← Back
General warehouse
528 TIFFANY STREET
BRONX · Hunts Point · BIN 2006788
💬 Discuss this project
1931Year Built
2Stories
E1Building Class
M1-2Zoning
3,238 sfGross Floor Area
1Units
0 Open Violations
General warehouse · Owner of record: 528 TIFFANY STREET LLC · 2,500 sf lot · 1.3 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Roof27p · 3 filings · 20 docs
Floor 114p · 3 filings · 20 docs
Mezzanine10p · 2 filings · 20 docs
Site & exterior4p · 2 filings · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GALAXY GEN CONTRACTING2907/08/2026
PROFESSIONAL LINE CORP503/22/2026
528 TIFFANY STREET303/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/28/2019$760K—INDUSTRIAL DIAMOND LABORATORIES, INC. → 528 TIFFANY STREET LLC$235/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GEORGIOS G GEORGOPOULOS, R.A.812/27/2023
ENTHINK ENGINEERS LLC106/23/2022
CRICKET ARCHITECTS NJ LLC106/07/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GALAXY GENERAL CONTRACTINGeneral Contractor307/08/2026
PROFESSIONAL LINE CORPGeneral Contractor303/21/2026
AJC PLUMBING & HTG CORPPlumbing207/08/2026
ARIANA CONTRACTING INCPlumbing107/08/2026
COPPER SERVICES, LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GEORGIOS G. GEORGOPOULOS,1192812/27/2023
H2 CONSULTING PE PC835410/25/2023
Building Lifecycle
All (70)Filed (10)Permit Issued (8)Signed Off (5)Violation (4)Inspection (4)Objection (10)Special Inspection (29)
01/02/2024
Signed off — Alteration
APPLICATION FILED TO INSTALL 2-NEW GAS UNIT HEATERS, 1-NEW ELECTRICAL BASEBOARD HEATER, 1-NEW TOILET EXHUAST FAN, TWO ROOF EXHAUST FANS AND 1-NEW DUCTLESS MINI SPLIT UNIT SYSTEM IN CONJUCNTION WITH DOB BIS JOB #220708991.
X00375228-I1
01/02/2024
Special inspection requirement — Duct leakage testing
Georgios Georgopoulos
01/02/2024
Special inspection requirement — HVAC and service water heating equipment
Georgios Georgopoulos
01/02/2024
Special inspection requirement — Maintenance information
Georgios Georgopoulos
01/02/2024
Special inspection requirement — Final
Georgios Georgopoulos
01/02/2024
Special inspection requirement — Energy Code Compliance Inspections
Georgios Georgopoulos
01/02/2024
Special inspection requirement — Mechanical Systems
Georgios Georgopoulos
01/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Georgios Georgopoulos
01/02/2024
Special inspection requirement — Heating Systems
Georgios Georgopoulos
01/02/2024
Special inspection requirement — Chimneys and vents
Georgios Georgopoulos
12/27/2023
Filed — Alteration
APPLICATION FILED TO INSTALL 2-NEW GAS UNIT HEATERS, 1-NEW ELECTRICAL BASEBOARD HEATER, 1-NEW TOILET EXHUAST FAN, TWO ROOF EXHAUST FANS AND 1-NEW DUCTLESS MINI SPLIT UNIT SYSTEM IN CONJUCNTION WITH DOB BIS JOB #220708991.
X00375228-P2
12/21/2023
Signed off — Alteration
STRUCTURAL APPLICATION FILED IN CONJUNCTION WITH BIS JOB #220708991, TO REMOVE EXISTING 2ND FLOOR & 1-STORY REAR ROOF. PROVIDE NEW ELEVATED ROOF STRUCTURE AT REAR, NEW STEEL BEAMS, STEEL COLUMNS, CMU WALLS, MEZZANINE, LANDING AREA, & NEW FACADE.
X00502500-I1
11/14/2023
Filed — Alteration
APPLICATION FILED TO INSTALL 2-NEW GAS UNIT HEATERS, 1-NEW ELECTRICAL BASEBOARD HEATER, 1-NEW TOILET EXHUAST FAN, TWO ROOF EXHAUST FANS AND 1-NEW DUCTLESS MINI SPLIT UNIT SYSTEM IN CONJUCNTION WITH DOB BIS JOB #220708991.
