← Back
BuildNYC
Two family frame
526 DRUMGOOLE ROAD EAST
STATEN ISLAND · BIN 5077233
💬 Discuss this project
2020Year Built
2Stories
B2Building Class
R3AZoning
2,958 sfGross Floor Area
2Units
Two family frame · 4,950 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 21p · 1 filing · 15 docs
Floor 13p · 2 filings · 17 docs
Cellar1p · 1 filing · 15 docs
Sub-Basement1p · 1 filing · 15 docs
Site & exterior1p · 1 filing · 1 doc
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NC 526203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Anselmo S. Genovese Architect309/30/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Fatima Falconetti Expeditor303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Fine MechanicalPlumbing407/08/2026
Perciballi IndustriesScaffold203/21/2026
Brooklyn Block HoldingGeneral Contractor107/08/2026
Perciballi IndustriesGeneral Contractor106/11/2019
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A Tech Engineering NYC, P6738209/30/2021
Building Lifecycle
01/05/2022
Signed off — Alteration
INSTALLATION OF NEW 18'-0" CURB CUT
S00297796-I1
01/04/2022
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
12/28/2021
Permit issued — Curb Cut
S00297796-I1-CC
12/13/2021
Objection raised — Zoning
12/13/2021
Objection resolved — Addressed
27 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offBrooklyn Block Holding12/28/2021
DOB NOWPlumbingSigned-offFine Mechanical09/23/2020
DOB NOWConstruction FenceSigned-offPerciballi Industries05/30/2019
BIS—ISSUEDBrooklyn Block Holding06/29/2021
BIS—ISSUEDBrooklyn Block Holding07/02/2020
BIS—ISSUEDPerciballi Industries06/11/2019
2 projects · most recent 09/20/2020
General Wiring
FiledStatusContractorScope
09/20/2020CompleteA. J. Caruso Electrical IGeneral Wiring
10/15/2019CompleteRidge Electric—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
01/04/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
09/01/2021Fire-Resistant Penetrations and Jointsanthony santorospecial
09/01/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
09/01/2021Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilitiesanthony santorospecial
09/01/2021Subsurface Investigations (Borings/Test Pits)anthony santorospecial
09/01/2021HVAC and service water heating equipment anthony santoroenergy_progress
09/01/2021Electrical energy consumptionanthony santoroenergy_progress
09/01/2021Maintenance informationanthony santoroenergy_progress
09/01/2021HVAC and service water heating system controls anthony santoroenergy_progress
09/01/2021HVAC insulation and sealing anthony santoroenergy_progress
47 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account