← Back
General warehouse
525 WEST 20 STREET
MANHATTAN · Chelsea-Hudson Yards · BIN 1012295
💬 Discuss this project
1913Year Built
9Stories
E1Building Class
M1-5Zoning
—Gross Floor Area
1Units
17 Open Violations ▸FISP: SWARMP
General warehouse · Owner of record: EKA 521 WEST 20TH STREET LLC · 10.29 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanical
Permit Issued — active, not yet Signed-off
Floor 9Under Construction1 filing · 9 docs
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Under Construction7p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EAGLE POINT PROPERTIES309/30/2026
EKA 521 WEST 20TH STREET LLC203/22/2026
KALIMAN WEST 20TH LLC403/22/2026
KALIMIAN103/22/2026
KALIMIAN WEST 20TH STREET LLC2503/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MK ARCHITECT STUDIO208/24/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RICHARD ESPOSITOElectrical303/21/2026
ABBASI, SAMIRElectrical203/21/2026
GOLDBERG, LElectrical203/21/2026
ICS BUILDERS, INCGeneral Contractor209/30/2026
JOSEPH SORTINOElectrical103/21/2026
PAUL OLSENElectrical103/21/2026
Building Lifecycle
All (87)Filed (2)Permit Issued (2)Facade (FISP) (14)Violation (60)Special Inspection (9)
09/29/2026
Permit issued — Mechanical Systems
M01390909-S1-MS
08/24/2026
Filed — Alteration
MODIFICATIONS TO EXISTING MECHANICAL SYSTEM AS SHOW ON DRAWINGS.
M01390909-I1
04/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
04/22/2026
Special inspection requirement — Final
JOHN MCMONAGLE
04/22/2026
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
04/22/2026
Special inspection requirement — Fire-Resistance Rated Construction
JOHN MCMONAGLE
04/22/2026
Special inspection requirement — Preliminary
JOHN MCMONAGLE
04/22/2026
Special inspection requirement — Insulation placement and R values
JOHN MCMONAGLE
04/22/2026
Special inspection requirement — Lighting controls
JOHN MCMONAGLE
04/22/2026
Special inspection requirement — Interior lighting power
JOHN MCMONAGLE
04/16/2026
Permit issued — General Construction
M01379383-I1-GC
04/13/2026
Filed — Alteration
THIS APPLICATION INVOLVES MINOR RENOVATION AT EXISTING LOADING DOCK. INSTALLATION OF DOOR AND PARTITION AS SHOWN ON DRAWINGS. NO CHANGE TO OCCUPANCY USE OR EGRESS.
M01379383-I1
03/27/2026
Special inspection requirement — Final
MINKUK KIM
03/17/2023
Cycle 9 facade report submitted
03/17/2023
Cycle 9 facade report signed — SWARMP
02/17/2023
Cycle 9 facade inspection completed
05/20/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/20/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/20/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/08/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/08/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/06/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/06/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/03/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/03/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/03/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2016
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2016
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2016
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/08/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/08/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/08/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/02/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/27/2015
Violation issued (ECB, closed)
Construction
10/15/2015
Cycle 7 facade report submitted
10/15/2015
Cycle 8 facade report submitted
09/03/2015
Violation issued (ECB, closed)
Construction
08/26/2015
Violation issued (ECB, closed)
Local Law
05/04/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/04/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/04/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/09/2015
Cycle 7 facade report submitted
04/09/2015
Cycle 8 facade report submitted
04/09/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/09/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/07/2015
Cycle 7 facade inspection completed
04/07/2015
Cycle 7 facade report signed — UNSAFE
04/07/2015
Cycle 8 facade inspection completed
04/07/2015
Cycle 8 facade report signed — UNSAFE
02/20/2015
Violation issued (ECB, closed)
Local Law
10/31/2014
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/31/2014
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/31/2014
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/08/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/08/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/08/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/01/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 87 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedICS BUILDERS, INC09/29/2026
DOB NOWGeneral ConstructionPermit IssuedICS BUILDERS, INC04/16/2026
BISEQISSUEDHOBO CONSTRUCTION CO06/17/2013
