| Owner | Filings | Most Recent |
|---|---|---|
| JB CONSTRUCTION DESIGN | 11 | 08/28/2026 |
| EMPIRE MANAGEMENT CONST | 12 | 07/08/2026 |
| HPD | 5 | 04/09/2026 |
| ACE GROUP NY CORP. | 7 | 03/22/2026 |
| 526-528 4TH AVE LLC | 20 | 03/22/2026 |
| N TECH DESIGN OF AMERICIA | 3 | 03/22/2026 |
| 526-528 AVENUE, LLC | 1 | 03/22/2026 |
| PHIZER PLITZER 181 REAL | 8 | 03/22/2026 |
| RENNON CONSTRUCTION | 6 | 03/22/2026 |
| VIPER AUTO CENTER INC | 2 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| TITAN ENGINEERS PC | 3 | 08/25/2026 |
| VASILIOS ARTEMIOU PE | 4 | 07/15/2026 |
| VOLUME SPACE CONSULTING INC. | 2 | 01/15/2026 |
| ADROIT ENGINEERING PLLC | 3 | 11/05/2025 |
| THOMAS SCIBILIA | 1 | 12/18/2024 |
| CHOSEN MEP, CORP. | 2 | 05/02/2024 |
| BAOBAB ARCHITECTS P.C. | 1 | 11/29/2023 |
| ASHRAF CORP | 1 | 03/24/2022 |
| Representative | Filings | Most Recent |
|---|---|---|
| GREEN STUDIO | 4 | 03/21/2026 |
| ELLIPSES DESIGN | 3 | 03/21/2026 |
| BUILDINGS REPRISENTATIVE LLC | 2 | 03/21/2026 |
| RENNON CONSTRUCTION | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| ACE GROUP NY CORP | General Contractor | 3 | 03/21/2026 |
| M.R. ELEC'L SERVICE LLC | Electrical | 2 | 03/22/2026 |
| EMPIRE MANAGEMENT & CON* | General Contractor | 2 | 07/08/2026 |
| N TECH DESIGN OF AMERICA | General Contractor | 2 | 07/08/2026 |
| RENNON CONSTRUCTION CORP | General Contractor | 2 | 04/09/2026 |
| ENSMAN ALEXANDER | Electrical | 1 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| ADROIT ENGINEERING PLLC | 8885 | 1 | 05/05/2025 |
| HRF SERVICES CORP | 5616 | 1 | 11/29/2023 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Protection and Mechanical Methods | Signed-off | N TECH DESIGN OF AMERICA | 11/28/2025 |
| DOB NOW | Full Demolition | Signed-off | N TECH DESIGN OF AMERICA | 11/26/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | ACE GROUP NY CORP | 11/14/2025 |
| DOB NOW | Construction Fence | Permit Issued | EMPIRE MANAGEMENT & CON* | 10/30/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | EMPIRE MANAGEMENT & CON* | 06/20/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | RENNON CONSTRUCTION CORP | 04/14/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | RENNON CONSTRUCTION CORP | 03/24/2022 |
| BIS | OT | ISSUED | MAZ 247 CORP | 03/23/2018 |
| BIS | OT | ISSUED | PAUL SIGNS INC | 09/17/2003 |
| BIS | — | ISSUED | CLERMONT GENERAL CONSTRUCTION | 01/20/1993 |
| BIS | PL | ISSUED | I.M.P. PLBG. & HTG. CORP | 05/13/1992 |
| BIS | — | ISSUED | CLERMONT GENERAL CONSTRUCTION | 04/30/1991 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/25/2026 | — | — | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Daikin RXTA36AAVJU 37,000 BTU · Vrf Outdoor ×70 FXSA30AAVJUA 812 CFM · Vrf Indoor ×53 RXTA24AAVJU 25,000 BTU · Vrf Outdoor ×26 FXSA24AAVJUA 742 CFM · Vrf Indoor ×23 FXSA36AAVJUA 1,130 CFM · Vrf Indoor ×17 FXSA48AAVJUA 1,307 CFM · Vrf Indoor ×6 RXTA48AAVJU 46,000 BTU · Vrf Outdoor ×6 FXSA15AAVJUA 530 CFM · Vrf Indoor ×3 FXSA07AAVJUA 281 CFM · Vrf Indoor ×2 Ventilation Greenheck ERVe-20-15L 1,235 CFM · Erv ×1 |
| 05/02/2024 | — | — | Air Conditioning Systems, Heating Systems | Cooling Heating |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/25/2026 | — | — | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/25/2026 | — | — | Storm, Water/Sanitary |
| 05/02/2024 | — | — | Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/25/2026 | Permit Issued | POWER DIRECT ELECTRIC INC | General Wiring |
| 06/25/2026 | Permit Issued | POWER DIRECT ELECTRIC INC | 101 meters, 101 new_meters |
| 12/11/2025 | Permit Issued | M.R. ELEC'L SERVICE LLC | General Wiring |
| 12/02/2025 | Permit Issued | POWER DIRECT ELECTRIC INC | General Wiring |
| 12/02/2025 | Permit Issued | POWER DIRECT ELECTRIC INC | 102 meters, 102 new_meters |
| 12/02/2025 | Permit Issued | POWER DIRECT ELECTRIC INC | 1 meters, 1 new_meters |
| 12/30/2022 | Permit Issued | HIGH QUALITY ELECTRIC OF | — |
| 05/16/2018 | Complete | FIBERTEK DATA & ELEC CORP | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/15/2026 | Signed-off | ACE GROUP NY CORP | Sidewalk Shed |
| Date | Type | Result | Report |
|---|---|---|---|
| 12/03/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 09/01/2026 | Exterior lighting power | — | energy_progress |
| 09/01/2026 | Maintenance information | — | energy_progress |
| 09/01/2026 | Metering | — | energy_progress |
| 09/01/2026 | Lighting controls | — | energy_progress |
| 09/01/2026 | Lighting in dwelling units | — | energy_progress |
| 09/01/2026 | Protection of exposed foundation insulation | — | energy_progress |
| 09/01/2026 | Electrical motors and elevators | — | energy_progress |
| 09/01/2026 | Vestibules | — | energy_progress |
| 09/01/2026 | Air barrier continuity plan testing | — | energy_progress |
| 08/24/2026 | Deep Foundation Elements | — | special |
| 08/24/2026 | Footing and Foundation | — | progress |
| 08/24/2026 | Final | — | progress |
| 08/24/2026 | Subsurface Investigations (Borings/Test Pits) | — | special |
| 08/24/2026 | Subsurface Conditions – Fill Placement & In-Place Density | — | special |
| 08/24/2026 | Subgrade Inspections | — | special |
| 08/24/2026 | Structural Stability – Alterations of existing buildings | — | special |
| 08/24/2026 | Concrete - Cast-In-Place | — | special |
| 08/24/2026 | Underpinning | — | special |
| 08/20/2026 | Subsurface Conditions – Fill Placement & In-Place Density | — | special |
| 08/20/2026 | Structural Steel - Details | — | special |
| 08/20/2026 | Structural Steel - High Strength Bolting | — | special |
| 08/20/2026 | Subsurface Investigations (Borings/Test Pits) | — | special |
| 08/20/2026 | Deep Foundation Elements | — | special |
| 08/20/2026 | Subgrade Inspections | — | special |
| 08/20/2026 | Concrete - Cast-In-Place | — | special |