X00375228-P1
11/09/2023
Signed off — Alteration
APPLICATION FILED TO REMOVE EXISTING PLUMBING FIXTURES AND INSTALL NEW PLUMBING FIXTURES, FLOOR DRAIN, TRENCH DRAIN AND NEW ROOF DRAIN IN CONJUNCTION WITH BIS JOB # 220708991.
X00375219-I1
10/30/2023
Permit issued — Structural
X00502500-I1-ST
10/27/2023
Special inspection requirement — Post-installed Anchors
Harry Hong
10/27/2023
Special inspection requirement — Structural Steel - Details
Harry Hong
10/27/2023
Special inspection requirement — Structural Steel - Welding
Harry Hong
10/27/2023
Special inspection requirement — Concrete - Cast-In-Place
Georgios Georgopoulos
10/27/2023
Special inspection requirement — Structural Steel - High Strength Bolting
Harry Hong
10/27/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Harry Hong
10/27/2023
Special inspection requirement — Masonry
Georgios Georgopoulos
10/27/2023
Special inspection requirement — Final
Georgios Georgopoulos
10/27/2023
Special inspection requirement — Structural Wood Frame
Georgios Georgopoulos
10/25/2023
Filed — Alteration
STRUCTURAL APPLICATION FILED IN CONJUNCTION WITH BIS JOB #220708991, TO REMOVE EXISTING 2ND FLOOR & 1-STORY REAR ROOF. PROVIDE NEW ELEVATED ROOF STRUCTURE AT REAR, NEW STEEL BEAMS, STEEL COLUMNS, CMU WALLS, MEZZANINE, LANDING AREA, & NEW FACADE.
X00502500-P1
10/24/2023
Special inspection requirement — Masonry
Georgios Georgopoulos
10/24/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Harry Hong
10/24/2023
Special inspection requirement — Post-installed Anchors
Harry Hong
10/24/2023
Special inspection requirement — Concrete - Cast-In-Place
Georgios Georgopoulos
10/24/2023
Special inspection requirement — Structural Wood Frame
Georgios Georgopoulos
10/24/2023
Special inspection requirement — Final
Georgios Georgopoulos
10/24/2023
Special inspection requirement — Structural Steel - Welding
Harry Hong
10/24/2023
Special inspection requirement — Structural Steel - High Strength Bolting
Harry Hong
10/24/2023
Special inspection requirement — Structural Steel - Details
Harry Hong
10/12/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/11/2023
Objection resolved — Addressed
10/05/2023
Objection raised — C/O of existing property requi
10/04/2023
Filed — Alteration
APPLICATION FILED TO REMOVE EXISTING PLUMBING FIXTURES AND INSTALL NEW PLUMBING FIXTURES, FLOOR DRAIN, TRENCH DRAIN AND NEW ROOF DRAIN IN CONJUNCTION WITH BIS JOB # 220708991.
X00375219-P2
10/03/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Georgios Georgopoulos
09/22/2023
Signed off — Alteration
X00762957-I1
09/22/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/05/2023
Filed — Alteration
APPLICATION FILED TO REMOVE EXISTING PLUMBING FIXTURES AND INSTALL NEW PLUMBING FIXTURES, FLOOR DRAIN, TRENCH DRAIN AND NEW ROOF DRAIN IN CONJUNCTION WITH BIS JOB # 220708991.
X00375219-P1
09/05/2023
Permit issued — Mechanical Systems
X00375228-I1-MS
08/31/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Georgios Georgopoulos
08/11/2023
Permit issued — Plumbing
X00375219-I1-PL
05/09/2023
Signed off — Alteration
CONSTRUCTION FENCE
X00752513-I1
04/18/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/18/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/27/2022
Permit issued — Plumbing
X00375219-I1-PL
06/23/2022
Filed — Alteration
X00762957-I1
06/23/2022
Permit issued — Sidewalk Shed
X00762957-I1-SH
06/13/2022
Permit issued — Plumbing
X00375219-I1-PL
06/08/2022
Permit issued — Construction Fence
X00752513-I1-FN
06/07/2022
Filed — Alteration
CONSTRUCTION FENCE
X00752513-I1
02/25/2022
Permit issued — Plumbing
X00375219-I1-PL
05/26/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/13/2021
Filed — Alteration
STRUCTURAL APPLICATION FILED IN CONJUNCTION WITH BIS JOB #220708991, TO REMOVE EXISTING 2ND FLOOR & 1-STORY REAR ROOF. PROVIDE NEW ELEVATED ROOF STRUCTURE AT REAR, NEW STEEL BEAMS, STEEL COLUMNS, CMU WALLS, MEZZANINE, LANDING AREA, & NEW FACADE.
