← Back
Walk-up apt, over six families with stores
526 4 AVENUE
💬 Discuss this project
1931Year Built
4Stories
C7Building Class
C4-4DZoning
—Gross Floor Area
8Units
0 Open ViolationsFDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: 526-528 4TH AVE, LLC · 3.27 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionCivilGeneral
Roof10p · 3 filings · 20 docs
Bulkhead5p · 1 filing · 15 docs
Floor 173p · 1 filing · 15 docs
Floor 164p · 1 filing · 15 docs
Floor 151p · 1 filing · 15 docs
Floor 141p · 1 filing · 15 docs
Floor 133p · 1 filing · 15 docs
Floor 123p · 1 filing · 15 docs
Floor 113p · 1 filing · 15 docs
Floor 10
Floor 9
Floor 8
Floor 74p · 1 filing · 15 docs
Floor 64p · 1 filing · 15 docs
Floor 5
Floor 44p · 2 filings · 20 docs
Floor 32p · 1 filing · 16 docs
Floor 25p · 3 filings · 20 docs
Floor 18p · 3 filings · 20 docs
Cellar5p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JB CONSTRUCTION DESIGN1108/28/2026
EMPIRE MANAGEMENT CONST1207/08/2026
HPD504/09/2026
ACE GROUP NY CORP.703/22/2026
526-528 4TH AVE LLC2003/22/2026
N TECH DESIGN OF AMERICIA303/22/2026
526-528 AVENUE, LLC103/22/2026
PHIZER PLITZER 181 REAL803/22/2026
RENNON CONSTRUCTION603/22/2026
VIPER AUTO CENTER INC203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TITAN ENGINEERS PC308/25/2026
VASILIOS ARTEMIOU PE407/15/2026
VOLUME SPACE CONSULTING INC.201/15/2026
ADROIT ENGINEERING PLLC311/05/2025
THOMAS SCIBILIA112/18/2024
CHOSEN MEP, CORP.205/02/2024
BAOBAB ARCHITECTS P.C.111/29/2023
ASHRAF CORP103/24/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GREEN STUDIO403/21/2026
ELLIPSES DESIGN303/21/2026
BUILDINGS REPRISENTATIVE LLC203/21/2026
RENNON CONSTRUCTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ACE GROUP NY CORPGeneral Contractor303/21/2026
M.R. ELEC'L SERVICE LLCElectrical203/22/2026
EMPIRE MANAGEMENT & CON*General Contractor207/08/2026
N TECH DESIGN OF AMERICAGeneral Contractor207/08/2026
RENNON CONSTRUCTION CORPGeneral Contractor204/09/2026
ENSMAN ALEXANDERElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ADROIT ENGINEERING PLLC8885105/05/2025
HRF SERVICES CORP5616111/29/2023
Building Lifecycle
All (180)Filed (17)Permit Issued (7)Signed Off (3)Violation (60)Inspection (1)Objection (62)Special Inspection (30)
09/01/2026
Special inspection requirement — Vestibules
09/01/2026
Special inspection requirement — Exterior lighting power
09/01/2026
Special inspection requirement — Electrical motors and elevators
09/01/2026
Special inspection requirement — Air barrier continuity plan testing
09/01/2026
Special inspection requirement — Metering
09/01/2026
Special inspection requirement — Lighting controls
09/01/2026
Special inspection requirement — Maintenance information
09/01/2026
Special inspection requirement — Protection of exposed foundation insulation
09/01/2026
Special inspection requirement — Lighting in dwelling units
08/25/2026
Filed — New Building
Plumbing work in conjunction with the NB application #B01148119-I1
B01148119-S2
08/25/2026
Filed — New Building
Plumbing work in conjunction with the NB application #B01148119-I1
B01148119-S8
08/24/2026
Filed — New Building
Plumbing work in conjunction with the NB application #B01148119-I1
B01148119-S1
08/24/2026
Special inspection requirement — Footing and Foundation
08/24/2026
Special inspection requirement — Underpinning
08/24/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
08/24/2026
Special inspection requirement — Deep Foundation Elements
08/24/2026
Special inspection requirement — Concrete - Cast-In-Place
08/24/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
08/24/2026
Special inspection requirement — Subgrade Inspections
08/24/2026
Special inspection requirement — Final
08/24/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
08/20/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
08/20/2026
Special inspection requirement — Concrete - Cast-In-Place
08/20/2026
Special inspection requirement — Subgrade Inspections
08/20/2026
Special inspection requirement — Masonry
08/20/2026
Special inspection requirement — Concrete - Precast
08/20/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
08/20/2026
Special inspection requirement — Concrete - Cast-In-Place
08/20/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
08/20/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
