Multi-story retail building (2+)
527 WEST 19 STREET
MANHATTAN · Chelsea-Hudson Yards · BIN 1080293
💬 Discuss this project
1919Year Built
2Stories
K2Building Class
C6-2Zoning
13,800 sfGross Floor Area
1Units
0 Open Violations
Multi-story retail building (2+) · Owner of record: DAZW LLC · 9,200 sf lot · 1.5 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionLandscapeGeneral
Roof141p · 4 filings · 20 docs
Floor 2127p · 3 filings · 20 docs
Floor 1130p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DAVID ZWIRNER5007/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/01/2023$11.7M—— → —$851/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
THE GREEN STUDIO1003/21/2026
JAM CONSULTANTS, INC.3803/21/2026
MILLENNIUM DESIGNS1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SHAWMUT WOODWORKING & SUPPLYGeneral Contractor1407/08/2026
MC SUPERSTRUCTURE INCGeneral Contractor707/08/2026
KG SPRINKLER CORPFire Protection207/08/2026
DONATO PLUMBING, INCPlumbing207/08/2026
DENALI ELECTRIC CORPElectrical103/22/2026
NASH ELECTRIC SERVICES INElectrical103/22/2026
ADVANCED PLBG LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CROSSCHECK INSPECTION SER5441407/16/2025
LANGAN ENG, ENV, SURVEYIN1265101/30/2024
Building Lifecycle
All (135)Filed (30)Permit Issued (20)Signed Off (10)Violation (3)Inspection (11)Objection (31)Special Inspection (30)
05/05/2026
Signed off — Alteration CO
HEREWITH FILING FOR NEW OR REPLACEMENT, ALTERATION OR ADDITION OF COMPONENTS, CAP/REMOVAL, RELOCATION. AND MODIFICATION TO EXISTING SPRINKLER SYSTEM
M00943364-S2
05/03/2026
Signed off — Alteration CO
HEREWITH FILING FOR NEW OR REPLACEMENT, ALTERATION OR ADDITION OF COMPONENTS, CAP/REMOVAL, RELOCATION. AND MODIFICATION TO EXISTING SPRINKLER SYSTEM
M00943364-S1
12/01/2025
Signed off — Alteration
M00983314-I1
12/01/2025
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AND OVERHEAD PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00980146-I1
08/15/2025
Objection raised — Scope
08/11/2025
Objection resolved — Addressed
07/23/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
EUGENE BIFULCO
07/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
07/23/2025
Special inspection requirement — Sprinkler Systems
EUGENE BIFULCO
07/16/2025
Filed — Alteration CO
HEREWITH FILING FOR NEW OR REPLACEMENT, ALTERATION OR ADDITION OF COMPONENTS, CAP/REMOVAL, RELOCATION. AND MODIFICATION TO EXISTING SPRINKLER SYSTEM
M00943364-P8
07/15/2025
Objection raised — Admin
07/15/2025
Special inspection requirement — Sprinkler Systems
EUGENE BIFULCO
07/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
07/15/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
EUGENE BIFULCO
07/02/2025
Filed — Alteration CO
HEREWITH FILING FOR NEW OR REPLACEMENT, ALTERATION OR ADDITION OF COMPONENTS, CAP/REMOVAL, RELOCATION. AND MODIFICATION TO EXISTING SPRINKLER SYSTEM
M00943364-P7
07/01/2025
Special inspection requirement — Insulation placement and R values
EUGENE BIFULCO
07/01/2025
Special inspection requirement — Air barrier - visual inspection
EUGENE BIFULCO
07/01/2025
Special inspection requirement — Protection of exposed foundation insulation
EUGENE BIFULCO
07/01/2025
Special inspection requirement — Vestibules
EUGENE BIFULCO
07/01/2025
Special inspection requirement — Fenestration air leakage
EUGENE BIFULCO
07/01/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
EUGENE BIFULCO
07/01/2025
Special inspection requirement — Sprayed fire-resistant materials
EUGENE BIFULCO
07/01/2025
Special inspection requirement — Fenestration areas
EUGENE BIFULCO
07/01/2025
Special inspection requirement — Fire-Resistance Rated Construction
EUGENE BIFULCO
05/15/2025
Signed off — Alteration
