← Back
Condo, residential unit in elevator building
Park Plaza Condominium
525 KENT AVENUE · BIN 3394276
💬 Discuss this project
2001Year Built
8Stories
R4Building Class
R7XZoning
85,046 sfGross Floor Area
66Units
LL97 CoveredRent Stabilized24 Open Violations ▸FISP: SWARMPFDNY Report ↗
Condo, residential unit in elevator building · Owner of record: 525-535 PARK PLAZA CONDO · 18,454 sf lot · 4.61 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof1p · 1 filing · 9 docs
Basement1p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
STONE EDGE MANAGEMENT109/12/2026
A D GENERAL CONTRACTORS507/08/2026
525-535 PARK PLAZA CONDO803/22/2026
DJR CONSTRUCTION803/22/2026
R & D DEVELOPMENT103/21/2026
PRESIDENT303/21/2026
PARK PLAZA CONDOMINIUM203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SCHERER DESIGN GROUP307/01/2026
VOLUME SPACE CONSULTING INC.112/08/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MICHAEL KATZElectrical203/21/2026
A & D GENERAL CONTR INCGeneral Contractor207/08/2026
KATZ MICHAELElectrical103/21/2026
RICHARD NEUElectrical103/21/2026
SERGIO GIANNACHIElectrical103/21/2026
NEU, RICHARDElectrical103/21/2026
LELIS, ARILSONElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SCHERER DESIGN GROUP7921307/01/2026
Building Lifecycle
All (75)Filed (4)Permit Issued (2)Facade (FISP) (3)Violation (60)Special Inspection (6)
07/01/2026
Filed — Alteration
Installation of new non-emergency gas generator on the roof. No change in use, egress or occupancy.
B01192792-S1
07/01/2026
Filed — Alteration
Installation of new non-emergency gas generator on the roof. No change in use, egress or occupancy.
B01192792-S2
07/01/2026
Filed — Alteration
Installation of new non-emergency gas generator on the roof. No change in use, egress or occupancy.
B01192792-I1
07/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
COLLEEN CONNOLLY
07/01/2026
Special inspection requirement — Post-installed Anchors
COLLEEN CONNOLLY
04/15/2025
Violation issued (HPD, closed)
A
04/15/2025
Violation issued (HPD, closed)
A
04/15/2025
Violation issued (HPD, closed)
A
04/15/2025
Violation issued (HPD, closed)
A
04/15/2025
Violation issued (HPD, closed)
A
04/15/2025
Violation issued (HPD, closed)
A
04/15/2025
Violation issued (HPD, closed)
C
03/26/2025
Special inspection requirement — Tenant Protection Plan Compliance
COLLEEN CONNOLLY
03/26/2025
Special inspection requirement — Tenant Protection Plan Compliance
COLLEEN CONNOLLY
03/10/2025
Special inspection requirement — Mechanical Systems
COLLEEN CONNOLLY
03/10/2025
Special inspection requirement — Final
COLLEEN CONNOLLY
03/09/2025
Violation issued (HPD, closed)
C
03/09/2025
Violation issued (HPD, closed)
A
03/09/2025
Violation issued (HPD, closed)
A
03/09/2025
Violation issued (HPD, closed)
A
03/09/2025
Violation issued (HPD, closed)
A
03/09/2025
Violation issued (HPD, closed)
A
03/09/2025
Violation issued (HPD, closed)
C
03/09/2025
Violation issued (HPD, closed)
A
03/09/2025
Violation issued (HPD, closed)
C
01/30/2025
Violation issued (HPD, closed)
C
01/30/2025
Violation issued (HPD, closed)
C
06/26/2024
Cycle 9 facade report signed — SWARMP
06/26/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/17/2024
Violation issued (ECB, closed)
Construction
06/04/2024
Cycle 9 facade report submitted
04/18/2024
Cycle 9 facade inspection completed
04/15/2024
Violation issued (ECB, closed)
Construction
04/15/2024
Violation issued (ECB, closed)
Construction
04/02/2024
Violation issued (ECB, open)
Construction
03/06/2024
Permit issued — Sidewalk Shed
B00973940-I1-SH
12/08/2023
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00973940-I1
12/08/2023
Permit issued — Sidewalk Shed
B00973940-I1-SH
12/06/2023
Violation issued (ECB, closed)
Construction
07/14/2023
Violation issued (HPD, closed)
C
07/14/2023
Violation issued (HPD, closed)
C
12/22/2022
Violation issued (ECB, closed)
Local Law
03/08/2022
Violation issued (HPD, closed)
A
02/22/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/25/2021
Violation issued (ECB, open)
Local Law
04/19/2021
Violation issued (HPD, closed)
A
03/02/2021
Violation issued (HPD, closed)
C
03/02/2021
Violation issued (HPD, closed)
B
01/08/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/09/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/04/2019
Violation issued (FDNY_NOV, closed)
01/11/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/31/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/18/2018
Violation issued (ECB, closed)
Local Law
01/09/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/18/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/03/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2016
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/29/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/19/2015
Violation issued (HPD, closed)
I
Latest 60 of 75 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedA & D GENERAL CONTR INC03/06/2024
DOB NOWSidewalk ShedPermit IssuedA & D GENERAL CONTR INC12/08/2023
BISPLISSUEDADVANCED PLBG & HTG CORP02/13/2002
BIS—ISSUEDDJR CONSTRUCTION CORP07/18/2001
BISEQRE-ISSUEDDJR CONSTRUCTION CORP03/06/2001
BIS—RE-ISSUEDDJR CONSTRUCTION CORP03/06/2001
BISSPISSUEDCAPITOL FIRE SPKL CO,INC01/04/2001
BISEQISSUEDDJR CONSTRUCTION CORP12/22/2000
BIS—ISSUEDDJR CONSTRUCTION CORP08/04/2000
BISEQISSUEDDJR CONSTRUCTION CORP08/04/2000
BISPLISSUEDBRADFORD MECH. CONTR INC06/21/2000
BIS—ISSUEDDJR CONSTRUCTION CORP06/13/2000
BISEQISSUEDDJR CONSTRUCTION CORP05/11/2000
1 project · most recent 07/01/2026
Generators
FiledStatusContractorScope
07/01/2026——Generators
1 project · most recent 07/01/2026
Gas
FiledStatusContractorScope
07/01/2026——Gas
1 project · most recent 12/08/2023
FiledStatusContractorScope
12/08/2023Permit IssuedRICHARD NEU—
1 project · most recent 12/08/2023
Sidewalk Shed
FiledStatusContractorScope
12/08/2023Permit IssuedA & D GENERAL CONTR INCSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
07/01/2026Fire-Resistant Penetrations and JointsCOLLEEN CONNOLLYspecial
07/01/2026Post-installed AnchorsCOLLEEN CONNOLLYspecial
03/26/2025Tenant Protection Plan ComplianceCOLLEEN CONNOLLYspecial
03/26/2025Tenant Protection Plan ComplianceCOLLEEN CONNOLLYspecial
03/10/2025Mechanical SystemsCOLLEEN CONNOLLYspecial
03/10/2025FinalCOLLEEN CONNOLLYprogress
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/26/2026B00973940-I1Request digital key ↗
08/16/2026B01192792-I1Request digital key ↗
08/16/2026B01192792-S2Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/26/2026B00973940-I1Open ↗
08/16/2026B01192792-S2Open ↗
08/16/2026B01192792-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026B01192792-S1Open ↗
08/25/2026B01192792-S2Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/28/2026B01192792-S1Open ↗