08/20/2026
Special inspection requirement — Deep Foundation Elements
08/20/2026
Special inspection requirement — Post-installed Anchors
08/20/2026
Special inspection requirement — Structural Steel - Details
08/12/2026
Objection resolved — Resolved
08/10/2026
Objection raised — Other
07/15/2026
Filed — New Building
Plumbing work in conjunction with the NB application #B01148119-I1
B01148119-S6
07/15/2026
Objection resolved — Open
07/08/2026
Objection resolved — Resolved
07/02/2026
Objection raised — Other
06/23/2026
Objection raised — Other
06/10/2026
Objection resolved — Addressed
06/08/2026
Filed — New Building
Plumbing work in conjunction with the NB application #B01148119-I1
B01148119-S5
06/06/2026
Objection raised — Other
05/27/2026
Objection resolved — Resolved
05/26/2026
Filed — New Building
Plumbing work in conjunction with the NB application #B01148119-I1
B01148119-S4
05/26/2026
Filed — New Building
Plumbing work in conjunction with the NB application #B01148119-I1
B01148119-S7
05/01/2026
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01317973-I1
02/13/2026
Signed off — Full Demolition
Full demolition to a four story building
B01205399-I1
01/15/2026
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01317973-P1
12/18/2025
Violation issued (ECB, closed)
Construction
12/11/2025
Violation issued (ECB, closed)
Unknown
12/11/2025
Violation issued (ECB, closed)
Construction
12/03/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/28/2025
Permit issued — Protection and Mechanical Methods
B01205399-S1-PMM
11/26/2025
Permit issued — Full Demolition
B01205399-I1-FD
11/18/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Permit issued — Sidewalk Shed
B01317973-I1-SH
11/12/2025
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01317973-I1
11/07/2025
Signed off — Alteration
B00661995-I1
11/05/2025
Filed — Full Demolition
Full demolition to a four story building
B01205399-S1
Latest 60 of 180 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWProtection and Mechanical MethodsSigned-offN TECH DESIGN OF AMERICA11/28/2025
DOB NOWFull DemolitionSigned-offN TECH DESIGN OF AMERICA11/26/2025
DOB NOWSidewalk ShedSigned-offACE GROUP NY CORP11/14/2025
DOB NOWConstruction FencePermit IssuedEMPIRE MANAGEMENT & CON*10/30/2025
DOB NOWSidewalk ShedSigned-offEMPIRE MANAGEMENT & CON*06/20/2025
DOB NOWSidewalk ShedSigned-offRENNON CONSTRUCTION CORP04/14/2025
DOB NOWSidewalk ShedSigned-offRENNON CONSTRUCTION CORP03/24/2022
BISOTISSUEDMAZ 247 CORP03/23/2018
BISOTISSUEDPAUL SIGNS INC09/17/2003
BIS—ISSUEDCLERMONT GENERAL CONSTRUCTION01/20/1993
BISPLISSUEDI.M.P. PLBG. & HTG. CORP05/13/1992
BIS—ISSUEDCLERMONT GENERAL CONSTRUCTION04/30/1991
2 projects · most recent 08/25/2026
Heating and Air Conditioning Systems Ventilation Systems Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
08/25/2026——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin RXTA36AAVJU 37,000 BTU · Vrf Outdoor ×70
FXSA30AAVJUA 812 CFM · Vrf Indoor ×53
RXTA24AAVJU 25,000 BTU · Vrf Outdoor ×26
FXSA24AAVJUA 742 CFM · Vrf Indoor ×23
FXSA36AAVJUA 1,130 CFM · Vrf Indoor ×17
FXSA48AAVJUA 1,307 CFM · Vrf Indoor ×6
RXTA48AAVJU 46,000 BTU · Vrf Outdoor ×6
FXSA15AAVJUA 530 CFM · Vrf Indoor ×3
FXSA07AAVJUA 281 CFM · Vrf Indoor ×2
Ventilation
Greenheck ERVe-20-15L 1,235 CFM · Erv ×1
05/02/2024——Air Conditioning Systems, Heating Systems
1 project · most recent 08/25/2026
Sprinkler System
FiledStatusContractorScope
08/25/2026——Sprinkler System
2 projects · most recent 08/25/2026
Storm Water/Sanitary
FiledStatusContractorScope
08/25/2026——Storm, Water/Sanitary
05/02/2024——Storm, Water/Sanitary
8 projects · most recent 06/25/2026
General Wiring
FiledStatusContractorScope
06/25/2026Permit IssuedPOWER DIRECT ELECTRIC INCGeneral Wiring
06/25/2026Permit IssuedPOWER DIRECT ELECTRIC INC101 meters, 101 new_meters
12/11/2025Permit IssuedM.R. ELEC'L SERVICE LLCGeneral Wiring
12/02/2025Permit IssuedPOWER DIRECT ELECTRIC INCGeneral Wiring
12/02/2025Permit IssuedPOWER DIRECT ELECTRIC INC102 meters, 102 new_meters
12/02/2025Permit IssuedPOWER DIRECT ELECTRIC INC1 meters, 1 new_meters
12/30/2022Permit IssuedHIGH QUALITY ELECTRIC OF—
05/16/2018CompleteFIBERTEK DATA & ELEC CORPGeneral Wiring
1 project · most recent 01/15/2026
Sidewalk Shed
FiledStatusContractorScope
