BuildNYC
Office with commercial, 7-19 stories
526 7TH AVENUE
MANHATTAN · BIN 1014484
💬 Discuss this project
1924Year Built
10Stories
O6Building Class
M1-9A/R12Zoning
21,100 sfGross Floor Area
14Units
0 Active Violations 2 old, status unconfirmed ▸FISP: No Report Filed
Office with commercial, 7-19 stories · Owner of record: SMC 526 Seventh · 2,010 sf lot · 10.5 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofLTE AC equipment installation1 filing · 3 docs
Floor 8Breezm2p · 1 filing · 4 docs
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 11st floor commercial space sound capability2p · 1 filing · 8 docs
Site & exteriorPhilario Perfume21p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SMC 526 Seventh2803/22/2026
Sutton Garrett Realty1409/13/2026
Jerrick Associates303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Serdar Ceylan Architect404/23/2026
Southern Associates201/28/2025
Carlton Associates102/23/2024
Royal T&E301/14/2020
Scherer Design Group103/30/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Elcherbini Architects403/21/2026
DVA Advisors103/21/2026
CCM Services Group103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Metropolitan Wireless*General Contractor603/21/2026
Phoenix Sutton STRScaffold403/21/2026
Newport DesignsGeneral Contractor303/21/2026
Cross Hudson ElectricalElectrical203/21/2026
Neptune Signs & AwningsSign hanger208/14/2026
M & M Control WiringElectrical103/21/2026
Crocitto, Jr., WilliamElectrical103/21/2026
JC Consulting & ManagementGeneral Contractor107/08/2026
John Evan ContractingGeneral Contractor106/28/2026
John Evan ContractingScaffold107/08/2026
Amsterdam ElectricElectrical103/21/2026
S & D Electrical/MechanicalElectrical103/21/2026
Applied ElectricElectrical103/21/2026
A J Ianni Electrical ContsElectrical103/21/2026
Switch Electric of the FiveElectrical103/21/2026
Building Lifecycle
All (113)Filed (11)Permit Issued (10)Signed Off (6)Facade (FISP) (11)Violation (54)Objection (10)Special Inspection (11)
08/14/2026
Signed off — Alteration
PROPOSED OF TWO ILLUMINATING SIGN FACING ON 7TH AVENUE ON THE FIRST FLOOR OF AN EXISTING EATING AND DRINKING ESTABLISHMENT.
M01385289-I1
08/14/2026
Signed off — Alteration
RENOVATION AND COSMETIC UPGRADE OF THE EXISTING STOREFRONT FACADE OF AN EXISTING COMMERCIAL RETAIL SPACE.
M01385625-I1
08/14/2026
Signed off — Alteration
INSTALLATION OF CONSTRUCTION FENCE AS PER PLANS SUBMITTED.
M01385079-I1
08/13/2026
Permit issued — Sign
M01385289-I1-SG
08/12/2026
Permit issued — Sign
M01385278-I1-SG
06/22/2026
Permit issued — General Construction
M01385625-I1-GC
06/18/2026
Permit issued — Construction Fence
M01385079-I1-FN
05/15/2026
Objection raised — Other
05/15/2026
Objection resolved — Resolved
05/15/2026
Objection resolved — Addressed
05/11/2026
Objection raised — Other
05/11/2026
Objection resolved — Resolved
05/11/2026
Objection raised — Other
05/11/2026
Objection resolved — Resolved
05/06/2026
Objection raised — Scope
04/23/2026
Filed — Alteration
PROPOSED OF TWO ILLUMINATING SIGN FACING ON 7TH AVENUE ON THE FIRST FLOOR OF AN EXISTING EATING AND DRINKING ESTABLISHMENT.
M01385289-I1
04/23/2026
Filed — Alteration
PROPOSED OF TWO ILLUMINATING SIGN ON THE FIRST FLOOR OF AN EXISTING EATING AND DRINKING ESTABLISHMENT
M01385278-I1
04/22/2026
Filed — Alteration
RENOVATION AND COSMETIC UPGRADE OF THE EXISTING STOREFRONT FACADE OF AN EXISTING COMMERCIAL RETAIL SPACE.
M01385625-I1
04/22/2026
Filed — Alteration
INSTALLATION OF CONSTRUCTION FENCE AS PER PLANS SUBMITTED.
