← Back
BuildNYC
Elevator apt, fireproof with stores
525 WEST END AVENUE
MANHATTAN · BIN 1033916
💬 Discuss this project
1913Year Built
13Stories
D6Building Class
R10AZoning
171,655 sfGross Floor Area
129Units
LL97 CoveredRent Stabilized1 Active Violation ▸FISP: SAFE
Elevator apt, fireproof with stores · Owner of record: 525 IE · 15,325 sf lot · 11.2 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1 filing
Floor 41 filing
Floor 3
Floor 21 filing
Floor 1
Site & exterior3 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
525 West End6003/22/2026
Imico West End403/21/2026
525 IE103/22/2026
525 West End Owners103/22/2026
Phoenix103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Geiger E A Group403/21/2026
Dominion Expediting303/21/2026
Lombardo Building Consultants203/21/2026
Midtown Preservation Architecture603/21/2026
Aca Associates103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Spring ScaffoldingScaffold903/21/2026
K & G Electric CoElectrical903/21/2026
Skyline Restorationspecialty_contractor403/21/2026
K & G Electric CoElectrical303/22/2026
Sohome WorkGeneral Contractor203/21/2026
Crossfield Plumbing & HeatingPlumbing107/08/2026
L & Z RestorationScaffold107/08/2026
Elpo Electrical ContgElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Choi Engineering2264205/21/2024
Lombardo Professional Engineering8566205/20/2024
Midtown Preservation Architects2634106/22/2023
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 9, sub-cycle B)
The filing window opened 02/21/2026. No Cycle 9 filing on record yet
05/19/2026
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 7A, 7th STORY, 1st APARTMENT FROM EAST AT…
HPD violation · closed
04/27/2026
Boiler inspection report filed
Initial · no defects · Accepted
02/24/2026
Elevator Category 1 inspection report filed
06/25/2025
Boiler inspection report filed
Initial · no defects · Accepted
212 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—Spring Scaffolding—
DOB NOW—Skyline Restoration—
DOB NOW—Crossfield Plumbing & Heating—
DOB NOW—Sohome Work—
DOB NOW—Skyline Restoration—
DOB NOW—Skyline Restoration—
DOB NOW—Spring Scaffolding—
DOB NOW—Skyline Restoration—
DOB NOW—Spring Scaffolding—
DOB NOW—Michael Dellavecchia & Sons—
BIS—L & Z Restoration—
BIS—Jez Construction—
BIS—Jez Construction—
BIS—P.S.I. Mechanical—
BIS—Jez Construction—
BIS—P.S.I. Mechanical—
BIS—Jez Construction—
BIS—Phoenix Sutton STR—
BIS—P.S.I. Mechanical—
BIS—Jez Construction—
BIS—L & Z Restoration—
BIS—L & Z Restoration—
BIS—Phoenix Sutton STR—
BIS—United Chimney—
BIS—Marlande Heating—
BIS—Alklem Plumbing—
BIS—Accura Rest. & Waterproof—
BIS—Spring Scaffolding—
BIS—Rockledge Scaffold—
BIS—L & Z Restoration—
BIS—L & Z Restoration—
BIS—Rockledge Scaffold—
BIS—Marlande Heating—
BIS—Lusheba Contracting—
BIS—Lusheba Contracting—
BIS—P.S.I. Mechanical—
BIS—Siren Management—
BIS—All Makes Heating & A/C—
BIS—Tenta NY—
BIS—Universal Builders Supply—
+ 20 more permits on file
Nothing on file for this building.
Nothing on file for this building.
482 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account