01/15/2026Signed-offACE GROUP NY CORPSidewalk Shed
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
12/03/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 82
DateRequirementInspectorRole
09/01/2026Exterior lighting power—energy_progress
09/01/2026Maintenance information—energy_progress
09/01/2026Metering—energy_progress
09/01/2026Lighting controls—energy_progress
09/01/2026Lighting in dwelling units—energy_progress
09/01/2026Protection of exposed foundation insulation—energy_progress
09/01/2026Electrical motors and elevators—energy_progress
09/01/2026Vestibules—energy_progress
09/01/2026Air barrier continuity plan testing—energy_progress
08/24/2026Deep Foundation Elements—special
08/24/2026Footing and Foundation—progress
08/24/2026Final—progress
08/24/2026Subsurface Investigations (Borings/Test Pits)—special
08/24/2026Subsurface Conditions – Fill Placement & In-Place Density—special
08/24/2026Subgrade Inspections—special
08/24/2026Structural Stability – Alterations of existing buildings—special
08/24/2026Concrete - Cast-In-Place—special
08/24/2026Underpinning—special
08/20/2026Subsurface Conditions – Fill Placement & In-Place Density—special
08/20/2026Structural Steel - Details—special
08/20/2026Structural Steel - High Strength Bolting—special
08/20/2026Subsurface Investigations (Borings/Test Pits)—special
08/20/2026Deep Foundation Elements—special
08/20/2026Subgrade Inspections—special
08/20/2026Concrete - Cast-In-Place—special
Latest 25 of 82.
▾Documents — 70 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
08/30/2026B00661995-I1Request digital key ↗
08/25/2026B00967586-S2Request digital key ↗
08/25/2026B00967586-S1Request digital key ↗
Showing 3 of 15 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
03/26/2018321722864Open ↗
▸BISWORK PERMIT APPLICATION1
03/26/2018321722864Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B01148119-I1Open ↗
▸Seals & Professional Certifications22
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/30/2026B00661995-I1Open ↗
08/21/2026B01205399-S1Open ↗
08/21/2026B01205399-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/24/2026B01205399-I1Open ↗
08/24/2026B01205399-I1Open ↗
08/23/2026B00967586-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/23/2026B00967586-I1Open ↗
08/23/2026B00967586-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/26/2018321722864Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/26/2018321722864Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
03/26/2018321722864Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWSewer Cut-Off1
08/13/2026B01205399-I1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026B01205399-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026B01205399-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026B01205399-I1Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes1
03/26/2018321722864Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026B01148119-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/15/2026B01205399-I1Open ↗
08/13/2026B00967586-S1Open ↗
08/13/2026B00967586-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/26/2018321722864Open ↗
▸DOB NOWRodent Control1
08/13/2026B01205399-I1Open ↗
▸Energy Compliance3
▸BISAS-BUILT ENERGY ANALYSIS1
12/03/2020321722864Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
12/03/2020321722864Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/26/2018321722864Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY2
12/03/2020321722864Open ↗
12/03/2020321722864Open ↗
▸DOB NOWSOIL REPORT2
08/23/2026B01148119-S2Open ↗
08/23/2026B01148119-S1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/11/2020321722864Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
03/26/2018321722864Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
12/11/2020321722864Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
03/26/2018321722864Open ↗
▸Other Documents7
▸DOB NOWProperty Ownership Certification2
08/16/2026B01148119-I1Open ↗
08/15/2026B01205399-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B01148119-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B01148119-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026B01205399-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026B01205399-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026B01205399-I1Open ↗