M01385079-I1
04/21/2026
Special inspection requirement — Fenestration areas
SERDAR CEYLAN
04/21/2026
Special inspection requirement — Final
SERDAR CEYLAN
04/21/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SERDAR CEYLAN
04/21/2026
Special inspection requirement — Fenestration air leakage
SERDAR CEYLAN
04/21/2026
Special inspection requirement — Energy Code Compliance Inspections
SERDAR CEYLAN
04/13/2026
Special inspection requirement — Final
SERDAR CEYLAN
04/10/2026
Special inspection requirement — Insulation placement and R values
SERDAR CEYLAN
04/10/2026
Special inspection requirement — Exterior lighting power
SERDAR CEYLAN
02/04/2025
Permit issued — General Construction
M01167908-I1-GC
01/28/2025
Filed — Alteration
Plumbing work associated with interior renovation of commercial space. No change in use, egress or occupancy. All as per plans and applications.
M01167908-S1
01/28/2025
Filed — Alteration
Plumbing work associated with interior renovation of commercial space. No change in use, egress or occupancy. All as per plans and applications.
M01167908-I1
01/16/2025
Signed off — Alteration
M01006188-I1
01/16/2025
Special inspection requirement — Final
ABDALLAH ELCHERBINI
02/27/2024
Permit issued — General Construction
M01006188-I1-GC
02/23/2024
Filed — Alteration
M01006188-I1
02/18/2024
Cycle 9 facade inspection completed
02/16/2024
Special inspection requirement — Final
Michael Carlton
04/13/2023
Violation issued (ECB, closed)
Construction
03/21/2023
Cycle 9 facade report submitted
02/22/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/17/2021
Violation issued (ECB, closed)
Construction
07/21/2020
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M00233186-I1
07/01/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/01/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/21/2020
Violation issued (ECB, closed)
Construction
02/12/2020
Cycle 8 facade report signed — SWARMP
02/10/2020
Cycle 8 facade inspection completed
01/15/2020
Special inspection requirement — Final
BRIAN T. O'CONNOR
01/14/2020
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M00233186-P2
11/15/2019
Violation issued (ECB, closed)
Construction
09/27/2019
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M00233186-P1
09/23/2019
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M00233186-I1
09/23/2019
Permit issued — Sidewalk Shed
M00233186-I1-SF
09/23/2019
Permit issued — Sidewalk Shed
M00233186-I1-SH
09/11/2019
Signed off — Alteration
AT&T - Replacement and installation of RRH units on roof. Removal and installation of cabinets on existing equipment platform on roof. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.
M00014317-I1
09/03/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/12/2019
Violation issued (ECB, closed)
Construction
01/14/2019
Violation issued (ECB, closed)
Local Law
11/09/2018
Permit issued — Antenna
M00014317-I1-AN
11/08/2018
Violation issued (ECB, closed)
Construction
08/20/2018
Cycle 8 facade report submitted
Latest 60 of 113 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offNeptune Signs & Awnings08/13/2026
DOB NOWSignPermit IssuedNeptune Signs & Awnings08/12/2026
DOB NOWGeneral ConstructionSigned-offJohn Evan Contracting06/22/2026
DOB NOWConstruction FenceSigned-offJohn Evan Contracting06/18/2026
DOB NOWGeneral ConstructionPermit IssuedJC Consulting & Manageme*02/04/2025
DOB NOWGeneral ConstructionSigned-offNewport Designs02/27/2024
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR09/23/2019
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR09/23/2019
DOB NOWAntennaSigned-offMetropolitan Wireless*11/09/2018
DOB NOWAntennaSigned-offMetropolitan Wireless*04/20/2018
BISPLISSUEDA Plus Plumbing10/21/2020
BISSPISSUEDA + Sprinkler10/21/2020
BISOTISSUEDOriole Builders10/19/2020
BISOTISSUEDSH Interiors01/02/2020
BISOTISSUEDPhoenix Sutton STR12/05/2019
