← Back
School or academy
McClanahan House
5260 FIELDSTON ROAD · BIN 2100870
💬 Discuss this project
1934Year Built
2Stories
W3Building Class
R1-2Zoning
185,332 sfGross Floor Area
1Units
LL97 CoveredRent Stabilized7 Open Violations 3 unresolved · 4 paperwork only ▸FDNY Report ↗
School or academy · 494,475 sf lot · 0.37 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 3 docs
Floor 21p · 1 filing · 3 docs
Floor 11p · 1 filing · 3 docs
Sub-BasementUnder Construction5p · 2 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RIVERDALE COUNTRY SCHOOL907/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW YORK ENGINEERING ASSOC., P.C.210/10/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING ASSOCIATES P403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CC CONTROLLED PLBG CO.,INPlumbing207/08/2026
C C CONTROLLED COMBUSTIONGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851210/10/2023
Building Lifecycle
All (19)Filed (2)Permit Issued (3)Violation (8)Inspection (1)Special Inspection (5)
12/30/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/03/2025
Permit issued — Boiler Equipment
X00920517-I1-BE
10/17/2023
Permit issued — General Construction
X00920554-I1-GC
10/12/2023
Permit issued — Boiler Equipment
X00920517-I1-BE
10/10/2023
Filed — Alteration
INSTALL EXTERIOR STAINLESS STEEL STACK AND BREECHING IN BOILER ROOM
X00920554-I1
10/10/2023
Filed — Alteration
REFILING OF BOILER FILED UNDER 240211613 IN ORDER TO OBTAIN INSPECTIONS AND SIGNOFFS.
X00920517-I1
08/16/2023
Special inspection requirement — Heating Systems
LOUIS ARENA
08/16/2023
Special inspection requirement — Maintenance information
LOUIS ARENA
08/16/2023
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
08/16/2023
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
08/16/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
08/03/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/03/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/15/2022
Violation issued (ECB, open)
Boilers
12/01/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/02/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/02/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/02/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentPermit IssuedCC CONTROLLED PLBG CO.,IN12/03/2025
DOB NOWGeneral ConstructionPermit IssuedC C CONTROLLED COMBUSTION10/17/2023
DOB NOWBoiler EquipmentPermit IssuedCC CONTROLLED PLBG CO.,IN10/12/2023
BISPLISSUEDCC CONTROLLED PLBG CO INC10/23/2019
BISBLISSUEDCC CONTROLLED PLBG CO INC01/17/2018
BISPLISSUEDCC CONTROLLED PLBG CO INC01/17/2018
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
12/30/2025Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
08/16/2023Heating SystemsLOUIS ARENAspecial
08/16/2023Maintenance informationLOUIS ARENAenergy_progress
08/16/2023HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
08/16/2023HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
08/16/2023HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
▾Documents — 26 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/22/2026X00920517-I1Request digital key ↗
08/22/2026X00920554-I1Request digital key ↗
▸Applications & Permits3
▸BISWORK PERMIT APPLICATION2
01/16/2018240211613Open ↗
01/16/2018240211613Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
01/16/2018240211613Open ↗
▸Seals & Professional Certifications10
▸DOB NOWProgress Inspector Seal & Signature4
09/23/2026X00920517-I1Open ↗
09/23/2026X00920517-I1Open ↗
09/23/2026X00920517-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/22/2026X00920517-I1Open ↗
08/13/2026X00920554-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
01/16/2018240211613Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
01/16/2018240211613Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/16/2018240211613Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/23/2026X00920517-I1Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING1
01/16/2018240211613Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
01/16/2018240211613Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
01/16/2018240211613Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/22/2026X00920517-I1Open ↗
08/13/2026X00920554-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/16/2018240211613Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
01/16/2018240211613Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
01/16/2018240211613Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
01/16/2018240211613Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
01/16/2018240211613Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
01/16/2018240211613Open ↗