← Back
BuildNYC
Walk-up cooperative
526 WEST 158TH STREET
MANHATTAN · BIN 1062733
💬 Discuss this project
1925Year Built
6Stories
C6Building Class
R7-2Zoning
21,270 sfGross Floor Area
30Units
Rent Stabilized63 Active Violations 3 likely answered ▸
Walk-up cooperative · Owner of record: 526 West 158th Street Housing · 4,996 sf lot · 4.26 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 61 filing · 3 docs
Floor 55th floor apartment renovation12p · 1 filing · 16 docs
Floor 45th floor apartment renovation3p · 1 filing · 16 docs
Floor 35th floor apartment renovation3p · 1 filing · 16 docs
Floor 25th floor apartment renovation3p · 1 filing · 16 docs
Floor 1Install new mail boxes in building lobby9p · 4 filings · 20 docs
Cellar5th floor apartment renovation3p · 1 filing · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Edwards Sisters Realty304/09/2026
526 W 158th St Owners Associates203/21/2026
526 West 158th Street Housing103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ivan Shcherbakov310/29/2025
Organisation Architecture109/15/2025
J&R Design and Inspection101/20/2022
Enthink Engineers101/11/2022
Limen Design108/09/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Project Factory NYC303/21/2026
High Quality 338203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Reliable EnterprisesScaffold303/21/2026
Complex DevelopmentGeneral Contractor106/28/2026
High Quality ConstructionGeneral Contractor107/08/2026
RMZ ContractingGeneral Contractor104/09/2026
Signore & Sons PlumbingPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AG Engineering8899310/29/2025
Macia Inspection & Testin402109/15/2025
AR-Tech Engineering6659101/20/2022
J&R Design and Inspection6637101/20/2022
Building Lifecycle
All (109)Filed (7)Permit Issued (5)Signed Off (2)Violation (60)Objection (22)Special Inspection (13)
01/13/2026
Signed off — Alteration
INSTALL NEW MAIL BOXES IN BUILDING LOBBY. REMOVE OLD MAILBOXES AND PERFORM ANY ASSOCIATED REPAIR WORK ONCE THE NEW MAILBOX INSTALLATION IS COMPLETE. NO CHANGE USE, EGRESS, OR OCCUPANCY. FILED IN RESPONSE TO OATH/ECB VIOLATION # 39157439P.
M01285412-I1
12/15/2025
Permit issued — General Construction
M01285412-I1-GC
10/31/2025
Objection resolved — Addressed
10/29/2025
Filed — Alteration
EXISTING CO-OP APARTMENT INTERIOR/EXTERIOR RENOVATION
M01221582-P1
10/16/2025
Objection raised — Scope
09/30/2025
Violation issued (HPD, closed)
A
09/30/2025
Violation issued (HPD, closed)
C
09/30/2025
Violation issued (HPD, open)
B
09/29/2025
Special inspection requirement — Tenant Protection Plan Compliance
ARIEL GOLSHAN
09/15/2025
Filed — Alteration
INSTALL NEW MAIL BOXES IN BUILDING LOBBY. REMOVE OLD MAILBOXES AND PERFORM ANY ASSOCIATED REPAIR WORK ONCE THE NEW MAILBOX INSTALLATION IS COMPLETE. NO CHANGE USE, EGRESS, OR OCCUPANCY. FILED IN RESPONSE TO OATH/ECB VIOLATION # 39157439P.
M01285412-I1
09/12/2025
Special inspection requirement — Tenant Protection Plan Compliance
CHUNG CHING JEN
09/10/2025
Special inspection requirement — Final
Damiano Geraci
09/10/2025
Special inspection requirement — Fire-Resistance Rated Construction
Damiano Geraci
08/18/2025
Violation issued (ECB, closed)
Construction
07/07/2025
Permit issued — Plumbing
M01221582-S1-PL
07/05/2025
Violation issued (HPD, closed)
C
07/02/2025
Violation issued (HPD, closed)
C
06/30/2025
Permit issued — General Construction
M01221582-I1-GC
06/14/2025
Violation issued (HPD, closed)
C
06/14/2025
Violation issued (HPD, closed)
C
05/28/2025
Objection raised — Scope
05/28/2025
Objection resolved — Addressed
05/25/2025
Violation issued (HPD, closed)
C
05/25/2025
Violation issued (HPD, closed)
C
05/25/2025
Violation issued (HPD, closed)
B
05/25/2025
Violation issued (HPD, closed)
B
05/13/2025
Filed — Alteration
EXISTING CO-OP APARTMENT INTERIOR/EXTERIOR RENOVATION
M01221582-S1
05/13/2025
Filed — Alteration
EXISTING CO-OP APARTMENT INTERIOR/EXTERIOR RENOVATION
M01221582-I1
05/06/2025
Special inspection requirement — Lighting controls
ARIEL GOLSHAN
05/06/2025
Special inspection requirement — Tenant Protection Plan Compliance
ARIEL GOLSHAN
05/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ARIEL GOLSHAN
05/06/2025