BISOTISSUEDMetropolitan Wireless*10/07/2016
BISOTISSUEDMetropolitan Wireless*06/20/2016
BISOTISSUEDMetropolitan Wireless*02/02/2016
BISOTISSUEDMetropolitan Wireless*10/20/2015
BISPLISSUEDPinnacle Plumbing & Heating09/30/2015
BISOTISSUEDSalt and Light of 2000'S09/24/2015
BISEQISSUEDSalt and Light of 2000'S09/09/2015
BISPLISSUEDAll Pro Plumbing & Heating11/17/2014
BISOTISSUEDTetaj Painting10/31/2014
BISEQISSUEDDahill Construction Co., I08/27/2014
BISOTISSUEDDahill Construction Co., I08/27/2014
BISOTISSUEDAmerican C Construction11/22/2013
BISOTISSUEDJerrick Associates09/24/2012
BISOTISSUEDCrosslink Wireless08/31/2011
BISEQISSUEDJerrick Associates07/26/2011
BISOTISSUEDCrosslink Wireless05/10/2011
BISPLISSUEDQMB Plumbing & Heating04/08/2011
BISOTISSUEDSin Kai Enterprises03/30/2011
BISEQISSUEDSin Kai Enterprises03/22/2011
BISOTISSUEDSquan Construction Services06/30/2010
BISPLISSUEDSpeedway Plumbing06/28/2010
BISOTISSUEDWoodhaven A & A Construction06/18/2010
BISOTISSUEDCommercial Towers09/14/2006
BISMHISSUEDDavrial Enterprises05/13/2002
BISFPISSUEDChief Fire Prevention & Filter S10/11/2000
+ 20 more permits on file
1 project · most recent 01/28/2025
Water/Sanitary
FiledStatusContractorScope
01/28/2025——Water/Sanitary
3 projects · most recent 10/14/2026
FiledStatusContractorScope
10/14/2026Permit IssuedBorowide Elect'l Contractors—
07/29/2020Permit IssuedLaredo Electric2 meters, 1 new_meters
09/13/2019CompleteElpo Electrical Contg—
1 project · most recent 04/22/2026
Fence
FiledStatusContractorScope
04/22/2026Signed-offJohn Evan ContractingFence
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
04/21/2026Fenestration areasSERDAR CEYLANenergy_progress
04/21/2026FinalSERDAR CEYLANprogress
04/21/2026Fenestration and door U-factor and product ratingsSERDAR CEYLANenergy_progress
04/21/2026Fenestration air leakageSERDAR CEYLANenergy_progress
04/21/2026Energy Code Compliance InspectionsSERDAR CEYLANprogress
04/13/2026FinalSERDAR CEYLANprogress
04/10/2026Insulation placement and R valuesSERDAR CEYLANenergy_progress
04/10/2026Exterior lighting powerSERDAR CEYLANenergy_progress
01/16/2025FinalABDALLAH ELCHERBINIprogress
02/16/2024FinalMichael Carltonprogress
01/15/2020FinalBRIAN T. O'CONNORprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Philario PerfumeRetailGround, Floor 1
Project M01385278 Alteration · Permit Entire · 04/23/2026
Project M01385289 Alteration · LOC Issued · 04/23/2026
BreezmRetailFloor 8
Project M01006188 Alteration · LOC Issued · 02/23/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 366 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch8
09/06/2026M00014317-I1Request digital key ↗
08/27/2026M01006188-I1Request digital key ↗
08/25/2026M01167908-S1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed3
09/05/2026M00233186-I1Request digital key ↗
08/15/2026M00233186-P1Request digital key ↗
08/15/2026M00233186-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold3
09/05/2026M00233186-I1Request digital key ↗
08/15/2026M00233186-P1Request digital key ↗
08/15/2026M00233186-P2Request digital key ↗
▸Applications & Permits68
▸BISPLAN / WORK APPROVAL APPLICATION39
01/06/2023123478977Open ↗
12/12/2022123478977Open ↗
12/09/2022123478977Open ↗
Showing 3 of 39 on file for this type
▸BISWORK PERMIT APPLICATION29
10/21/2020123478977Open ↗
10/21/2020123478977Open ↗
10/19/2020123478977Open ↗
Showing 3 of 29 on file for this type
▸Seals & Professional Certifications69
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION34
03/05/2020123741772Open ↗
03/05/2020123741772Open ↗
01/02/2020123727930Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/06/2026M00014317-I1Open ↗
09/05/2026M00233186-P2Open ↗
09/05/2026M00233186-P1Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
01/02/2020123727930Open ↗
11/07/2019123741772Open ↗
10/03/2015122534980Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
01/02/2020123727930Open ↗