M00994019-I1
05/15/2025
Signed off — Alteration CO
HEREWITH FILING FOR NEW OR REPLACEMENT, ALTERATION OR ADDITION OF COMPONENTS, CAP/REMOVAL, RELOCATION. AND MODIFICATION TO EXISTING SPRINKLER SYSTEM
M00943364-S3
05/07/2025
Signed off — Alteration
M01044410-I1
04/18/2025
Filed — Alteration CO
HEREWITH FILING FOR NEW OR REPLACEMENT, ALTERATION OR ADDITION OF COMPONENTS, CAP/REMOVAL, RELOCATION. AND MODIFICATION TO EXISTING SPRINKLER SYSTEM
M00943364-P6
04/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
04/17/2025
Special inspection requirement — Sprinkler Systems
EUGENE BIFULCO
04/17/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
EUGENE BIFULCO
04/11/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/09/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/09/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/01/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/01/2025
Objection resolved — Addressed
04/01/2025
Special inspection requirement — Mechanical Systems
EUGENE BIFULCO
04/01/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
04/01/2025
Special inspection requirement — Heating Systems
EUGENE BIFULCO
04/01/2025
Special inspection requirement — Final
EUGENE BIFULCO
04/01/2025
Special inspection requirement — HVAC-R and service water heating system controls
EUGENE BIFULCO
04/01/2025
Special inspection requirement — Electrical motors and elevators
EUGENE BIFULCO
04/01/2025
Special inspection requirement — Maintenance information
EUGENE BIFULCO
04/01/2025
Special inspection requirement — HVAC-R and service water heating equipment
EUGENE BIFULCO
04/01/2025
Special inspection requirement — Lighting controls
EUGENE BIFULCO
04/01/2025
Special inspection requirement — Interior lighting power
EUGENE BIFULCO
04/01/2025
Special inspection requirement — Exterior lighting power
EUGENE BIFULCO
04/01/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
EUGENE BIFULCO
03/25/2025
Permit issued — Structural
M00943364-S3-ST
03/25/2025
Permit issued — Foundation
M00994019-I1-FO
03/20/2025
Objection raised — Energy
03/19/2025
Filed — Alteration CO
HEREWITH FILING FOR NEW OR REPLACEMENT, ALTERATION OR ADDITION OF COMPONENTS, CAP/REMOVAL, RELOCATION. AND MODIFICATION TO EXISTING SPRINKLER SYSTEM
M00943364-P4
03/19/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/13/2025
Filed — No Work
M01134590-P4
03/12/2025
Filed — Alteration
M01044410-P3
03/07/2025
Filed — Alteration CO
HEREWITH FILING FOR NEW OR REPLACEMENT, ALTERATION OR ADDITION OF COMPONENTS, CAP/REMOVAL, RELOCATION. AND MODIFICATION TO EXISTING SPRINKLER SYSTEM
M00943364-P3
03/06/2025
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AND OVERHEAD PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00980146-P4
03/06/2025
Permit issued — Plumbing
M00943364-S2-EW-SP
03/06/2025
Permit issued — Plumbing
M00943364-S2-PL
03/03/2025
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
Latest 60 of 135 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offSHAWMUT WOODWORKING & SUPPLY03/25/2025
DOB NOWFoundationSigned-offSHAWMUT WOODWORKING & SUPPLY03/25/2025
DOB NOWPlumbingSigned-offH M SPRINKLER INC03/06/2025
DOB NOWPlumbingSigned-offDONATO PLUMBING, INC03/06/2025
DOB NOWMechanical SystemsSigned-offSHAWMUT WOODWORKING & SUPPLY02/21/2025
DOB NOWConstruction FenceSigned-offMC SUPERSTRUCTURE INC12/19/2024
DOB NOWSidewalk ShedSigned-offMC SUPERSTRUCTURE INC12/02/2024
DOB NOWGeneral ConstructionPermit IssuedSHAWMUT WOODWORKING & SUPPLY11/12/2024
DOB NOWSupported ScaffoldSigned-offMC SUPERSTRUCTURE INC07/10/2024
DOB NOWStructuralSigned-offSHAWMUT WOODWORKING & SUPPLY04/11/2024
DOB NOWSprinklersSigned-offDONATO PLUMBING, INC03/26/2024
DOB NOWPlumbingSigned-offH M SPRINKLER INC03/26/2024