X00502500-I1
03/05/2021
Violation issued (ECB, closed)
Construction
03/05/2021
Violation issued (ECB, closed)
Unknown
03/05/2021
Violation issued (ECB, closed)
Unknown
Latest 60 of 70 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offGALAXY GENERAL CONTRACTIN10/30/2023
DOB NOWMechanical SystemsSigned-offGALAXY GENERAL CONTRACTIN09/05/2023
DOB NOWPlumbingSigned-offAJC PLUMBING & HTG CORP08/11/2023
DOB NOWPlumbingSigned-offAJC PLUMBING & HTG CORP07/27/2022
DOB NOWSidewalk ShedSigned-offPROFESSIONAL LINE CORP06/23/2022
DOB NOWPlumbingSigned-offARIANA CONTRACTING INC06/13/2022
DOB NOWConstruction FenceSigned-offGALAXY GENERAL CONTRACTIN06/08/2022
DOB NOWPlumbingSigned-offCOPPER SERVICES, LLC02/25/2022
BIS—ISSUEDGALAXY GENERAL CONTRACTIN04/11/2022
BIS—ISSUEDGALAXY GENERAL CONTRACTIN02/26/2021
4 projects · most recent 12/17/2024
General Wiring
FiledStatusContractorScope
12/17/2024Permit IssuedLIMONGELLI ELECTRIC CORPGeneral Wiring
10/23/2023CompleteIZZO ELECTRIC INC.General Wiring
06/23/2022CompleteRICHARD NEU—
03/30/2021CancelledIZZO ELECTRIC INC.General Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/12/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/22/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/18/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/18/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
01/02/2024Duct leakage testing Georgios Georgopoulosenergy_progress
01/02/2024HVAC and service water heating equipment Georgios Georgopoulosenergy_progress
01/02/2024Maintenance informationGeorgios Georgopoulosenergy_progress
01/02/2024FinalGeorgios Georgopoulosprogress
01/02/2024Energy Code Compliance InspectionsGeorgios Georgopoulosprogress
01/02/2024Mechanical SystemsGeorgios Georgopoulosspecial
01/02/2024Fire-Resistant Penetrations and JointsGeorgios Georgopoulosspecial
01/02/2024Heating SystemsGeorgios Georgopoulosspecial
01/02/2024Chimneys and ventsGeorgios Georgopoulosspecial
10/27/2023Post-installed AnchorsHarry Hongspecial
10/27/2023Structural Steel - DetailsHarry Hongspecial
10/27/2023Structural Steel - WeldingHarry Hongspecial
10/27/2023Concrete - Cast-In-PlaceGeorgios Georgopoulosspecial
10/27/2023Structural Steel - High Strength BoltingHarry Hongspecial
10/27/2023Structural Stability – Alterations of existing buildingsHarry Hongspecial
10/27/2023MasonryGeorgios Georgopoulosspecial
10/27/2023FinalGeorgios Georgopoulosprogress
10/27/2023Structural Wood FrameGeorgios Georgopoulosprogress
10/24/2023MasonryGeorgios Georgopoulosspecial
10/24/2023Structural Stability – Alterations of existing buildingsHarry Hongspecial
10/24/2023Post-installed AnchorsHarry Hongspecial
10/24/2023Concrete - Cast-In-PlaceGeorgios Georgopoulosspecial
10/24/2023Structural Wood FrameGeorgios Georgopoulosprogress
10/24/2023FinalGeorgios Georgopoulosprogress
10/24/2023Structural Steel - WeldingHarry Hongspecial
Latest 25 of 29.