BISEQISSUEDSIGNATURE SCAFFOLDING COR05/17/2013
BISOTISSUEDHOBO CONSTRUCTION CO02/28/2013
BISEQISSUEDSIGNATURE SCAFFOLDING COR11/14/2012
BISMHISSUEDCROZIER FINE ARTS INC12/15/1995
BISOTISSUEDCROZIER FINE ARTS INC05/03/1991
1 project · most recent 08/24/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/24/2026Permit IssuedICS BUILDERS, INCHeating and Air Conditioning Systems
Heat / Cool
Liebert MCM040E1YD0XQD 81,200 BTU · Condensing Unit ×1
MMD9ENCJSH50AB6 86,000 BTU ×1
PFH096A-YLN 86,000 BTU · Condensing Unit ×1
PX023UA1CD091Q 81,200 BTU ×1
11 projects · most recent 09/16/2026
General Wiring HVAC Wiring
FiledStatusContractorScope
09/16/2026CompleteALL WAYS ELECTRIC CORP.WHVAC Wiring
09/16/2026CompleteALL WAYS ELECTRIC CORP.WHVAC Wiring
08/25/2026Permit IssuedCAPUTEK ELEC'L SERVICES,—
08/05/2026CompleteALL WAYS ELECTRIC CORP.WGeneral Wiring
05/13/2026CompleteALL WAYS ELECTRIC CORP.WGeneral Wiring
04/27/2026Permit IssuedALL WAYS ELECTRIC CORP.WGeneral Wiring
04/27/2026CompleteALL WAYS ELECTRIC CORP.WGeneral Wiring
03/19/2026CompleteALL WAYS ELECTRIC CORP.WGeneral Wiring
02/10/2026CancelledALL WAYS ELECTRIC CORP.WGeneral Wiring
12/03/2024CompleteALL WAYS ELECTRIC CORP.WGeneral Wiring
12/13/2018CompleteNASH ELECTRIC SERVICES IN—
1 project · most recent 04/13/2026
FiledStatusContractorScope
04/13/2026Permit IssuedICS BUILDERS, INC1 scope_items
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
04/22/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
04/22/2026FinalJOHN MCMONAGLEprogress
04/22/2026Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
04/22/2026Fire-Resistance Rated ConstructionJOHN MCMONAGLEprogress
04/22/2026PreliminaryJOHN MCMONAGLEprogress
04/22/2026Insulation placement and R valuesJOHN MCMONAGLEenergy_progress
04/22/2026Lighting controlsJOHN MCMONAGLEenergy_progress
04/22/2026Interior lighting powerJOHN MCMONAGLEenergy_progress
03/27/2026FinalMINKUK KIMprogress
▾Documents — 113 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/25/2026M01390909-I1Request digital key ↗
08/17/2026M01379383-I1Request digital key ↗
▸Applications & Permits25
▸BISPLAN / WORK APPROVAL APPLICATION20
06/13/2022121406709Open ↗
09/30/2021122816408Open ↗
01/11/2018122852840Open ↗
Showing 3 of 20 on file for this type
▸BISWORK PERMIT APPLICATION4
06/21/2013121683133Open ↗
05/22/2013121411597Open ↗
03/01/2013121406709Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
08/10/2016122852779Open ↗
▸Seals & Professional Certifications22
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
07/12/2017122816408Open ↗
11/08/2013121411597Open ↗
07/23/2013121683133Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/23/2026M01390909-S1Open ↗
09/23/2026M01390909-S1Open ↗
09/23/2026M01390909-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
06/20/2013121683133Open ↗
11/26/2012121411597Open ↗
10/16/2012121406709Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
06/20/2013121683133Open ↗
11/26/2012121411597Open ↗
10/16/2012121406709Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/25/2026M01390909-I1Open ↗
08/17/2026M01379383-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026M01390909-S1Open ↗
09/23/2026M01390909-I1Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
01/25/2017122816408Open ↗
10/31/2016122816408Open ↗
08/11/2016122816408Open ↗
▸Safety & Tenant Protection4
▸DOB NOWCertificate of No Harassment2
08/25/2026M01390909-I1Open ↗
08/13/2026M01379383-I1Open ↗
▸BISHPD-1 - Anti-Harassment Area Checklist1
10/23/2012121406709Open ↗
▸BISANTI-HARASSMENT CHECKLIST1
06/20/2013121683133Open ↗
▸Environmental & Asbestos15
▸BISASBESTOS: CERTIFICATION (DEP ACP5)14
09/22/2016122852911Open ↗
08/11/2016122816408Open ↗
08/11/2016122852582Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026M01379383-I1Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
10/16/2012121406709Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
06/20/2022121406709Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
06/20/2022121406709Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
06/20/2022121406709Open ↗
▸Approvals, Objections & Sign-offs9
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
06/21/2022121406709Open ↗
11/08/2013121411597Open ↗
07/23/2013121683133Open ↗
▸BISADMINISTRATIVE OBJECTIONS3
06/20/2013121683133Open ↗
11/26/2012121411597Open ↗
10/16/2012121406709Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
07/07/2017122816408Open ↗
06/15/2017122816408Open ↗
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
05/22/2013121411597Open ↗
▸Cost, Insurance & Ownership15
▸BISCOST AFFIDAVIT15
06/20/2022121406709Open ↗
07/12/2017122816408Open ↗
10/31/2016122816408Open ↗
Showing 3 of 15 on file for this type
▸Filing & Intake Forms14
▸BISEFILING COVER SHEET14
10/31/2016122816408Open ↗
09/22/2016122852911Open ↗
08/11/2016122816408Open ↗
Showing 3 of 14 on file for this type