Special inspection requirement — Energy Code Compliance Inspections
ARIEL GOLSHAN
05/06/2025
Special inspection requirement — Fenestration air leakage
ARIEL GOLSHAN
06/13/2024
Violation issued (HPD, closed)
C
06/13/2024
Violation issued (HPD, open)
A
06/13/2024
Violation issued (HPD, closed)
B
06/13/2024
Violation issued (HPD, closed)
A
06/13/2024
Violation issued (HPD, closed)
B
06/13/2024
Violation issued (HPD, closed)
A
06/13/2024
Violation issued (HPD, closed)
B
06/13/2024
Violation issued (HPD, closed)
A
04/02/2024
Violation issued (HPD, closed)
A
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/16/2023
Violation issued (HPD, closed)
A
06/22/2022
Signed off — Alteration
GENERAL RENOVATION OF 1ST FLOOR APARTMENT #4 WITH FOR NEW CEILING & PAINTING WORK AS PER PLAN. FILE TO REMOVE ECB VIOLATION #35409649X. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00664515-I1
06/19/2022
Violation issued (HPD, open)
C
03/09/2022
Permit issued — Sidewalk Shed
M00659822-I1-SH
02/22/2022
Permit issued — General Construction
M00664515-I1-GC
02/16/2022
Violation issued (HPD, closed)
A
02/09/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Robert Truskosky
02/09/2022
Special inspection requirement — Post-installed Anchors
ALBERTO ROMAN
01/22/2022
Objection raised — Other
01/22/2022
Objection resolved — Addressed
01/22/2022
Objection raised — Scope
01/22/2022
Objection resolved — Addressed
01/22/2022
Objection raised — Other
01/22/2022
Objection resolved — Addressed
01/22/2022
Objection raised — Other
Latest 60 of 109 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offRMZ Contracting12/15/2025
DOB NOWPlumbingPermit IssuedSignore & Sons Plumbing07/07/2025
DOB NOWGeneral ConstructionPermit IssuedComplex Development06/30/2025
DOB NOWSidewalk ShedPermit IssuedReliable Enterprises03/09/2022
DOB NOWGeneral ConstructionSigned-offHigh Quality Construction02/22/2022
BISOTISSUEDIzi Constuction04/09/1992
BISPLISSUEDIzi Constuction04/09/1992
BISFBISSUEDIzi Constuction02/18/1992
1 project · most recent 10/29/2025
Gas Water/Sanitary
FiledStatusContractorScope
10/29/2025Permit IssuedSignore & Sons PlumbingGas, Water/Sanitary
2 projects · most recent 08/18/2025
General Wiring
FiledStatusContractorScope
08/18/2025Permit IssuedPower Surge ElectricGeneral Wiring
03/07/2022Permit IssuedRichard Neu—
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
09/29/2025Tenant Protection Plan ComplianceARIEL GOLSHANspecial
09/12/2025Tenant Protection Plan ComplianceCHUNG CHING JENspecial
09/10/2025FinalDamiano Geraciprogress
09/10/2025Fire-Resistance Rated ConstructionDamiano Geraciprogress
05/06/2025Lighting controlsARIEL GOLSHANenergy_progress
05/06/2025Tenant Protection Plan ComplianceARIEL GOLSHANspecial
05/06/2025Fire-Resistant Penetrations and JointsARIEL GOLSHANspecial
05/06/2025Energy Code Compliance InspectionsARIEL GOLSHANprogress
05/06/2025Fenestration air leakageARIEL GOLSHANenergy_progress
02/09/2022Structural Stability – Alterations of existing buildingsRobert Truskoskyspecial
02/09/2022Post-installed AnchorsALBERTO ROMANspecial
01/18/2022Fire-Resistant Penetrations and JointsRobert Truskoskyspecial
01/18/2022FinalRobert Truskoskyprogress
▾Documents — 34 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
09/03/2026M00557776-I1Request digital key ↗
08/23/2026M01221582-P1Request digital key ↗
08/23/2026M01221582-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications17
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/03/2026M00659822-I1Open ↗
09/03/2026M00664515-I1Open ↗
08/23/2026M01221582-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/26/2026M01285412-I1Open ↗
08/26/2026M01285412-I1Open ↗
08/26/2026M01221582-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/26/2026M01285412-I1Open ↗
08/26/2026M01221582-I1Open ↗
08/25/2026M00664515-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/23/2026M01221582-I1Open ↗
08/23/2026M01221582-P1Open ↗
08/23/2026M01221582-S1Open ↗
Showing 3 of 6 on file for this type
▸Other Documents4
▸DOB NOWHPD4: CONH Pilot Program4
08/13/2026M01285412-I1Open ↗
08/13/2026M01221582-I1Open ↗
08/13/2026M01221582-P1Open ↗
Showing 3 of 4 on file for this type