DOB NOWGeneral ConstructionPermit IssuedSHAWMUT WOODWORKING & SUPPLY03/01/2024
DOB NOWStructuralSigned-offSHAWMUT WOODWORKING & SUPPLY02/27/2024
DOB NOWMechanical SystemsSigned-offSHAWMUT WOODWORKING & SUPPLY02/27/2024
DOB NOWFoundationSigned-offSHAWMUT WOODWORKING & SUPPLY02/20/2024
DOB NOWPlumbingSigned-offADVANCED PLBG LLC01/17/2024
DOB NOWConstruction FenceSigned-offMC SUPERSTRUCTURE INC01/05/2024
DOB NOWSidewalk ShedSigned-offMC SUPERSTRUCTURE INC12/29/2023
DOB NOWGeneral ConstructionSigned-offSHAWMUT WOODWORKING & SUPPLY12/07/2023
1 project · most recent 07/16/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/16/2025Signed-offSHAWMUT WOODWORKING & SUPHeating and Air Conditioning Systems
Heat / Cool
Trane TRANE DHJ240A3SBH 20 tons · Rooftop Unit ×2
TRANE YHJ090A3SBH 7 tons · Heat Pump Outdoor ×2
TRANE DHJ150A3SBH 12 tons · Rooftop Unit ×2
TRANE YHJ120A3SBH 10 tons · Heat Pump Outdoor ×2
1 project · most recent 07/16/2025
Sprinkler System
FiledStatusContractorScope
07/16/2025Signed-offKG SPRINKLER CORPSprinkler System
1 project · most recent 07/16/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/16/2025Signed-offDONATO PLUMBING, INCGas, Storm, Water/Sanitary
3 projects · most recent 02/28/2026
General Wiring
FiledStatusContractorScope
02/28/2026CompleteMER ELECTRIC, INCGeneral Wiring
06/21/2025CompleteDENALI ELECTRIC CORP—
01/08/2024CompleteNASH ELECTRIC SERVICES IN—
1 project · most recent 07/16/2025
Steel Concrete Masonry
FiledStatusContractorScope
07/16/2025Signed-offSHAWMUT WOODWORKING & SUPSteel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
04/11/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/09/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/09/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/01/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/19/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/03/2025Fail-Final PL - Up to 9 Requested FloorsFailView ↗
01/17/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/17/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/20/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/27/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/27/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 89
DateRequirementInspectorRole
07/23/2025Sprinkler SystemsEUGENE BIFULCOspecial
07/23/2025Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
07/23/2025HVAC-R and service water piping design and insulationEUGENE BIFULCOenergy_progress
07/15/2025Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
07/15/2025Sprinkler SystemsEUGENE BIFULCOspecial
07/15/2025HVAC-R and service water piping design and insulationEUGENE BIFULCOenergy_progress
07/01/2025Sprayed fire-resistant materialsEUGENE BIFULCOspecial
07/01/2025Fenestration and door U-factor and product ratingsEUGENE BIFULCOenergy_progress
07/01/2025Fenestration areasEUGENE BIFULCOenergy_progress
07/01/2025Insulation placement and R valuesEUGENE BIFULCOenergy_progress
07/01/2025VestibulesEUGENE BIFULCOenergy_progress
07/01/2025Air barrier - visual inspectionEUGENE BIFULCOenergy_progress
07/01/2025Fire-Resistance Rated ConstructionEUGENE BIFULCOprogress
07/01/2025Fenestration air leakageEUGENE BIFULCOenergy_progress
07/01/2025Protection of exposed foundation insulationEUGENE BIFULCOenergy_progress
04/17/2025HVAC-R and service water piping design and insulationEUGENE BIFULCOenergy_progress
04/17/2025Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
04/17/2025Sprinkler SystemsEUGENE BIFULCOspecial
04/01/2025HVAC-R and service water piping design and insulationEUGENE BIFULCOenergy_progress
04/01/2025FinalEUGENE BIFULCOprogress
04/01/2025Lighting controlsEUGENE BIFULCOenergy_progress
