiledStatusContractorScope
06/05/2023Signed-offGW MECHANICAL CORPGas, Water/Sanitary
05/18/2022——Gas, Water/Sanitary
14 projects · most recent 07/08/2025
General Wiring
FiledStatusContractorScope
07/08/2025CompleteELPO ELECTRICAL CONTG INCGeneral Wiring
10/29/2024CompleteS.A.L. ELECTRIC CO INC.General Wiring
11/10/2023Permit IssuedS.A.L. ELECTRIC CO INC.General Wiring
08/30/2022CompleteK & G ELECTRIC CO., INC.General Wiring
05/20/2022CancelledFUSED ELECTRIC CONTNG CORGeneral Wiring
04/11/2022Permit IssuedARGON ELECTRICAL CORPGeneral Wiring
06/24/2021Permit IssuedE & M ELECTRICAL NY CORPGeneral Wiring
02/12/2021Permit IssuedMEGA ELEC'L CONTR'G, INC—
01/12/2021CompleteLEONE ELECTRIC CO. INCGeneral Wiring
11/25/2020Permit IssuedSAFETECH ELECL CONTNG CORGeneral Wiring
02/28/2020Permit IssuedK & G ELECTRIC CO., INC.—
11/19/2019Permit IssuedARGON ELECTRICAL CORPGeneral Wiring
08/09/2018CompleteALEF ELEC'L CONTR'G INC—
01/17/2018CompleteMEGA ELEC'L CONTR'G, INC—
1 project · most recent 01/21/2022
Steel
FiledStatusContractorScope
01/21/2022——Steel
2 projects · most recent 03/24/2021
Sidewalk Shed Scaffold
FiledStatusContractorScope
03/24/2021Permit IssuedEMPIRE NY INSTALLATIONS ISidewalk Shed
03/22/2018Permit IssuedEMPIRE NY INSTALLATIONS IScaffold
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
11/10/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/31/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/25/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/07/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/07/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/02/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
05/11/2023FinalCharlotte Dewaldprogress
05/11/2023Lighting in dwelling unitsCharlotte Dewaldenergy_progress
05/11/2023Interior lighting powerCharlotte Dewaldenergy_progress
05/11/2023Tenant Protection Plan ComplianceJeff Akermanspecial
05/11/2023Fire-Resistant Penetrations and JointsJeff Akermanspecial
05/11/2023Energy Code Compliance InspectionsJeff Akermanprogress
05/03/2023FinalSHIMON GREENEBAUMprogress
05/18/2022Fire-Resistant Penetrations and JointsDOYUN KIMspecial
05/18/2022Energy Code Compliance InspectionsDOYUN KIMprogress
05/18/2022Fire-Resistance Rated ConstructionDOYUN KIMprogress
05/18/2022FinalDOYUN KIMprogress
08/10/2021FinalGregory Nowakprogress
01/18/2018FinalMARK DOOLINGprogress
▾Documents — 294 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch13
09/06/2026M00014316-I1Request digital key ↗
09/06/2026M00012208-I1Request digital key ↗
09/03/2026M00481859-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/15/2026M00468681-I1Request digital key ↗
▸Applications & Permits53
▸BISWORK PERMIT APPLICATION27
12/04/2019123880620Open ↗
04/16/2018123057761Open ↗
03/27/2017122992459Open ↗
Showing 3 of 27 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION25
05/04/2020123880620Open ↗
03/24/2020123880620Open ↗
11/22/2019123880620Open ↗
Showing 3 of 25 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
10/13/2015122437041Open ↗
▸Seals & Professional Certifications72
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION25
11/22/2019123880620Open ↗
01/24/2019123057761Open ↗
01/23/2019123057761Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/06/2026M00012208-I1Open ↗
09/04/2026M00468681-I1Open ↗
09/03/2026M00481859-I1Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT9
11/22/2019123880620Open ↗
04/10/2018123057761Open ↗
01/12/2017122992459Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026M00574340-I1Open ↗
08/29/2026M00012208-I1Open ↗
08/27/2026M00663150-P1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
11/22/2019123880620Open ↗
04/10/2018123057761Open ↗
01/12/2017122992459Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/27/2026M00663150-P1Open ↗
08/22/2026M00869430-I1Open ↗
08/22/2026M00869430-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
12/08/2016140583679Open ↗
08/16/2016140536276Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
12/08/2016140583679Open ↗
08/16/2016140536276Open ↗
▸Trade Schedules & Equipment10
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
12/08/2016140583679Open ↗
11/25/2013121841212Open ↗
Showing 2 of 3 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
07/07/2016122536906Open ↗
11/27/2015122575365Open ↗
06/29/2015122437041Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
09/15/2015122437041Open ↗
09/29/2014121841212Open ↗
▸BISSCHEDULE B - PLUMBING2
08/16/2016140536276Open ↗
11/25/2013121841212Open ↗
▸Safety & Tenant Protection5
▸BISTenant Protection Plan and Notes5
11/22/2019123880620Open ↗
04/10/2018123057761Open ↗
01/12/2017122992459Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos29
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
09/03/2026M00481859-I1Open ↗
09/03/2026M00663176-I1Open ↗
09/03/2026M00663176-P1Open ↗
Showing 3 of 12 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)11
11/22/2019123880620Open ↗
11/22/2019123880620Open ↗
04/10/2018123057761Open ↗
Showing 3 of 11 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
04/18/2011120646676Open ↗
Showing 1 of 3 on file for this type
▸Energy Compliance26
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS13
11/22/2019123880620Open ↗
01/24/2019123057761Open ↗
01/23/2019123057761Open ↗
Showing 3 of 13 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
04/30/2020123880620Open ↗
01/24/2019123057761Open ↗
01/23/2019123057761Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
12/08/2016140583679Open ↗
08/16/2016140536276Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
04/30/2020123880620Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00673932-I1Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026M00673932-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
04/30/2020123880620Open ↗
08/16/2016140536276Open ↗
▸Approvals, Objections & Sign-offs22
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST14
04/30/2020123880620Open ↗
01/24/2019123057761Open ↗
01/23/2019123057761Open ↗
Showing 3 of 14 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
09/14/2018140583679Open ↗
09/29/2014121841212Open ↗
▸Cost, Insurance & Ownership29
▸BISCOST AFFIDAVIT28
05/04/2020123880620Open ↗
04/30/2020123880620Open ↗
03/24/2020123880620Open ↗
Showing 3 of 28 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
12/23/2015122575365Open ↗
▸Filing & Intake Forms25
▸BISEFILING COVER SHEET11
11/22/2019123880620Open ↗
04/10/2018123057761Open ↗
01/12/2017122992459Open ↗
Showing 3 of 11 on file for this type
▸BISBOROUGH INTAKE FORM7
05/04/2020123880620Open ↗
03/24/2020123880620Open ↗
01/24/2019123057761Open ↗
Showing 3 of 7 on file for this type
▸BISADDITIONAL INFORMATION5
05/04/2020123880620Open ↗
03/24/2020123880620Open ↗
05/04/2018123057761Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
12/08/2016140583679Open ↗
08/16/2016140536276Open ↗
▸Other Documents7
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
09/14/2018140583679Open ↗
09/14/2018140583679Open ↗
09/26/2016121841212Open ↗
Showing 3 of 5 on file for this type
▸BISSupporting Document: Fee Exempt2
09/29/2014121841212Open ↗
09/29/2014121841212Open ↗