▾Documents — 127 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch4
08/24/2026X00752513-I1Request digital key ↗
08/24/2026X00762957-I1Request digital key ↗
08/22/2026X00502500-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
08/25/2026X00375228-P2Request digital key ↗
08/25/2026X00375228-P1Request digital key ↗
08/14/2026X00375228-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing3
08/22/2026X00375219-I1Request digital key ↗
08/22/2026X00375219-P1Request digital key ↗
08/14/2026X00375219-P2Request digital key ↗
▸Applications & Permits9
▸BISPLAN / WORK APPROVAL APPLICATION5
01/18/2024220708991Open ↗
12/14/2023220708991Open ↗
11/09/2023220708991Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION2
03/01/2021220708991Open ↗
02/19/2021220708991Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
06/09/2020220708991Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
12/04/2023220708991Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISZONING DIAGRAM2
01/27/2021220708991Open ↗
12/21/2020220708991Open ↗
▸BISVERIFY TAX LOT1
02/01/2024220708991Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
02/01/2024220708991Open ↗
▸Seals & Professional Certifications39
▸DOB NOWSpecial Inspector Seal & Signature20
08/29/2026X00502500-I1Open ↗
08/29/2026X00502500-I1Open ↗
08/29/2026X00502500-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/24/2026X00752513-I1Open ↗
08/24/2026X00762957-I1Open ↗
08/22/2026X00375219-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
08/29/2026X00502500-I1Open ↗
08/29/2026X00502500-I1Open ↗
08/23/2026X00375228-I1Open ↗
Showing 3 of 9 on file for this type
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST2
12/21/2020220708991Open ↗
06/09/2020220708991Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/22/2026X00375219-I1Open ↗
08/22/2026X00375219-P1Open ↗
08/14/2026X00375219-P2Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/09/2020220708991Open ↗
▸Energy Compliance18
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
12/20/2023220708991Open ↗
12/20/2023220708991Open ↗
02/25/2021220708991Open ↗
Showing 3 of 7 on file for this type
▸BISAIR SEALING AND INSULATION - VISUAL1
12/20/2023220708991Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
12/20/2023220708991Open ↗
▸BISINTERIOR LIGHTING POWER1
12/20/2023220708991Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/16/2024220708991Open ↗
▸BISEXTERIOR LIGHTING POWER1
12/20/2023220708991Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
12/20/2023220708991Open ↗
▸BISFENESTRATION AREAS1
12/20/2023220708991Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
12/20/2023220708991Open ↗
▸BISLIGHTING CONTROLS1
12/20/2023220708991Open ↗
▸BISFENESTRATION AIR LEAKAGE1
12/20/2023220708991Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00375228-I1Open ↗
▸Inspections & Test Reports18
▸BISTECHNICAL REPORT: RESPONSIBILITY12
12/21/2023220708991Open ↗
12/20/2023220708991Open ↗
12/20/2023220708991Open ↗
Showing 3 of 12 on file for this type
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
12/21/2023220708991Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
12/20/2023220708991Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
12/20/2023220708991Open ↗
▸BISMASONRY1
12/20/2023220708991Open ↗
▸BISFRAME (2008)/STRUCTURAL WOOD FRAME (2014) INSPECTION1
12/20/2023220708991Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
12/21/2023220708991Open ↗
▸Approvals, Objections & Sign-offs3
▸BISSCHEDULE A - OCCUPANCY / USE3
12/14/2023220708991Open ↗
12/02/2020220708991Open ↗
06/09/2020220708991Open ↗
▸Cost, Insurance & Ownership8
▸BISPROJECT-SPECIFIC GL INSURANCE3
02/22/2021220708991Open ↗
02/19/2021220708991Open ↗
02/11/2021220708991Open ↗
▸BISDEPT OF FINANCE VERIFICATION2
12/21/2020220708991Open ↗
12/21/2020220708991Open ↗
▸BISCOST AFFIDAVIT2
12/21/2020220708991Open ↗
06/09/2020220708991Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
12/14/2023220708991Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION3
01/18/2024220708991Open ↗
12/04/2023220708991Open ↗
02/18/2021220708991Open ↗
▸BISEFILING COVER SHEET1
06/05/2020220708991Open ↗
▸Other Documents3
▸BISVESTIBULES1
01/19/2024220708991Open ↗
▸BISSTRUCTURAL COLD-FORMED STEEL1
01/19/2024220708991Open ↗
▸BISPLOT DIAGRAM1
06/09/2020220708991Open ↗