11/07/2019123741772Open ↗
10/03/2015122534980Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
10/19/2026M00233186-I1Open ↗
09/01/2026M01385625-I1Open ↗
09/01/2026M01385625-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Trade Schedules & Equipment30
▸BISSELF-CERT PLUMBING NOTICE9
12/21/2015122534980Open ↗
12/09/2014122177900Open ↗
Showing 2 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING7
12/12/2022123478977Open ↗
09/14/2020123478977Open ↗
08/25/2020123478977Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE6
01/29/2020123478977Open ↗
07/30/2018123478977Open ↗
11/16/2015122534980Open ↗
Showing 3 of 6 on file for this type
▸BISEQUIPMENT USE PERMITS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA3
12/07/2022123463215Open ↗
02/24/2023123478977Open ↗
Showing 2 of 3 on file for this type
▸BISSPRINKLER SYSTEMS1
02/24/2023123478977Open ↗
▸BISEQUIPMENT USE APPLICATION-PERMIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection8
▸DOB NOWHPD-1: Anti-Harassment Area Checklist3
08/13/2026M00233186-I1Open ↗
08/13/2026M00233186-P1Open ↗
08/13/2026M00233186-P2Open ↗
▸DOB NOWTenant Protection Plan3
08/13/2026M00233186-I1Open ↗
08/13/2026M00233186-P2Open ↗
08/13/2026M00233186-P1Open ↗
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCertificate of No Harassment1
08/13/2026M01167908-I1Open ↗
▸Environmental & Asbestos26
▸BISASBESTOS: CERTIFICATION (DEP ACP5)11
01/02/2020123727930Open ↗
11/07/2019123741772Open ↗
10/16/2018123478977Open ↗
Showing 3 of 11 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/06/2026M00014317-I1Open ↗
08/27/2026M01006188-I1Open ↗
08/25/2026M01167908-S1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance33
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS20
03/05/2020123741772Open ↗
03/05/2020123741772Open ↗
01/02/2020123727930Open ↗
Showing 3 of 20 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
06/03/2020123727930Open ↗
03/05/2020123741772Open ↗
10/20/2017122890862Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
06/03/2020123727930Open ↗
06/03/2020123727930Open ↗
▸BISINTERIOR LIGHTING POWER1
02/24/2023123478977Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/24/2023123478977Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
02/24/2023123478977Open ↗
▸Inspections & Test Reports15
▸BISTECHNICAL REPORT: RESPONSIBILITY11
04/25/2023123478977Open ↗
04/25/2023123478977Open ↗
04/25/2023123478977Open ↗
Showing 3 of 11 on file for this type
▸BISPOST-INSTALLED ANCHORS1
02/24/2023123478977Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
02/24/2023123478977Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
02/24/2023123478977Open ↗
▸BISDEP Hydrant Flow Test Letter1
07/08/2020123478977Open ↗
▸Approvals, Objections & Sign-offs24
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST14
04/25/2023123478977Open ↗
12/09/2022123463215Open ↗
06/03/2020123727930Open ↗
Showing 3 of 14 on file for this type
▸BISADMINISTRATIVE OBJECTIONS7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
07/08/2020123478977Open ↗
04/04/2016122466367Open ↗
▸BISFINAL1
02/24/2023123478977Open ↗
▸Cost, Insurance & Ownership38
▸BISCOST AFFIDAVIT36
04/25/2023123478977Open ↗
01/09/2023123478977Open ↗
12/30/2022123478977Open ↗
Showing 3 of 36 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
02/24/2023123478977Open ↗
12/09/2022123463215Open ↗
▸Filing & Intake Forms39
▸BISEFILING COVER SHEET18
01/02/2020123727930Open ↗
11/07/2019123741772Open ↗
07/30/2018123478977Open ↗
Showing 3 of 18 on file for this type
▸BISADDITIONAL INFORMATION17
02/24/2023123478977Open ↗
01/09/2023123478977Open ↗
03/30/2021123478977Open ↗
Showing 3 of 17 on file for this type
▸BISBOROUGH INTAKE FORM4
03/05/2020123741772Open ↗
01/29/2020123478977Open ↗
12/12/2019140876283Open ↗
Showing 3 of 4 on file for this type
▸Other Documents2
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type