04/01/2025Interior lighting powerEUGENE BIFULCOenergy_progress
04/01/2025HVAC-R and service water heating equipmentEUGENE BIFULCOenergy_progress
04/01/2025Exterior lighting powerEUGENE BIFULCOenergy_progress
04/01/2025Electrical motors and elevatorsEUGENE BIFULCOenergy_progress
Latest 25 of 89.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
David Zwirner GalleryOther—
Project M01019957 Alteration · Filing Withdrawn · 03/20/2024
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 163 on file (BIS + DOB NOW)
▸Plans & Drawings31
▸DOB NOWPlans/Sketch28
08/29/2026M00931245-I1Request digital key ↗
08/29/2026M00931245-S1Request digital key ↗
08/28/2026M00943364-S4Request digital key ↗
Showing 3 of 28 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly3
08/24/2026M01134590-I1Request digital key ↗
08/24/2026M01134590-P1Request digital key ↗
08/24/2026M01134590-P4Request digital key ↗
▸Applications & Permits6
▸DOB NOWHPD Certification Letter or CPC Special Permit4
08/13/2026M00943364-P1Open ↗
08/13/2026M00943364-P2Open ↗
08/13/2026M00943364-P7Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
03/13/2024141025432Open ↗
03/13/2024141025432Open ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026M00943364-I1Open ↗
08/13/2026M00943364-P1Open ↗
08/13/2026M00943364-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026M00943364-I1Open ↗
▸Seals & Professional Certifications65
▸DOB NOWDPL-1: Design Professional Seal & Signature31
08/29/2026M00931245-S1Open ↗
08/29/2026M00931245-I1Open ↗
08/28/2026M00983314-I1Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWProgress Inspector Seal & Signature22
09/29/2026M00943364-P8Open ↗
09/19/2026M00943364-P2Open ↗
09/19/2026M00943364-P2Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/29/2026M00943364-P8Open ↗
09/19/2026M00943364-P2Open ↗
09/19/2026M00943364-P6Open ↗
Showing 3 of 12 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist4
08/13/2026M00943364-P1Open ↗
08/13/2026M00943364-P7Open ↗
08/13/2026M00943364-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos25
▸DOB NOWOER: Notice to Proceed11
08/13/2026M00994019-I1Open ↗
08/13/2026M01023624-I1Open ↗
08/13/2026M01019957-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWOER: Notice of Satisfaction6
08/13/2026M00994019-I1Open ↗
08/13/2026M01023624-I1Open ↗
08/13/2026M00931245-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/13/2026M01023624-I1Open ↗
08/13/2026M00943364-S1Open ↗
08/13/2026M00943364-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/29/2026M00931245-I1Open ↗
08/29/2026M00931245-S1Open ↗
08/28/2026M00994019-I1Open ↗
▸Inspections & Test Reports7
▸DOB NOWSOIL REPORT2
08/13/2026M00994019-I1Open ↗
08/13/2026M00943364-S4Open ↗
▸DOB NOWConcrete Testing Exception Report2
08/13/2026M00994019-I1Open ↗
08/13/2026M00943364-S3Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026M00994019-I1Open ↗
08/13/2026M00943364-S4Open ↗
▸DOB NOWTR5 Test Report1
08/13/2026M00994019-I1Open ↗
▸Other Documents20
▸DOB NOWPlot Diagram5
08/13/2026M00943364-P2Open ↗
08/13/2026M00943364-P1Open ↗
08/13/2026M00943364-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSite Survey: Initial4
08/13/2026M00943364-P7Open ↗
08/13/2026M00943364-I1Open ↗
08/13/2026M00943364-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026M00943364-I1Open ↗
08/13/2026M00943364-P1Open ↗
08/13/2026M00943364-P7Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/13/2026M00943364-I1Open ↗
08/13/2026M00943364-P2Open ↗
08/13/2026M00943364-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification1
08/13/2026M01019957-I1Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026M00943364-S3Open ↗
▸DOB NOWFinal Survey1
08/13/2026M00943364-I1Open ↗