← Back
Five to six families
529 MCDONALD AVENUE
BROOKLYN · Kensington · BIN 3125279
💬 Discuss this project
1930Year Built
3Stories
C2Building Class
R5Zoning
4,929 sfGross Floor Area
6Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Five to six families · 2,958 sf lot · 1.67 FAR built · Flood zone X
Locations of Work
Architecture
Roof5p · 1 filing · 7 docs
Floor 11p · 1 filing · 9 docs
Cellar2p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EXCLUSIVE CONSTRUCTION NY507/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AK CONSULTING SERVICES, INC101/04/2023
ASKON ARCHITECTS, P.C.210/14/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AK CONSULTING SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EXCLUSIVE CONSTRUCTIONGeneral Contractor507/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AK CONSULTING SERVICES, I6198101/04/2023
ASKON ARCHITECT, P.C.3596210/14/2022
Building Lifecycle
All (33)Filed (3)Permit Issued (3)Signed Off (2)Violation (7)Objection (2)Special Inspection (16)
12/10/2025
Violation issued (ECB, closed)
Construction
10/15/2024
Violation issued (ECB, closed)
Construction
09/04/2024
Signed off — Alteration
FRONT FACADE PARAPET RESTORATION WORK AS PER INDICATED IN THE PLAN. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B00807136-I1
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/24/2023
Permit issued — General Construction
B00807136-I1-GC
02/02/2023
Signed off — Alteration
CONVERT PART OF DWELLING UNIT ON THE FIRST FLOOR INTO HOME PROFESSIONAL OFFICE. PROVIDE NEW ACCESSORY ENTRANCE STEP TO THE DWELLING UNIT. ALSO PROVIDE NEW ENTRANCE DOOR THROUGH EXISTING MASONRY WALL USING EXISTING WINDOW OPENING AND NEW WINDOW OPENING
B00712121-I1
01/09/2023
Permit issued — General Construction
B00807136-I1-GC
01/04/2023
Filed — Alteration
FRONT FACADE PARAPET RESTORATION WORK AS PER INDICATED IN THE PLAN. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B00807136-I1
01/03/2023
Special inspection requirement — Masonry
MAHFUZAR RAHMAN
01/03/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
MAHFUZAR RAHMAN
01/03/2023
Special inspection requirement — Tenant Protection Plan Compliance
MAHFUZAR RAHMAN
01/03/2023
Special inspection requirement — Final
MAHFUZAR RAHMAN
11/10/2022
Permit issued — General Construction
B00712121-I1-GC
10/27/2022
Special inspection requirement — Final
HANSA PERSAUD
10/27/2022
Special inspection requirement — Energy Code Compliance Inspections
Akeeb Shekoni
10/27/2022
Special inspection requirement — Concrete - Cast-In-Place
Akeeb Shekoni
10/27/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Akeeb Shekoni
10/27/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Akeeb Shekoni
10/27/2022
Special inspection requirement — Fire-Resistance Rated Construction
Akeeb Shekoni
10/26/2022
Objection resolved — Addressed
10/19/2022
Objection raised — Fire_Protection
10/14/2022
Filed — Alteration
CONVERT PART OF DWELLING UNIT ON THE FIRST FLOOR INTO HOME PROFESSIONAL OFFICE. PROVIDE NEW ACCESSORY ENTRANCE STEP TO THE DWELLING UNIT. ALSO PROVIDE NEW ENTRANCE DOOR THROUGH EXISTING MASONRY WALL USING EXISTING WINDOW OPENING AND NEW WINDOW OPENING
B00712121-P1
10/10/2022
Special inspection requirement — Final
10/10/2022
Special inspection requirement — Concrete - Cast-In-Place
Akeeb Shekoni
10/10/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Akeeb Shekoni
10/10/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Akeeb Shekoni
10/10/2022
Special inspection requirement — Energy Code Compliance Inspections
Akeeb Shekoni
10/10/2022
Special inspection requirement — Fire-Resistance Rated Construction
Akeeb Shekoni
05/09/2022
Filed — Alteration
CONVERT PART OF DWELLING UNIT ON THE FIRST FLOOR INTO HOME PROFESSIONAL OFFICE. PROVIDE NEW ACCESSORY ENTRANCE STEP TO THE DWELLING UNIT. ALSO PROVIDE NEW ENTRANCE DOOR THROUGH EXISTING MASONRY WALL USING EXISTING WINDOW OPENING AND NEW WINDOW OPENING
B00712121-I1
10/30/2019
Violation issued (HPD, closed)
I
11/10/2016
Violation issued (HPD, closed)
I
03/01/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offEXCLUSIVE CONSTRUCTION04/24/2023
DOB NOWGeneral ConstructionSigned-offEXCLUSIVE CONSTRUCTION01/09/2023
DOB NOWGeneral ConstructionSigned-offEXCLUSIVE CONSTRUCTION11/10/2022
1 project · most recent 10/14/2022
FiledStatusContractorScope
10/14/2022Signed-offEXCLUSIVE CONSTRUCTION2 scope_items
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
01/03/2023MasonryMAHFUZAR RAHMANspecial
01/03/2023Structural Stability – Alterations of existing buildingsMAHFUZAR RAHMANspecial
01/03/2023Tenant Protection Plan ComplianceMAHFUZAR RAHMANspecial
01/03/2023FinalMAHFUZAR RAHMANprogress
10/27/2022FinalHANSA PERSAUDprogress
10/27/2022Energy Code Compliance InspectionsAkeeb Shekoniprogress
10/27/2022Concrete - Cast-In-PlaceAkeeb Shekonispecial
10/27/2022Structural Stability – Alterations of existing buildingsAkeeb Shekonispecial
10/27/2022Fire-Resistant Penetrations and JointsAkeeb Shekonispecial
10/27/2022Fire-Resistance Rated ConstructionAkeeb Shekoniprogress
10/10/2022Final—progress
10/10/2022Concrete - Cast-In-PlaceAkeeb Shekonispecial
10/10/2022Fire-Resistant Penetrations and JointsAkeeb Shekonispecial
10/10/2022Structural Stability – Alterations of existing buildingsAkeeb Shekonispecial
10/10/2022Energy Code Compliance InspectionsAkeeb Shekoniprogress
10/10/2022Fire-Resistance Rated ConstructionAkeeb Shekoniprogress
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/29/2026B00712121-I1Request digital key ↗
08/28/2026B00807136-I1Request digital key ↗
08/15/2026B00712121-P1Request digital key ↗
▸Seals & Professional Certifications10
▸DOB NOWSpecial Inspector Seal & Signature4
08/23/2026B00712121-I1Open ↗
08/22/2026B00807136-I1Open ↗
08/22/2026B00807136-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/29/2026B00712121-I1Open ↗
08/29/2026B00712121-P1Open ↗
08/28/2026B00807136-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
08/23/2026B00712121-I1Open ↗
08/23/2026B00712121-I1Open ↗
08/22/2026B00807136-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/29/2026B00712121-I1Open ↗
08/28/2026B00807136-I1Open ↗
08/15/2026B00712121-P1Open ↗